Falco Files Feasibility Study Technical Report FOR Horne 5 Project
For Immediate Release TSX.V - FPC
FALCO FILES FEASIBILITY STUDY
TECHNICAL REPORT FOR HORNE 5 PROJECT
(Montreal, Québec, October 30th, 2017) – Falco Resources Ltd. (FPC: TSX-V) (“Falco” or the “Company”)
is pleased to announce that it has filed today on SEDAR a Nati onal Instrument 43 -101 technical report
for its wholly -owned Horne 5 gold project located in Rouyn -Noranda, Québec. Falco’s news release
dated October 16th, 2017 summarizes the assumptions and key results contained in the technical report.
There are no material differences between the assumptions and estimates contained in Falco's news
release dated October 16 th, 201 7 pertaining to this property, from those contai ned in the technical
report filed today.
About Falco
Falco Resources Ltd. is one of the largest mineral claim holders in the Province of Québec, with
extensive land holdings in the Abitibi Greenstone Belt. Falco owns about 67,000 hectares of land in the
Rouyn-Noranda mining camp, which represents approximately 70% of the entire camp and includes 13
former gold and base metal mine sites. Falco's principal asset is the Horne 5 Project located in the
former Horne mine that was operated by Noranda from 1927 to 1976 and produced 11.6 million ounces
of gold and 2.5 billion pounds of copper. Osisko Gold Royalties Ltd is the largest shareholder of the
Company and currently owns 13.3% of the outstanding shares of the Company.
For further information contact:
Vincent Metcalfe
Chief Financial Officer
514-905-3162
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.