Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FPX.V ·

First Point Minerals Announces $830,000 Financing to Fund Step-Out Drilling Program at Decar Nickel Project

Financings

Suite 725 – 1155 West Pender Street

Vancouver, BC Canada V6E 2P4

Tel: 604.681.8600

e-mail: [email protected]

May 15, 2017

First Point Minerals Announces $830,000 Financing to Fund

Step-Out Drilling Program at Decar Nickel Project

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES

OR FOR DISSEMINATION IN THE UNITED STATES

Vancouver, May 15, 2017 – First Point Minerals Corp. (FPX-TSX.V) (“First Point” or the

“Company”) is pleased to announce that it has arranged a non-brokered private placement to

raise gross proceeds of up to $830,000 (the “Offering”). The Offering will consist of up to

8,300,000 common shares (the “Shares”) at $0.10 per Share in the capital stock of the Company.

The proceeds raised from the Offering will be used by First Point for a minimum 2,000-metre

step-out drilling program to test the southeast extension of the Baptiste deposit at the Company’s

flagship Decar nickel project, and for general working capital purposes. The timing and scope of

the proposed drilling program is subject to receipt of necessary permits.

“We are very excited to re-commence drilling activities at the Decar project, which has not seen

drilling since 2012,” said Martin Turenne, President and CEO. “The focus of this year’s

campaign will be to test the potential to add higher-grade resources immediately to the southeast

of the existing Baptiste deposit, where adjacent holes drilled during the final phase of the 2012

campaign returned the highest-grading drill intercepts on the property.”

As highlighted in the National Instrument 43-101 compliant resource estimate produced by

Caracle Creek International Consulting in February 2013 (see First Point news release dated

February 6, 2013), and as supported by First Point’s own interpretation of drilling results to date,

the southeast extension of the Baptiste deposit is a highly prospective target to establish

continuity of near-surface higher-grade mineralization with the existing deposit.

The Baptiste deposit currently contains 1.159 billion tonnes of indicated resources at an average

grade of 0.124% Davis Tube magnetically-recovered (“DTR”) nickel, for 1.4 million tonnes of

DTR nickel, and 870 million tonnes of inferred resources with an average grade of 0.125% DTR

nickel, for 1.1 million tonnes of DTR nickel, reported at a cut-off grade of 0.06%. Mineral

resources are not mineral reserves and do not have demonstrated economic viability.

The image below provides an overview of drill collar locations for all holes previously drilled at

Baptiste, with the potentially higher grade extension area highlighted to the southeast, and

delineating the nickel-iron alloy boundary of those holes with intercepts grading over 0.1% DTR

nickel.

The table below shows the average grade for 2012 holes clustered in the southeast portion of the

current Baptiste deposit.

Hole

Intersections DTR

Nickel

(%)

Comments From To Length

36 31.1 600.1 563 0.156 Excludes 5.7 m dyke

37 64 600 494.9 0.147 Excludes 8.2 m and 33m dyke sequence

39 38.2 594.1 552.7 0.153 Excludes 3.1 m dyke

40 33 588 549.9 0.153 Excludes 5.1 m dyke

42 154 234 80 0.120 Abandoned at 301 m, rods stuck

43 33.2 600 508.1 0.151 Excludes 22m, 9m, 14.2 m, 3.2m & 9.9 m dykes and minor wall rock

44 240 579 319.9 0.153 Excludes 3.4 m and 15.7m dykes and minor wall rock

46 28.6 600.1 487.4 0.150 Excludes 20m, 8m, 14m, 12m & 11m dykes and < 0.1% DTR Ni intervals

50 34.5 229 194.5 0.147

52 283 600.1 317.1 0.156

55 106 569.7 456.2 0.158 Excludes 7.4 m dyke

58 484 600.1 116.1 0.163

Insiders of the Company intend to participate in the Offering and a finder’s fee may be payable

on a portion of the Offering.

All the securities issued pursuant to this private placement will be subject to a four (4) month

hold period. Completion of the Offering is subject to receipt of all required regulatory and other

approvals, including acceptance by the TSX Venture Exchange.

Davis Tube magnetically-recovered (“DTR”) nickel is the nickel content recovered by magnetic

separation using a Davis Tube, followed by standard assaying procedures to determine the nickel

assay of the concentrate; in effect a mini-scale metallurgical test. The Davis Tube method is used

to provide a more accurate measure of variability in recoverable nickel. The Davis Tube method

is the global, industry standard geometallurgical test for magnetic recovery operations and

exploration projects.

Dr. Peter Bradshaw, P. Eng., First Point’s Qualified Person under NI 43-101, has reviewed and

approved the technical content of this news release.

About First Point

First Point Minerals Corp. is focused on the exploration and development of the Decar Nickel-

Iron Alloy Project, located in central British Columbia, and other occurrences of the same unique

style of naturally occurring nickel-iron alloy mineralization known as awaruite. For more

information, please view the Company’s website at www.firstpointminerals.com or contact

Martin Turenne, President and CEO, at (604) 681-8600.

On behalf of First Point Minerals Corp.

"Martin Turenne"

Martin Turenne, President and CEO

Forward-Looking Statements

Certain of the statements made and information contained herein is considered “forward -

looking information” within the meaning of applicable Canadian securities laws. These

statements address future events and conditions and so involve inherent risks and uncertainties,

as disclosed in the Company's periodic filings with Canadian securities regulators. Actual

results could differ from those currently projected. The Company does not assume the obligation

to update any forward-looking statement.

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility

for the adequacy or accuracy of this release.