Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FUU.V ·

Drilling at JR Zone Continues Focusing on Up Dip and Down Dip

Exploration Programs

Drilling at JR Zone Continues Focusing on Up

Dip and Down Dip

Kelowna, British Columbia--(Newsfile Corp. - October 25, 2023) -

F3 Uranium Corp.

(TSXV: FUU)

(OTCQB: FUUFF)

("

F3

" or "

the Company

") is pleased to clarify that ongoing drilling with one diamond

drill at the JR Zone which has been defined over a strike length of 156m is filling in up and down dip on

section lines where the mineralization remains open. A second diamond drill that is focused on

exploration drilling to the south of the JR Zone along the A1B conductor continues to intersect

encouraging signs for potential proximal mineralization. The current extended fall drill program is

anticipated to continue until December when there is anticipated to be a break over the Christmas

season before drilling is set to resume in the new year.

Raymond Ashley, President, commented:

"The JR Zone, which is the most exciting recent discovery in the Athabasca Basin, is located at the north

end of the conductive corridor which contains the A1 and parallel and offset A1B conductors. Many of the

uranium deposits in the Athabasca Basin occur as individual and separate mineralized zones along a

linear conductive geological fault structure, so called pearls on a string. The MobileMT electromagnetic

survey has expanded the strike length of this prospective corridor by one third, to a total of 4.9km, and

has thereby substantially increased the strike length for potential additional mineralized zones.

Continuing to intersect many of the hallmarks that identify the A1 main shear zone with drilling at A1B,

and knowing that the funds are in place for continued aggressive exploration, has the team excited about

the potential for the discovery of a second mineralized zone at PLN."

About Patterson Lake North:

The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within

the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen

Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area

of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial

Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km

northwest of Fission Uranium's Triple R deposit.

Qualified Person:

The technical information in this news release has been prepare in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by

Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has

verified the data disclosed.

About F3 Uranium Corp.:

F3 Uranium is advancing the newly discovered high-grade JR Zone on the PLN Property in the Western

Athabasca Basin. This area of Saskatchewan is poised to become a major uranium producing region

and is home to large deposits including Triple R, Arrow and Shea Creek. F3 Uranium currently holds 18

projects across the Athabasca Basin.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable

securities laws. All statements that are not historical facts, including without limitation, statements

regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions,

expectations or beliefs of future performance, including statements regarding the suitability of the

Properties for mining exploration, future payments, issuance of shares and work commitment funds,

entry into of a definitive option agreement respecting the Properties, are "forward-looking statements."

These forward-looking statements reflect the expectations or beliefs of management of the Company

based on information currently available to it. Forward-Looking statements are subject to a number of

risks and uncertainties, including those detailed from time to time in filings made by the Company with

securities regulatory authorities, which may cause actual outcomes to differ materially from those

discussed in the forward-looking statements. These factors should be considered carefully and readers

are cautioned not to place undue reliance on such forward-looking statements. The forward-looking

statements and information contained in this news release are made as of the date hereof and the

Company undertakes no obligation to update publicly or revise any forward-looking statements or

information, whether as a result of new information, future events or otherwise, unless so required by

applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or

disapproved the contents of this press release, and do not accept responsibility for the adequacy or

accuracy of this release.

F3 Uranium Corp.

750-1620 Dickson Avenue

Kelowna, BC V1Y9Y2

Contact Information

Investor Relations

Telephone: 778 484 8030

Email:

[email protected]

ON BEHALF OF THE BOARD

"Dev Randhawa"

Dev Randhawa, CEO

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/185162