FPX.V ·

FPX Nickel Reports on Large-Scale Pilot Testwork, With Results Validating Baptiste Flowsheet and Overall Recovery Basis

Metallurgy & Processing

Suite 320 – 1155 West Pender Street

Vancouver, BC Canada V6E 2P4

Tel: 604.681.8600

e-mail: [email protected]

FPX Nickel Reports on Large-Scale Pilot Testwork, With Results

Validating Baptiste Flowsheet and Overall Recovery Basis

Vancouver, January 24, 2023 – FPX Nickel Corp. ( TSX-V: FPX, OTCQB: FPOCF ) (“FPX” or the

“Company”) is pleased to present results from recently completed large-scale pilot testwork, with results

validating both the flowsheet and the 85% Davis Tube Recoverable (“DTR”) nickel recovery assumed in

the 2020 Preliminary Economic Assessment (“2020 PEA”) for the Baptiste Nickel Project (“Baptiste” or

the “Project”) at the Decar Nickel District in central British Columbia. The Company’s current large-scale,

three-phase metallurgical testwork program, which has been ongoing since mid-2021, will conclude in the

second quarter of 2023 and the resulting dataset will support the completion of the Baptiste Preliminary

Feasibility Study (“PFS”).

Highlights

• Large-scale pilot testwork is now complete and sufficient high-grade (> 65% nickel) awaruite

concentrate was produced for downstream hydrometallurgical testing for the production of battery-

grade nickel sulphate

• Large-scale pilot testwork validates the processing strategy for Baptiste, leveraging awaruite’s

ferromagnetism, high density, active surface properties, and very high nickel content into a simple

flowsheet utilizing magnetic separation followed by conventional froth flotation

• Consistent with the PEA, the PFS metallurgical testwork program confirms a minimum 85% DTR

nickel recovery basis for the Baptiste PFS, including:

o Pilot-scale magnetic separation and bench -scale flotation testwork confirm an overall

minimum DTR nickel recovery of 82% to a high-grade awaruite concentrate

o Bench-scale t estwork confirms the potential to improve DTR nickel recovery by an

additional 3-5% through atmospheric leaching of flotation tailings followed by hydroxide

precipitation

“Our current three-phase metallurgical testwork program confirms earlier results that demonstrate the

technical feasibility of the Baptiste Nickel Project,” commented Andrew Osterloh, FPX Nickel’s Vice -

President, Projects. “Large -scale pilot testwork is an effective tool for the Company to validate our

straightforward processing strategy, which is based on awaruite’s unique characteristics, leading to a simple

concentrator flowsheet with a robust recovery basis. As we continue to demonstrate Baptiste’s ability to

produce very high-grade nickel concentrates, we further confirm that Baptiste’s concentrate does not

require intermediate smelting before use in either the stainless steel or electric vehicle battery supply chains,

which is an important value differentiator for the Project.”

Summary

The Baptiste processing strategy leverages awaruite’s distinct properties in a simple, yet robust flowsheet.

The front end of the flowsheet utilizes magnetic separation to create a “magnetics rich” concentrate of

awaruite and magnetite – a process made effective due to awaruite’s ferromagnetism and density. The back

end of the flowsheet then utilizes conventional froth flotation to separate awaruite from magnetite – a

process made effective due to awaruite’s active surface properties and magnetite’s gener al lack of

flotability. Finally, based on awaruite’s very high nickel content, a very high-grade nickel concentrate (50-

65% nickel) can be produced. Figure 1 presents the Baptiste flowsheet and Table 2 in the following section

presents further details on Baptiste’s processing strategy. As noted in Figure 1, a new processing

opportunity treating flotation tailings has been identified, and the results are discussed herein.

Figure 1 – PEA Flowsheet and New Process Opportunity

The Company’s three-phase metallurgical testwork program, which has been ongoing since mid -2021, is

approximately 85% complete and will conclude in the second quarter of 2023. The program includes both

bench- and pilot -scale testwork and evaluates the comminution, magn etic separation, flotation, and

hydrometallurgical unit operations. The overall program will test approximately 2 5 tonnes of material ,

including a life-of-mine master composite, mine phase composites, and a bulk sample from the starter pit

area. Key results from the PFS metallurgical testwork program are presented in Table 1.

Table 1 – Key PFS Metallurgical Testwork Program Results – DTR Ni Recovery

DTR Nickel Recovery PEA Criteria Preliminary PFS Criteria

Stage

Recovery

Primary Magnetic Separation 90% 94%

Cleaner Magnetic Separation 100% 99%

Flotation 94% 88%

Overall Recovery 85% 82%

New Opportunity – Flotation Tails Leaching - 3-5% improvement; leading to

minimum 85% overall

Note that Table 1 presents a preliminary view on PFS recovery criteria, and that the in-progress variability

testwork (see Table 3 in the following section) will confirm final PFS recovery criteria. As noted in Table

1, primary magnetic separation stage recovery has improved versus the 2020 PEA, balancing the effect of

reduced flotation stage recovery versus the 2020 PEA. Additionally, f lotation tailings nickel leaching

represents a significant new opportunity to improve overall nickel recovery to match or exceed the 85%

recovery assumed in the 2020 PEA.

Background

The Company has completed approximately 85% of a three-phase PFS metallurgical test program aimed at

validating the Baptiste processing strategy, flowsheet, and key process parameters. The Baptiste processing

strategy leverages awaruite’s unique characteristics and is summarized in Table 2. The overall program is

summarized in Table 3, resulting in a robust dataset to support the Baptiste PFS. Phase 3 of the program

has been subdivided into three components, as identified in Table 3.

Table 2 – Awaruite’s Distinct Properties and Baptiste’s Processing Strategy

Awaruite Property Value Processing Strategy to Leverage Property

Ferromagnetic Highly ferromagnetic;

approximately ten times more than

magnetite

Use low intensity magnetic separation to cleanly

separate awaruite and other magnetic minerals

(magnetite) away from serpentine gangue minerals

(barren waste rock)

Very Dense Specific gravity of 8.6;

compared to the serpentine gangue

minerals (approximately 2.5-3.0)

Select a coarse primary grind size while maintaining

high primary recoveries by using a hydrocyclone

classifier to preferentially recycle and further grind

awaruite containing particles (i.e. , preferential

grinding of coarse awaruite)

Active Surface

Properties

Comparable to sulphide minerals Use froth flot ation to cleanly separate awaruite

(which is readily floatable) from magnetite (which

does not float under typical froth flotation

conditions)

Very High Nickel

Content

77% nickel

(Ni3Fe)

Produce a mineral concentrate by froth flotation that

is sufficiently high-grade ( 50-65% Ni) and low

enough in impurities to eliminate the need to further

upgrade the concentrate via downstream smelting

Table 3 – Summary of Three-Phase PFS Metallurgical Testwork Program

Phase Objective Key Results Status

1 1. Confirm PEA magnetic separation

results using composite sample

representative of life-of-mine

operations.

2. Expand comminution and grinding

parameter databases.

1. PEA magnetic separation

configuration and results validated,

generating a magnetics-rich feed for

flotation with the potential for recovery

improvement in primary magnetic

separation due to preferential grinding.

2. Generation of a PFS-level

comminution database and provide

inputs into an engineering study to

confirm SAG milling as preferred over

HPGR grinding.

Complete

Refer to FPX

news release

dated December

8th, 2021

Phase Objective Key Results Status

2 1. Confirm nickel mineralogy across

Baptiste resource.

2. Confirm PEA conclusion that froth

flotation can generate high grade nickel

concentrate.

1. Consistent mineralization confirmed

across deposit and confirmation of the

resource DTR nickel basis as a valuable

geometallurgical tool.

2. PEA froth flotation configuration and

results validated, with the generation of a

high-grade nickel concentrate (> 60%

nickel) with a locked cycle recovery of

88%. Alternative flotation regime

identified to potentially reduce circuit

reagent costs and complexity.

Complete

Refer to FPX

news release

dated

July 27th, 2022

3a 1. Large-scale, longer duration pilot

testing to further demonstrate the

recovery benefits observed in Phase 1.

2. Generate sufficient high-grade

awaruite concentrate for

hydrometallurgy testing.

1. Further validation of PEA flowsheet

and confirmation of benefit of

preferential grinding.

2. Sufficient high-grade concentrate

(>65% Ni) generated.

Complete

Refer to this

news release

3b Variability testing to confirm the

homogeneity of the Baptiste resource

and further validate the process design

criteria and design factors.

Testing in progress Results forecast

for release in the

second quarter

of 2023

3c Hydrometallurgy testing program to

optimize previous leach testing, and

conduct purification and nickel

sulphate crystallization testwork to

demonstrate efficient integration into

the battery material supply chain

Testing in progress Results forecast

for release in the

second quarter

of 2023

The overall metallurgical testwork campaign is being overseen by Jeffrey B. Austin, P.Eng., President of

International Metallurgical and Environmental Inc.

Phase 3a –Large-Scale Pilot Testwork

Building on Phase 1 piloting, the Company undertook large-scale pilot testwork to (1) further demonstrate

the recovery benefits of plant-scale processing, and (2) generate sufficient high-grade awaruite concentrate

for hydrometallurgical testing. The Company engaged Corem (Quebec, Canada) to conduct this testwork

based on their expertise in magnetic separation and conventional froth flotation and their extensive, world-

class facilities. FPX’s metallurgical team worked closely with Corem to optimize a wide range of

parameters for each unit operation in the flowsheet, which was only possible due to the large overall scale

of the pilot testwork.

Initial results of the large-scale pilot testwork were reported in the Phase 2 news release (July 27, 2022) and

focused on the performance of t he primary grind and magnetic separation unit operations. This release

provides complete results from the large-scale pilot testwork, which is now substantially complete.

17 tonnes of material were processed in the pilot test conducted at Corem. The feedstock for piloting was

a bulk sample from the starter pit area with a head grade of 0.117% DTR nickel, as compared to the resource

average of 0.129%.

Primary grind feed rates averaged 210 kg/h, with a total run time of over 80 hours. In contrast, the Phase

1 pilot plant processed 3.6 tonnes of feed material over 23 hours of run time. As previously reported, the

shorter duration of the Phase 1 pilot was insufficient to reach steady state milling conditions due to the high

density of awaruite and its influence on the recirculating load, while the Phase 3 pilot reached steady state

conditions after processing 11 tonnes of material over 54 hours. When steady state was reached, multiple

surveys were conducted at primary grind sizes ranging from 80% passing 150 to 280 microns, leading to a

robust dataset which supports the conclusions inferred from the Phase 1 pilot testing.

Phase 3a – Primary Magnetic Separation

As demonstrated in the Phase 1 piloting, awaruite’s high density (~8.6 specific gravity (“SG”)) presents an

opportunity for preferential ly grinding awaruite, versus the much less dense background of serpentine

gangue minerals (approximately 2.5-3.0 SG). As a hydrocyclone classifies minerals based both on particle

size and particle density, preferential grinding of awaruite was both expected and observed. The

preferential grinding of dense awaruite means that Baptiste can utilize a relatively coarse primary grind

(target of 80% passing 275 microns for the PFS, versus 300 microns in the 2020 PEA) while achieving the

metallurgical performance of a much finer grind, thus reducing circuit sizing, power consumption, and

operating consumables.

In addition to demonstrating the benefits of preferential grinding of awaruite, additional pilot plant runs and

ancillary bench-scale programs were completed to determine the impact of magnetic field strength on

recovery. Note that the testwork supporting the 2020 PEA u tilized relatively low intensity magnetic

separation and did not thoroughly explore the benefits of increased field strength.

The impact of preferential grinding and magnetic field strength are summarized in Figure 2. The results

clearly indicate a 0.5-1.5% increase in DTR nickel recovery due to increasing magnetic field strength from

1,200 to 1,800 Gauss . Note that 1,800 Gauss is still sufficiently low to be classified as “low intensity”

magnetic separation and as such does not require a significant change or cost increase in the magnetic

technology required for industrial equipment.

Also seen in Figure 2, the p ilot plant results clearly indicate a n additional 0.5-1.0% recovery benefit

attributed to preferential grinding, versus results achieved in bench-scale testing. In aggregate, preferential

grinding and increased magnetic field strength leads to a recovery increase of 2-3% at the coarse primary

grind size targeted for the PFS (80% passing 275 microns) . For comparison, Figure 2 also presents the

90.1% DTR nickel stage recovery assumed in the 2020 PEA. Additionally, Figure 2 also presents Phase 1

piloting results (96.9% DTR nickel recovery) which was conducted on a representative life -of-mine

composite, illustrating the potential for further recovery improvements. The in-progress variability

testwork (Phase 3b) should provide further insight into this potential recovery improvement.

Figure 2 – Impact of Grind Size, Preferential Grinding, and Magnetic Field Strength on DTR Nickel

Recovery in the Primary Circuit

Phase 3a – Regrind and Cleaner Magnetic Separation

Following the primary circuit pilot test, the regrind circuit pilot plant test was conducted. The objective of

the regrind circuit is to further liberate awaruite and subsequently clean the concentrate by magnetic

separation in order to produce a higher -grade “magnetics -rich” concentrate which can then be further

upgraded by conventional froth flotation.

Similar to the primary circuit, the regrind circuit was set -up with closed circuit grinding using a

hydrocyclone classifier, once again to take advantage of awaruite’s high density and the resultant

preferential grinding potential. While the preferential grinding phenomenon was expected, it was much

more pronounced than in the primary circuit. Despite a total run time of 46 hours and a total regrind feed

of 1.8 tonnes, steady state conditions were not achieved. At the time of shutdown, it was estimated that the

DTR nickel recirculating load was 5600% and only approximately 40% of DTR nickel was sufficiently fine

enough to have reported to cyclone overflow for magnetic separation cleaning.

For the approximately 40% of DTR nickel which was sufficiently ground to report to hydrocyclone

overflow, the DTR nickel recovery in cleaner magnetic separation exceeded 99%, in line with the 100%

stage recovery assumption in the 2020 PEA . The remaining DTR nickel recovered in the regrind circuit

clean-out was batch ground and then subjected to magnetic separation, where DTR nickel recovery also

exceeded 99%.

Phase 3a – Flotation

Having created a magnetics -rich product through two stages of grinding and magnetic separation, the

objective of froth flotation is to separate awaruite from magnetite. The cleaner magnetic separation

concentrate produced from the regrind mill clean-out material was subjected to bench- and pilot-scale batch

flotation as this material contained the majority of DTR nickel (60% of the regrind circuit feed). This

material performed exceptionally well in flotation, with a 94% recovery to a final concentrate grading more

than 65% nickel. This is inline with previous bench -scale flotation testwork results and the PEA’s

assumption of 94% flotation stage recovery to a 63% nickel concentrate.

Flotation concentrate from the Corem work is now the feedstock for the current hydrometallurgical testing

program, the results of which will be released in the second quarter of 2023.

Update on Phase 2 Flotation Testwork

As indicated in the Company’s July 27, 2022 news release, key flotation testwork results achieved during

Phase 2 included confirmation of the ability to consistently produce very high-grade flotation concentrates

and the potential for an alternative (lower-acid) flotation regime which could achieve similar metallurgical

performance while reducing flotation operating costs and complexity. The Phase 2 news release indicated

flotation testwork remained in progress, and an update on the results is presented herein.

Further optimization of the baseline flotation conditions resulted in a slight improvement in locked cycle

testing, with flotation stage nickel recovery increasing from 87% to 88%. As indicated in the Company’s

July 27, 2022 news release, while recovery values are less than the PEA flotation stage recovery criteria of

94%, the current flotation results were impacted by the lower feed grade owing to the hold-up of nickel in

the pilot plant grinding circuit. As comparable flotation tailings grades were observed across the current

and historic flotation programs, and testwork continues to indicate that coarse, liberated awaruite is readily

recoverable in flotation, the Company continues to anticipate recovery estimates would increase if the

flotation feed material was more representative.

Additionally, locked cycle testwork on the alternative, lower-acid flotation regime achieved similar results

to the Company’s historical flotation conditions . This lower-acid regime has the potential to reduce acid

consumption by approximately 25%. Fundam entally, testwork has now clearly identified two viable

flotation regimes which can achieve similar and excellent metallurgical performance, thereby validating

conventional froth flotation as a tool to produce very high-grade awaruite concentrates.

New Processing Option to Increase Nickel Recovery

In addition to the ongoing flotation testwork, the Company is conducting a test program to demonstrate the

potential to further improve nickel recovery through treating flotation tailings via leaching. The objective

of this processing concept is to access any nickel contained in low-grade awaruite containing particles that

would dilute the final concentrate grade or ultra-fine awaruite particles that may not respond as effectively

to conventional froth flotation.

Testwork to-date demonstrates that 65% of the nickel contained in flotation tailings can be readily leached

using dilute sulphuric acid under ambient temperature and pressure conditions. The balance of unrecovered

nickel (35%) is almost entirely composed of nickel contained within magnetite, either as locked particles

or in solid solution. This indicates that the leaching process is extremely efficient for liberated or exposed

awaruite particles. Nickel was selectively leached away from magnetite with minimal co-leaching of iron

(around 2-3%) and very low free acidities in the leach liquor, which indicates the potential for low reagent

consumptions. The majority of nickel in such a leach solution could readily be recovered as a mixed

hydroxide precipitate (“MHP”) using simple and conventional unit operations . This would be a new

product stream, in addition to the high-grade awaruite concentrate which would still constitute the vast

majority (95% or greater) of nickel output.

Flotation tailings nickel leaching represents a significant new opportunity to improve overall nickel

recovery to match or exceed the 85% recovery assumed in the 2020 PEA. Based on results to date, it is

estimated that DTR nickel recovery could be increased by 3-5% overall (from 82% to a minimum of 85%).

Qualified Person

The metallurgical information in this news release has been prepared in accordance with Canadian

regulatory requirements set out in National Instrument 43 -101 Standards of Disclosures for Minerals

Projects of the Canadian Securities Administrators (“NI 43 -101”) and supervised, reviewed, and ve rified

by Jeffrey B. Austin, P.Eng., President of International Metallurgical and Environmental Inc., a “Qualified

Person” as defined by NI 43-101 and the person who oversees metallurgical developments for FPX Nickel.

About the Decar Nickel District

The Company’s Decar Nickel District claims cover 245 km 2 of the Mount Sidney Williams

ultramafic/ophiolite complex, 90 km northwest of Fort St. James in central British Columbia. The District

is a two-hour drive from Fort St. James on a high-speed logging road.

Decar hosts a greenfield discovery of nickel mineralization in the form of a naturally occurring nickel-iron

alloy called awaruite (Ni 3Fe), which is amenable to bulk -tonnage, open -pit mining . Awaruite

mineralization has been identified in four target areas within this ophiolite complex, being the Baptiste

Deposit, and the B, Sid and Van targets, as confirmed by drilling, petrographic examination, electron probe

analyses and outcrop sampling on all four targets . Since 2010, ap proximately US $28 million has been

spent on the exploration and development of Decar.

Of the four targets in the Decar Nickel District, the Baptiste Deposit, which was initially the most accessible

and had the biggest known surface footprint, has been the focus of diamond drilling since 2010, with a total

of 99 holes and 33,700 m of drilling completed. The Sid target was tested with two holes in 2010 and the

B target had a single hole drilled in 2011; all three holes intersected nickel -iron alloy mineralization over

wide intervals with DTR nickel grades comparable to the Baptiste Deposit. In 2021, the Company executed

a maiden drilling program at Van, which has returned promising results comparable with the strongest

results at Baptiste. In 2022, the Company executed a step-out drilling program at Van which demonstrated

a significant expansion of the 2021-identified mineralized zone.

About FPX Nickel Corp.

FPX Nickel Corp. is focused on the exploration and development of the Decar Nickel District, located in

central British Columbia, and other occurrences of the same unique style of naturally occurring nickel-iron

alloy mineralization known as awaruite . For more information, please view the Company’s website at