Fuse Battery Metals intercepted 7.75% Co and 5.44% Ni over 0.42m at

Glencore-Bucke

Coquitlam, BC, September 5, 2023 – Fuse Battery Metals Inc. (“the Company” or “Fuse”) (TSXV:

FUSE, OTCQB: FUSEF, FRA: 43W3) is pleased to announce the Company has received assay results

from the recently completed drill program at the Glencore Bucke Project located just outside Cobalt

Ontario and near the cobalt refinery of Electra Battery Metals Corporation (NASDAQ: ELBM).

“We are pleased with the drill results from GB22-55 to GB22-58 as they suggest structures are

continuing southward towards the Teledyne property. GB22-56 has 2% Cobalt, 0.95% Ni, 1.15 gpt

Au and 24.81 gpt Ag over 1.53m. We are excited to continue to evaluate the mineralization along

trend at the Teledyne.” Comments Tim Fernback, Fuse President & CEO. “We are pleased that the

holes testing the extension of copper-cobalt zone have come back positive with many intervals being

over 5m core length.”

The drill program was engineered to follow-up existing intercepts from the 2017-2018 drill

programs in addition to testing the First Priority Targets outlined in the geophysical report

completed by Simcoe Geoscience in August 2022. The 2022 drill program had a budget of

CAD$500,000. The drill program completed 13 drill holes for a total of 1842 meters.

Towards the North-West part of the property, five drill holes were planned to follow up on the areas

underneath T-18, GB17-21, GB18-36, and GB17-15 further down-dip of the existing structures. They

were designed to test the vein continuity, as well as test the continuation of the copper-rich sulphide

zones previously encountered. These include drill holes GB22-46, GB22-47. GB22-48, GB22-49, and

GB22-50. The results from these drill holes are comparable to the intercepts encountered in previous

drill programs, and prove the mineralization continues further at depth in the Main Zone.

The drill was then moved east and southward to test the geophysical IP anomalies and interpreted

structural features that may be of interest. Four holes were planned to test these features. They

include holes GB22-51, GB22-52, GB22-53, and GB22-54. No significant values were intercepted in

these holes.

Towards the South part of the property, four holes were planned with three purposes in mind. The

first was to follow-up existing intercepts from GB18-44. The second was test the geophysical targets

in this area, and the third was to determine if any of the structures or veins continue southward and

trend onto the Teledyne property. These holes include GB22-55, GB22-56, GB22-57, and GB22-58.

These holes contained two excellent Cobalt results and suggests the mineralization may in fact

continue further southward onto Teledyne.

Assay Result Highlights

 There are 6 intervals greater than 5.0m core length with cobalt equivalent grades above 0.1%.

 GB22-46 intercepted 1.8% Cu over 5.58m from 101.39 to 106.97m, including 3.54% Cu over

1.00m from 105.00 to 106.00m. It also intercepted 0.39% Co and 0.58% Cu over 0.75m

from 137.70m to 138.45m.

2

 GB22-47 intercepted 2.06% Cu and 0.18% Co over 6.85m from 103.15 to 110.00m,

including 3.94% Cu and 0.84% Co over 0.54m from 104.91 to 105.45m.

 GB22-49 intercepted 1.46% Cu over 2.00m from 123.00 to 125.00m.

 GB22-50 intercepted 7.75% Co and 5.44% Ni over 0.42m from 55.38 to 55.80m, and

2.17% Cu over 3.93m from 66.88 to 70.81m, including 4.01% Cu over 0.93m from 67.87

to 68.80m.

 GB22-55 intercepted 5.71% Co and 3.14% Ni over 0.47m from 64.16 to 64.63m.

 GB22-56 intercepted 5.56 % Co and 2.66 % Ni over 0.52m from 99.00 to 99.52m.

 GB22-50 contained up to 11.9 grams per tonne Au from initial statistics the gold grade is

strongly correlated with Nickel and Cobalt. Nickel and Cobalt also have a strong correlation.

Table 1: Composites greater than 2m with Cobalt Equivalent greater than 0.1%

Hole From To Length (m) Au (gpt) Ag (gpt) Co (%) Cu (%) Ni (%) Co eq (%)

GB22-46 101.39 106.97 5.58 0.04 17.39 0.10 1.80 0.02 0.52

GB22-47 103.15 110.00 6.85 0.06 24.26 0.18 2.06 0.03 0.66

GB22-47 132.40 134.90 2.50 0.04 33.62 0.02 2.05 0.01 0.48

GB22-49 90.00 95.00 5.00 0.03 18.00 0.03 0.59 0.02 0.17

GB22-49 123.00 125.00 2.00 0.01 22.50 0.06 1.46 0.01 0.39

GB22-50 66.88 70.81 3.93 0.01 20.61 0.01 2.17 0.02 0.51

GB22-50 100.00 105.00 5.00 0.02 9.28 0.02 1.32 0.01 0.33

GB22-50 109.00 114.00 5.00 0.02 24.46 0.08 1.32 0.01 0.39

Table 2: Assay Results

Hole From To Length (m) Au (gpt) Ag (gpt) Co (%) Cu (%) Ni (%) Co eq (%)

GB22-46 10.75 11.25 0.50 0.01 0.30 0.00 2.10 0.01 0.48

GB22-46 101.39 106.97 5.58 0.04 17.39 0.10 1.80 0.02 0.52

including 104.10 105.00 0.90 0.11 32.00 0.44 2.75 0.09 1.11

including 105.00 106.00 1.00 0.01 24.20 0.01 3.46 0.01 0.79

GB22-46 137.70 138.45 0.75 0.09 94.10 0.39 0.58 0.02 0.54

GB22-47 9.54 10.04 0.50 0.02 0.20 0.01 0.95 0.01 0.23

GB22-47 98.15 99.65 1.50 0.03 9.85 0.05 0.26 0.01 0.12

GB22-47 103.15 110.00 6.85 0.06 24.26 0.18 2.06 0.03 0.66

including 104.15 104.91 0.76 0.13 37.90 0.19 3.03 0.05 0.90

including 104.91 105.45 0.54 0.33 19.70 0.84 3.94 0.12 1.80

including 105.45 106.20 0.75 0.01 22.90 0.01 3.40 0.00 0.77

including 106.20 106.80 0.60 0.15 30.20 0.99 2.39 0.08 1.58

GB22-47 113.00 114.00 1.00 0.21 19.60 0.03 0.89 0.01 0.24

GB22-47 132.40 134.90 2.50 0.04 33.62 0.02 2.05 0.01 0.48

including 134.10 134.90 0.80 0.08 29.10 0.03 3.04 0.01 0.72

GB22-47 137.15 138.15 1.00 0.97 17.70 0.07 1.00 0.02 0.30

GB22-48 110.20 110.69 0.49 0.07 33.10 0.01 0.78 0.03 0.21

GB22-48 140.41 142.00 1.59 0.12 7.64 0.11 0.14 0.01 0.15

GB22-49 90.00 95.00 5.00 0.03 18.00 0.03 0.59 0.02 0.17

including 92.00 93.00 1.00 0.04 20.60 0.01 0.73 0.02 0.18

3

Hole From To Length (m) Au (gpt) Ag (gpt) Co (%) Cu (%) Ni (%) Co eq (%)

including 93.00 94.00 1.00 0.02 30.20 0.02 0.73 0.01 0.20

including 94.00 95.00 1.00 0.01 21.30 0.01 0.89 0.02 0.22

GB22-49 123.00 125.00 2.00 0.01 22.50 0.06 1.46 0.01 0.39

GB22-50 49.34 50.97 1.63 0.02 5.61 0.05 0.16 0.12 0.16

GB22-50 55.38 55.80 0.42 11.90 64.40 7.75 0.08 5.44 11.13

GB22-50 66.88 70.81 3.93 0.01 20.61 0.01 2.17 0.02 0.51

including 67.87 68.80 0.93 0.02 34.20 0.01 4.01 0.01 0.92

GB22-50 100.00 105.00 5.00 0.02 9.28 0.02 1.32 0.01 0.33

including 104.00 105.00 1.00 0.03 21.00 0.06 2.26 0.02 0.58

GB22-50 109.00 114.00 5.00 0.02 24.46 0.08 1.32 0.01 0.39

including 112.00 113.00 1.00 0.06 48.90 0.35 0.72 0.02 0.53

including 113.00 114.00 1.00 0.01 42.40 0.02 2.16 0.01 0.51

GB22-55 64.16 64.63 0.47 0.46 5.10 5.71 0.00 3.14 7.65

GB22-55 68.36 68.88 0.52 0.10 1.10 0.30 0.00 0.11 0.37

GB22-55 133.56 135.03 1.47 0.05 10.97 0.22 0.30 0.08 0.34

including 134.55 135.03 0.48 0.13 16.90 0.68 0.01 0.21 0.81

GB22-56 96.00 96.43 0.43 0.16 44.50 0.72 0.01 0.14 0.81

GB22-56 99.00 100.53 1.53 1.15 24.81 2.00 0.00 0.95 2.59

including 99.00 99.52 0.52 2.58 59.40 5.56 0.00 2.66 7.20

GB22-57 64.88 65.35 0.47 0.03 3.30 0.17 0.00 0.05 0.20

GB22-57 68.00 68.48 0.48 0.01 2.30 0.09 0.00 0.02 0.10

GB22-57 69.85 70.88 1.03 0.01 0.70 0.15 0.00 0.04 0.18

GB22-57 75.00 75.57 0.57 0.05 3.90 0.16 0.15 0.06 0.24

Note: The intervals provided in this table represent core length and not true widths. The bolded intervals are

composite assay calculations. Assay results reported as significant are >0.10% cobalt equivalent Gold and Silver

are not included in the cobalt equivalent and are simply length weighted over the interval.

𝐶𝑜 𝐸𝑞 % =

଴.଴ଷଷସଶ [$

೒]∗஼௢ [௣௣௠]ା଴.଴଴଻ସଽ[$

೒]∗஼௨ [௣௣௠]ା଴.଴ଶ଴଺ଶଵ[$

೒]∗ே௜ [௣௣௠]

଴.଴ଷଷସଶ[$

೒]∗ଵ଴,଴଴଴[೛೛೘

% ]

Price assumptions: Cobalt $33,420 USD/mT, Copper $3.7441 USD/lb, Nickel $20,621 USD/mT

*no metallurgical recovery or other parameters applied to the Cobalt Equivalent, this is an in-situ value. The Cobalt

equivalent is strictly used here to compare multi-metallic results and is subject to variations in metal price. Silver

was not included in the Cobalt equivalent and should be evaluated separately.

Table 3: Collar Locations

Nad 83 - Zone 17 N

Hole Azimuth Dip Length Easting Northing Elevation

GB22-46 264.9 -46.0 141 604,580 5,252,077 252

GB22-47 264.9 -46.0 141 604,580 5,252,077 252

GB22-48 270.2 -48.0 180 604,609 5,252,089 246

GB22-49 270.0 -46.3 150 604,541 5,252,112 246

GB22-50 263.1 -45.7 150 604,541 5,252,112 246

GB22-51 270.1 -44.9 90 604,576 5,252,150 246

GB22-52 160.3 -45.1 150 604,619 5,251,970 246

4

GB22-53 90.0 -45.0 144 604,619 5,251,970 246

GB22-54 90.1 -45.0 171 604,602 5,252,125 246

GB22-55 89.9 -54.9 141 604,466 5,251,843 246

GB22-56 90.0 -65.0 150 604,466 5,251,843 246

GB22-57 90.0 -50.0 114 604,457 5,251,806 246

GB22-58 90.0 -63.0 120 604,403 5,251,826 246

Prior diamond drilling highlights from the 2017-2018 drill campaign include:

 GB17-07 intersected 7.64% Co over 0.26m from 99.79 to 100.05m.

 GB17-10 intersected 0.55% Co over 5.00m from 28.00 to 33.00m.

 GB17-15 intersected 0.90% Cu over 20.20m from 42.50 to 62.70m, including 8.42% Co

over 0.30m from 62.40 to 62.70m.

 GB17-21 intersected 1.25% Cu over 6.10m from 67.50 to 73.60m, including 0.73% Co

over 0.60m from 69.7 to 70.30m.

 GB18-44 intersected 0.11% Co and 1.04% Cu over 8.40m from 110.60 to 119.00m.

Note: The above intervals represent core lengths, and not true widths (NI 43-101 Technical Report on the

Teledyne Cobalt and Glencore Bucke Project Feb 4, 2021).

The Glencore Bucke Property consists of two patented mining claims totaling approximately 16.2 ha

in area located on the west boundary of Fuse’s Teledyne Cobalt Project. The company recognizes the

significant exploration potential that the Property has due to the possible southern extensions of

veins from the Cobalt Contact Mine property adjoining to the north that could project southward onto

the Property. Their work delineated two mineralized zones, named the Main Zone and Northwest

Zone, measuring 500 ft (152.4 m) and 200 ft (70.0 m) in length respectively on the Glencore Bucke

property.

The technical contents of this news release regarding previous drilling campaigns are contained in

the NI 43-101 Technical Report on the Teledyne Cobalt and Glencore Bucke Project Feb 4, 2021, by

Joerg Kleinboeck P. Geo and David Jamieson P. Geo and can be found on Sedar (www.sedar.com)

QA / QC

The core samples were cut in two with a rock saw. One half was sent to the assay lab and the other

half was retained as witness core. Blanks and certified reference material (standards) were inserted

into the sampling sequence such that they represent no less than 10% of the total samples. The

results of the blanks and standards are within expected values allowing public disclosure of the

assays.

Qualified Person

The technical information in this news release was approved and prepared under the supervision of

Mr. Matthew Halliday, P.Geo., (PGO), President and COO of Canada Silver Cobalt Works Inc., a

qualified person accordance with National Instrument 43-101.

5

In other news, the Company has recently refiled its December 31, 2022 Annual MD&A on August 25,

2023 on SEDAR, noting a change in the named Qualified Person (“QP”) from Gerhard Kiessling

(former QP) to Matt Halliday (current QP) with no other changes to the document. This new

disclosure correctly states that the Company’s filed MD&A disclosure on Fuse’s Ontario Cobalt

Properties was reviewed by Matt Halliday as Company QP.

About Fuse Battery Metals Inc. https://fusecobalt.com/

Fuse Battery Metals Inc. is a Canadian based exploration company that trades under the symbol FUSE

on the TSX Venture Exchange. The Company's focus is on exploration for high value metals required

for the manufacturing of batteries.

Nevada Lithium Properties

Fuse owns 100% of the Lithium Springs Property which is located at the southern end of Black

Rock Desert, Nevada, about 132 air-line km north-northeast of Reno, Nevada in Sections 1, 2, 11, and

12 Township 32 North, Range 23. The center of the property is about 40.676° North Latitude,

119.331° West Longitude, (40° 40’ 33” N, 119° 19’ 52”): UTM X 302,900 UTMY 4,505,400 NAD 27;

Zone 11 N. Black Rock Desert basin is about 110 km long and up to 25 km wide at the widest point.

The central playa measures about 50 km northeast - southwest and 10 km southeast - northwest.

The western arm of the Black Rock Desert covers an area of about 2,000 square kilometers and

contains 5 of the 30 currently listed Known Geothermal Resource Areas in Nevada.

Fuse also owns 100% of the Monitor Valley North Lithium Property which includes 97 placer

claims (MVN1 – MVN97) covering approximately 770 hectares of alluvial sediments and clays located

134 km northeast of Tonopah, Nevada. The property is located in Monitor Valley, Nevada, and the

center of the property is about 39.21° North Latitude, 116.65° West Longitude. The property is 55

km due west of the Little Smokey Valley, Nevada where exploration for lithium is ongoing.

Ontario Cobalt Properties

Fuse owns a 100% interest its Glencore Bucke Property, situated in Bucke Township, 6 km east-

northeast of Cobalt, Ontario, subject to a back-in provision, production royalty and off-take

agreement. The Glencore Bucke Property consists of 16.2 hectares and sits along the west boundary

of Fuse’s Teledyne Cobalt Project. The Company also owns a 100% interest, subject to a royalty, in

the Teledyne Project located near Cobalt, Ontario. The Teledyne Property adjoins the south and west

boundaries of claims that hosted the Agnico Mine.

Glencore Bucke/Teledyne Property

Situated in Bucke Township, 6 km east-northeast of Cobalt, Ontario the Glencore Bucke Property

adjoins, on its northeast corner, the former cobalt producing Agaunico Mine. From 1905 through to

1961, the Agaunico Mine produced a total of 4,350,000 lbs. of cobalt (“Co”), and 980,000 oz of silver

(“Ag”) (Cunningham-Dunlop, 1979). The amount of cobalt produced from the Agaunico Mine is

greater than that of any other mine in the Cobalt Mining Camp. Production ceased in 1961 due

to depressed Co prices and over-supply (Thomson, 1964). The Glencore property is 100% owned by

Fuse Cobalt subject to a back-in provision, production royalty and off-take agreement.

The associated Teledyne Property, located in Bucke and Lorrain Townships, consists of 5 patented

mining claims totaling 79.1 ha, and 46 unpatented mining claim cells totaling approximately 700 ha.

The Property is easily accessible by highway 567 and a well-maintained secondary road.

6

Over CAD$25 million has been spent thus far, (2020 dollars inflation-adjusted) on the Teledyne

Property resulting in valuable infrastructure including a development ramp and a modern decline

going down 500 ft parallel to the main cobalt mineralized vein. The Teledyne Property is subject to a

production royalty in favor of New Found Gold and an off-take agreement in favor of Glencore Canada

Corp., while the Glencore Bucke Property is subject to a back-in provision, production royalty, and an

off-take agreement in favor of Glencore Canada Corp. Glencore PLC is the world’s largest producer of

cobalt. A significant portion of the cobalt that was produced at the Agaunico Mine was located

along structures (Vein #15) that extended southward towards the northern boundary of the

Teledyne Cobalt Property, currently 100% owned by FUSE. Mineralization was generally located

within 125 ft (38.1 m) above the Huronian/Archean unconformity. Stoping widths of up to 50 ft (15.2

m) were not unusual at the Agaunico Mine (Cunningham-Dunlop, 1979).

On Behalf of the Board of Directors

“Tim Fernback”

Tim Fernback, President & CEO

Contact Information:

Email: [email protected]

Phone: 236-521-0207

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward Looking Statements: This release contains forward-looking statements that

involve risks and uncertainties. These statements may differ materially from actual future events or results and are

based on current expectations or beliefs. For this purpose, statements of historical fact may be deemed to be

forward-looking statements. In addition, forward-looking statements include statements in which the Company uses

words such as “continue”, “efforts”, “expect”, “believe”, “anticipate”, “confident”, “intend”, “strategy”, “plan”,

“will”, “estimate”, “project”, “goal”, “target”, “prospects”, “optimistic” or similar expressions. These statements by

their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of

important factors, including, among others, the Company’s ability and continuation of efforts to timely and

completely make available adequate current public information, additional or different regulatory and legal

requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by

the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that

could cause actual results to differ from those contained in the forward-looking statements. The Company does not

undertake any obligation to review or confirm analysts’ expectations or estimates or to release publicly any revisions

to any forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence

of unanticipated events. Investors should not place undue reliance on forward-looking statements.