Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FTUR.V ·

Saville Resources Announces Changes to its Board of Directors

Management Changes

1450, 789 West Pender Street

Vancouver, BC V6C 1H2

t. 604 681 1568

www.savilleres.com

Saville Resources Announces Changes to its Board of Directors

September 18, 2023 – Saville Resources Inc. (TSXv: SRE, FSE: S0J) (the “Company” or

“Saville”) wishes to announce changes to its Board of Directors. Mr. Charn Deol has resigned

as a director of the Company, effective immediately. The Company would like to express its

sincere gratitude to Mr. Deol for his invaluable contributions and dedicated service during

his tenure. His insights and leadership have been instrumental in guidin g the Company

through various strategic decisions.

Additionally, Saville is pleased to announce the appointment of Mr. Kevin Bottomley as a

new director. Mr. Bottomley brings with him a wealth of experience in the mineral

exploration industry and has held various leadership roles in prominent mining companies.

His expertise and vision align well with Saville's goals, and the Company looks forward to

benefiting from his guidance in the coming years.

Mike Hodge, President of Saville Resources Inc., commented, "While we are saddened to see

Mr. Deol depart, we are excited to welcome Mr. Bottomley to our team. His vast experience

and industry knowledge will undoubtedly be an asset to Saville as we continu e our

exploration and development endeavors."

About Saville Resources Inc.

The Company’s principal asset is the Niobium Claim Group Property, situated within the

central Labrador Trough, Quebec, and currently under Earn -In Agreement from Commerce

Resources Corp. for up to a 75% interest. The Property consists of 26 contiguous min eral

claims, encompassing an area of approximately 1,223 hectares, and is considered

prospective for niobium, tantalum, phosphate, and fluorspar. The Property includes the

Miranna Target, where prior boulder sampling in the area has returned 5.9% Nb 2O5 and

1,220 ppm Ta 2O5, as well as the Mallard Prospect where drilling has returned wide

intercepts of mineralization, including 1.00% Nb2O5 over 17.1 m, within a larger interval of

0.82% Nb2O5 over 42.3 m (EC21-175).

On Behalf of the Board of Directors

SAVILLE RESOURCES INC.

“Mike Hodge”

Mike Hodge

President

Tel: 604.681.1568

1450, 789 West Pender Street

Vancouver, BC V6C 1H2

t. 604 681 1568

www.savilleres.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Forward Looking Statements

This news release contains forward -looking statements, which includes any information

about activities, events or developments that the Company believes, expects or anticipates

will or may occur in the future. Forward looking statements in this news release include the

extension of the exploration earn-in agreement and that we anticipate Saville will undertake

a drilling exploration program on the Niobium Claim group property; that Ashram has the

potential to become a long -term supplier to the met -spar and acid-spar markets; and that

the Company is positioning to be one of the lowest cost rare earth element producers

globally. These forward-looking statements are subject to a variety of risks and uncertainties

and other factors that could cause actual even ts or results to differ materially from those

projected in the forward -looking information. Risks that could change or prevent these

events, activities or developments from coming to fruition include: that Saville may not

undertake, or complete, any exploration work on the Niobium Claim group property; that we

may not be able to fully finance any additional exploration on the Ashram Project; that even

if we are able raise capital, costs for exploration activities may increase such that we may not

have sufficient funds to pay for such exploration or processing activities; the timing and

content of any future work programs; geological interpretations based on drilling that may

change with more detailed information; potential process methods and mineral recov eries

assumptions based on limited test work and by comparison to what are considered

analogous deposits that, with further test work, may not be comparable; testing of our

process may not prove successful or samples derived from the Ashram Project may not yield

positive results, and even if such tests are successful or initial sample results are positive,

the economic and other outcomes may not be as expected; the availability of labour and

equipment to undertake future exploration work and testing activit ies; geopolitical risks

which may result in market and economic instability; and despite the current expected

viability of the Ashram Project, conditions changing such that even if metals or minerals are

discovered on the Ashram Project, the project may not be commercially viable; The forward-

looking statements contained in this news release are made as of the date hereof and the

Company assumes no responsibility to update or revise such information to reflect new

events or circumstances, except as required by law.