Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FUTR.CN ·

MOU with First Nations & Receives Work Permit

Permits & Approvals Partnerships & JV

789 West Pender St., Suite 810

Vancouver, BC V6C 1H2

Tel: 604-687-2038

www.goldnfuturesmineralcorp.com

NEWS RELEASE CSE: FUTR

OTC: GFTRF

November 23, 2021 FSE: G6M

GOLD’N FUTURES SIGNS MOU WITH FIRST NATIONS & RECEIVES WORK PERMIT

FOR THE HERCULES GOLD PROJECT NEAR GERALDTON, ONTARIO

VANCOUVER, BC -- (Newsfile – November 23, 2021) Gold’n Futures Mineral Corp. (CSE: FUTR) (FSE:

G6M), (OTC: GFTRF) (the " Company” or “ Gold’n Futures ”) reports it has signed a Memorandum of

Understanding (“MOU”) with the three local Anishinaabe First Nation s respecting the Hercules Gold

Project. The First Nations that are party to the MOU are Animbiigoo Zaagi’igan Anishinaabek (“ AZA”),

Bingwi Neyaashi Anishinaabek (“ BNA”) and Biinjitiwaabik Zaaging Anishinaabek (“ BZA”). As the

Hercules project lies within their traditional territories, the First Nations are important stakeholders in

Hercules project and its exploration programs . The Company, AZA, BNA and BZA are collectively

referred to as the “Parties”.

“The discussions, emails and document exchanges betwe en the representatives of the local

Indigenous communities and Gold’n Futures have resulted in founding a new , respectful

relationship. Certainly, the evolv ing spirit of co-operation will be exceedingly beneficial to all

of the Parties. We have also star ted planning our next co -operative undertakings comprising

adoption of Environmental, Social and Governance policies for the Company and establishing

the lines of communication to ensure Gold’n Futures operations are sustainable and

environmentally responsible.”

Commented, Stephen Wilkinson, President and CEO

The MOU sets out a communication protocol between the Parties , establishes a framework for the

relationship between the Parties and charts a negotiating path for a pending Exploration Agreement. In

addition, the MOU marks the completion of the very important review and approval of Gold’n Futures’

exploration permit, allowing the Ontario Ministry of Northern Development and Mines Natural

Resources a nd Forestry , Mineral Development Branch (NDMNRF) to issue the work permit. The

immediate next step will be the commencement of negotiations towards executing the Exploration

Agreement between Gold’n Futures and the First Nation communities.

Hercules Exploration Program & Permit Update

GoldSpot Discoveries Corp. (TSXV: SPOT) (OTCQX: SPOFF) (“GoldSpot”) had its geophysical team on the

Hercules property starting on October 20 th, 2021. During the first two weeks of November, GoldSpot

completed i ts proprietary airborne geophysical survey s utilizing its Multi- Parameter Airborne Survey

System (“M-PASS”) with Triaxial Magnetic Gradiometer and Very Low Frequency Electromagnetic ( VLF-

EM) Platform. The airborne surveys covered the entire 109 square kilometres of the Hercules property,

flying approximately 1,200 line -kilometres with 100 -metre line spacing. The Company anticipates

GoldSpot will be delivering its preliminary findings of the airborne geophysical surveys in December ,

2021. In addition, GoldSpot will use its artificial intelligence algorithms to reinterpret the Hercules

property’s structural geology, resource geology, and geophysical surveys to put together the highest

priority targets for exploration and drilling and , over the coming months , present its recommendations

to Gold’n Futures.

On November 18 th 2021, the Company received its exploration permit that is effective for a period of

three years. With its permit in -hand, Gold’n Futures will commence its inaugural drill program before

the end of November 2021 with the area of interest for the drilling occupying an area measuring

approximately 2.8 km by 4.6 km , approximately 1,310 hectares (“ha”) . The area of interest is centered

upon the Hercules historical gold resources and specifically the Golden Mile gold system. The inaugural

drill program is budgeted for up to 1,500 metres (“m”) comprising ten drill holes. The objective of the

first round of drilling will be to target areas for structural and grade continuity beyond the historical

resource. The Company expects this first round of drilling to be completed before the December 2021

holidays with resumption of the continuing drill program in mid-January.

Qualified Person

The scientific and technical content of this press release has been prepared, reviewed and approved by

Mr. Walter Hanych, P. Geo., who is a Qualified Person under NI 43 -101 regulations and is a director of

the Company.

About Gold’n Futures Mineral Corp.

Gold’n Futures Mineral Corp. (CSE: FUTR) (FSE: G6M) (OTC: GFTRF) is a Canadian based exploration

company focused on advancing its Hercules gold project . The Hercules is located 200 kilometres

northeast of Thunder Bay, Ont., in the townships of Elmh irst and Rickaby, within the Thunder Bay North

Mining District. The Project is in the heart of the Beardmore – Geraldton gold mining camp , the 4 th

largest gold camp in Canada and is 40 km west of the Hardrock -Greenstone gold mine development.

The property lies within an Archean greenstone belt that extends from the Longlac area in the east to

Lake Nipigon in the west, a di stance of about 130 kilometres and consists of 475 contiguous claim cells

(10,052 ha). From the historical work completed on the property , the Company has built an extensive

database including reconnaissance grab samples; channel samples; a variety of geophysical surveys; and,

a drill hole database that includes historical drilling totalling in the order of 537 holes with more than

107,000m of d rill core . With surface grab samples grading up to Grab samples up 10,374 g/t and

channel samples up to 32.96 g/t across 11.6 m , the Hercules gold zones offer top tier targets for the

expansion of its historical resources.

For more information, please visit our website at: www.goldnfuturesmineralcorp.com

On behalf of the Board of Directors

For further information

Stephen Wilkinson,

President and CEO

The Canadian Securities Exchange accepts no responsibility for the adequacy or accuracy of this release.

This news release may contain forward- looking statements based on assumptions and judgments of management regarding

future events or results. Such statements are subject to a variety of risks and uncertainties which could cause actual events or

results to differ materially from those reflected in the forward- looking statements. There is no assurance the private placement,

property option, change of board or reinstatement of trading referred to above will close on the terms as stated, or at all. The

Company disclaims any intention or obligation to revise or update such statements.