Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FTUR.V ·

Saville Resources Inc. Advances the Mallard Prospect with Mineralogical Analysis Ahead of 2020 Exploration

Metallurgy & Processing

1450, 789 West Pender Street

Vancouver, BC V6C 1H2

t. 604 681 1568

www.savilleres.com

Saville Resources Inc. Advances the Mallard Prospect with Mineralogical Analysis

Ahead of 2020 Exploration

February 6th, 2020 – Saville Resources Inc. (TSXv: SRE, FSE: S0J) (the “Company” or “Saville”) is pleased

to announce that it has completed preliminary mineralogical analysis on a suite of rock samples from the

Mallard Prospect, situated within the Niobium Claim Group Property (the “Property”), Quebec. The

Mallard Prospect is characterized by numerous drill intersections of high-grade n iobium, along with

variably associated high grades of tantalum, phosphate, and fluorspar.

Optical and scanning electron microscope (SEM) mineralogical analysis of thin sections was carried-out

on a total of fifteen (15) core samples collected during the 2019 drill program completed at the Mallard

Prospect. Analysis was completed at the University of Windsor as part of a research project related to

the genesis of the Eldor Carbonatite Complex and its niobium mineralizing event(s). The main highlights

indicated from the preliminary work are as follows:

1. Pyrochlore and columbite are the dominant niobium minerals present

2. There are indications that niobium has been mobilized – a mechanism that could potential ly

enhance the grade of a deposit

3. Mineralogy supports the model of a continuous niobium mineralized trend through the complex

Pyrochlore and columbite are the domina nt source minerals for niobium globally, and all the work to

date by the Company indicates that these are also the primary niobium-bearing minerals present on the

Property. In addition, grain sizes for the niobium minerals in the samples analyzed are estimated to range

from 0.03 mm to 3 mm, and are most commonly between 0.05 mm and 0.4 mm. These grain sizes are

encouraging from a commercial mineral processing perspective (see Figure 1).

From an exploration perspective, the mineralogical work on the Mallard core samples reported herein is

very encouraging and supports the prior work completed on surface rock and drill core samples from

other niobium-bearing areas of the complex, notably; the Northwest, Miranna, Spoke, and South Mallard

areas. Moreover, collectively, the data supports a continuous niobium mineralized trend connecting

through these areas, whereby Mallard, and potentially other targets/prospects, form key zones of higher

grade – potentially outlining areas where the niobium has preferentially mobilized to augment the grade.

Figure 1: Pyrochlore minerals in carbonate matrix (drill hole EC19-172)

In addition to the mineralogical work , as part of the research project at the University of Windsor, a

hydrochloric acid (HCl) leach to remove carbonates was completed on a piece of drill core from Mallard

in order to recover apatite for oxygen isotope analysis. However, as the pyrochlore mineral is resistant to

HCl attack, the test also resulted in the liberation of the pyrochlore (see Figure 2 below). The pyrochlore

recovered is of the typical brown colour with an octahedral habit (i.e. a “square bipyramid” shape).

Figure 2: Liberated pyrochlore minerals from HCl leach

Parallels to the Niobec Deposit

Numerous parallels may be drawn between the Company’s Mallard Prospect and the Niobec Deposit,

part of the Saint -Honoré Carbonatite Complex , located approximately 45 km east of Lac Saint -Jean,

Quebec. The Niobec Deposit started production in 1976 – now owned and operated by Magris Resources

Inc. – and it currently accounts for 8 to 10% of global production (1, 2). Both Mallard and Niobec are

carbonatites, a rock type dominated by carbonate minerals along with common accessory oxides,

silicates, apatite, sulphides, fluorite, and barite. The niobium mineralization at Niobec is hosted by fine-

grained (0.2 to 0.8 mm) pyrochlore and columbite minerals, while the recently completed mineralogical

work reported herein indicate that pyrochlore and columbite are the domina nt niobium-bearing

minerals at Mallard and are also of similar grain-size to that of Niobec. In addition, at both Mallard and

Niobec, the mineralization is present as moderate to steeply dipping elongate lenses. At Niobec, these

lenses have been outlined to significant depth (up to 750 m ), while at Mallard the lenses remain to be

delineated, including at depth, having been drill tested to generally less than 200 m vertically (see news

release dated September 16, 2019).

Management notes that mineralization/operations at Niobec may not necessarily be indicative to the

mineralization, or potential for development, of the Company’s Mallard Prospect. To date, no resource

has been determined nor economic studies completed for the Mallard Prospect.

Stock Options Granted

The Company has granted an aggregate of 5,225,000 stock options to certain directors, officers,

employees and consultants of the Company for the purchase of up to 5,225,000 common shares of the

Company pursuant to its Stock Option Plan. All options vest immediately upon the date of grant and are

exercisable for a period of 5 years at a price of $0. 05 per common share. Of the total, an aggregate of

2,700,000 stock options were issued to directors and officers of the Company.

All Securities issued w ill be subject to an Exchange Hold Period (as defined by the policies of the TSX

Venture Exchange) of four months and one day following the original issuance of such securities.

NI 43-101 Disclosure

Darren L. Smith, M.Sc., P .Geo., Dahrouge Geological Consulting Ltd., a Permit holder with the Ordre des

Géologues du Québec and Qualified Person as defined by National Instrument 43 -101, supervised the

preparation of the technical information in this news release.

Sources:

(1) www.niobec.com

(2) Vallieres, D. et al. 2013, NI 43-101 Technical Report, Update on Niobec Expansion, December 2013. IAMGOLD Corp., 203

pgs.

About Saville Resources Inc.

The Company’s principal asset is the Niobium Claim Group Property, situated within the central Labrador

Trough, Quebec, and currently under Earn -In Agreement from Commerce Resources Corp. for up to a

75% interest. The Property consists of 26 contiguous mineral claims, e ncompassing an area of

approximately 1,223 hectares, and is considered highly prospective for niobium and tantalum. The

Property includes portions of the high -priority, and drill ready, Miranna Target where prior boulder

sampling in the area has returned 5 .9% Nb2O5 and 1,220 ppm Ta2O5, as well as the Northwest and

Southeast areas (Mallard Prospect) where drilling has returned wide intercepts of mineralization,

including 0.61% Nb2O5 over 12.0 m (EC08-008) and 1.36% Nb2O5 over 4.5 m, within a larger interval of

0.80% Nb2O5 over 31.5 m (EC19-174A), respectively.

On Behalf of the Board of Directors

SAVILLE RESOURCES INC.

“Mike Hodge”

Mike Hodge

President

Tel: 604.681.1568

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains forward -looking information which is subject to a variety of risks and uncert ainties and other

factors that could cause actual events or results to differ from those projected in the forward -looking statements. Forward

looking statements in this press release include that niobium has been mobilized – a mechanism that could potentia lly

enhance the grade of a deposit ; that Pyrochlore and columbite are the dominant source minerals on the property; that the

data supports a continuous niobium mineralized trend connecting through these areas ; and potentially other

targets/prospects, form key zones of higher grade . . These forward-looking statements are subject to a variety of risks and

uncertainties and other factors that could cause actual events or results to differ materially from those projected in the

forward-looking information. Risks that could change or prevent these statements from coming to fruition include changing

costs for mining and processing; increased capital costs; the timing and content of upcoming work programs; geological

interpretations based on drilling that may change with more detailed information; potential process methods and mineral

recoveries assumption based on limited test work and by comparison to what are considered analogous deposits that with

further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and

despite the current expected viability of the project, conditions changing such that the minerals on our property cannot be

economically mined, or that the required permits to build and operate the envisaged mine can be obtained. The forward -

looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or

revise such information to reflect new events or circumstances, except as required by law.