66 metres of 0.35% copper a t Rateria property , Highland Valley, B.C. February 8 , 201 8 –
Happy Creek
’s
drill hole
R17
-
08 returns
82.5
metres of 0.
29
% copper
and
66 metres of
0.35% copper
a
t
Rateria property
,
Highland Valley, B.C.
February
8
,
201
8
–
Vancouver, British Columbia.
Happy Creek Minerals Ltd. (TSXV:
HPY)
(the “Company
”
)
is
announc
ing
final
results from
drill
in
g
performed in 2017
at
its
100% owned
Rateria copper
property in the Highland Valley
district
,
B.C., Canada.
The
H
ighland Valley district has
been
in continuous production since 1963
with
four porphyry
copper deposits
.
The Company
is
e
xploring
approximately 200 square kilom
etres of mineral tenure that
adjoin and surround the southern end of
Teck Resources’
Highland Valley
Copper
property
,
Canada’s largest base metal mine
.
In 2017,
Happy Creek
completed
2,682.7
metres in
ten
holes
with nine performed
in and
around the Zone 2
deposit that is located approximately 6.5 km southeast of Teck’s
currently producing Highmont open pit
.
Results for drill holes R17
-
01 to R17
-
06 were
announced August 29
th
,
2017
and new r
esults
are for
four hol
es R17
-
07 to R17
-
10
completed in November 2017
.
Maps
can
be found in an updated presentation on the
Company’s website.
Highlights
of Phase 2 drilling
Drill hole R17
-
07 is located on the west side of Zone 2 and returned among the highest
rhenium values
obtained
to date including one metre of 16.8 g/t rhenium with 0.138%
molybdenum and 18.9 metres of 1.94 g/t rhenium with 0.016% molybdenum and 0.12%
copper. Near the end of the hole at 279.5 metres, 17.5 metres contains 0.14% copper
that remains open
.
Rhen
ium
occurs within molybdenite and
i
s a byproduct of some
porphyry copper
-
molybdenum
deposits.
It is a rare metal used
mainly in nickel
-
based
superalloys used to produce high performance gas turbines (78% of demand) with the
current mid
-
market spot price of
US$2,030/Kg, while in September, 2008, the price
peaked at US$10,500/Kg. The market outlook for rhenium
is positive with
total demand
forecast to grow at 6% through to 2020.
Drill hole R17
-
08 is located
6
0 metres east of R17
-
07 and
s
tarting at 55 metres, returned
208.5
metres of 0.
24
% copper
to the end of the hole at 263.5 metres. This
interval
includes
82.5
metres of 0.
29
% copper
and 66 metres of 0.35% copper
.
The drill hole
ended in 2.5 metres of 0.14% copper
.
David Blann, Presiden
t and C.E.O. of Happy Creek states: “
D
rilling
at Zone 2
has
expanded
the
overall
size of the mineral system
, improved understanding of the structural
controls
and
confirmed
copper
values o
ccur
from surface
to
greater
than
3
0
0 metres
below surface
.
Zone 2
is
a new, from
-
scratch
discovery
in the Highland Valley
and
demonstrates new deposits can be found
in under
-
explored areas. Many
of
the
drill holes
end in encouraging alteration
and
mineralization
that
could be an indication of a much
larger scale mineral
system at depth
.
With more than 25 copper prospects and 200 square
kilometres of mineral tenure assemble
d, this is an excellent opportunity to apply modern
exploration techniques and ideas in one of the most productive porphyry districts
and
a
solid
geopolitical jurisdiction.
”
Details
of Phase 2 drilling
Drill holes R17
-
07 and R17
-
08 are located 150 metres to the north of
previously
announced
R17
-
05 (105.5 metres of 0.37% copper, 0.14 g/t gold)
. Drill hole R17
-
07 is
located
approximately
6
5
metres w
est of Zone 2 and drilled towards the east at
-
65
degrees.
In this previously untested portion of the western side of the deposit, t
he hole
encountered 199.65 metres of material averaging 0.06% copper
along with several
intervals containing particularly rh
enium
-
enriched molybdenite
.
Drill hole R17
-
08 is located 60 metres east of R17
-
07 and
drilled to the east at
-
65 degrees
and
starting at 55 metres,
intersected 208.5 metres of 0.24% copper
including
54 metres
of 0.36% copper and 66 metres of 0.35% copper
and ended in mineralization
grading
0.14% copper
at 263.5 metres. The two higher grade zones
intersected are consistent
with
several
other holes drilled from the west to east and suggest
that
previous holes
directed from the east to west may have intersect
ed
only
one of the mineralized
structures.
The drill hole ended in material grading 0.14% copper and the mineralization
remains open.
Drill holes R17
-
09 and R17
-
10
are
located approximately
700 metres to
the southeast of
R17
-
07/08
.
Drill
hole R17
-
09 w
a
s directed to the northeast
to a depth of 99 metres
and
intersected widely spaced fracture
-
controlled alteration and
discrete mineralized zones
and
one of the
m
return
ed
2.3 metres of 0.74% copper,
3.3 g/t silver
.
R17
-
10 was directed
to the west and intersected similarly wide
-
spaced structurally controlled zones
containing
weak to
locally
moderate
chlorite
-
epidote
and mild sericite
alteration with no significant
copper values.
Based on results
from
R17
-
09 and R17
-
10
and historical drilling performed
to the
east and south of these holes, Zone 2 is interpreted to
continue southeast while
splitting
into multiple mineralized structures in this area.
Zone 2 occurs in proximity to the contact between
Bethlehem and Chataw
ay
intrusive
phases of
the Guichon Batholith
including
feldspar porphyry
and aplite
dikes
. The
principle
mineralized
structure
s
in Zone 2 trend north
-
northwest and
are
sub
-
vertical in
orientation
with
important
secondary
well
-
mineralized
veins
and fractures
that are
cross
-
cutting and
moderate to gently dipping.
West
to
northwest and northeast trending faults
and fractures also occur that are interpreted to
be syn to post
-
mineral.
At the north end
of Zone 2, the mineralized zone expands
outward
t
o the east several hundred metres
where
d
r
ill hole R17
-
02
returned
5.0 metres of 4.41% copper that is open
.
The mineralogy
in Zone 2 is dominantly bornite with lessor amounts of chalcocite, chalcopyrite
and
molybdenite
and
has excellent metallurgical recov
ery
, with
preliminary work produc
ing
a
rougher
-
cleaner concentrate
containing
36.2% copper, 7.49 g/t gold, 189 g/t silver (news
February 19, 2015)
.
Relative to other published resources in Highland Valley, t
here is a
distinct gold enrichment
in zone 2
seen
in
a number of
holes including
R17
-
05
with
a 46.0
metre interval
of
0.64% copper and 0.30 g/t gold.
Drilling to date
in Zone 2
has
defined
a continuous mineralized
northwest trending zone
approximately
800 metres in length,
75
-
1
50
metres in width and
extends from surface to
over 300 metres in depth
. This
portion of
mineralization
is
within a larger zone
over one
km in length
and up to 500 metres in width
that is
open to expand in several directions.
Highlights
of 2017
Drill Results
from Zone 2
Hole
From
To
Interval
Cu
Au
Ag
Mo
Re
(metres)
(metres)
(metres)
%
g/t
g/t
%
g/t
R17
-
02
221.5
226.5
5.0
4.41
0.21
20.0
0.03
1
6.86
R17
-
05
109.0
146.5
37.5
0.22
0.03
1.3
0.002
0.06
and
209.0
314.5
105.5
0.37
0.14
1.9
0.005
0.63
R17
-
06
250.5
255.5
5.0
0.57
0.06
2.5
0.001
0.23
and
3
58.0
378.0
20.0
0.
24
0.
10
1.3
0.002
0.14
R17
-
08
55.0
263.5
208.5
0.24
0.03
1.1
0.002
0.16
Includes:
55.0
137.5
82.5
0.
29
0.0
5
1.
2
0.00
3
0.17
and
170.0
236.0
66.0
0.35
0.02
1.6
0.002
0.23
The Rateria
-
West Valley properties
contain
the Zone 1 and Zone 2 deposits
with drill
results
returning
copper
grades
similar to
other
known deposits
in the district
.
The two
deposits are at or near
the
resource
-
ready stage.
Happy Creek
has
assemble
d
a
100%
interest in
200 square kilometre
s
of mineral tenure
within
the
prospective geology of the
Highland Valley camp
that
contains
over 25 underexplored copper prospects
.
The
Company
has
initiat
e
d
an intensive compilation of historical
property
-
wide
information
,
including
detailed studies of
Zon
e 1 and 2
to determine
the next steps
for this promising
project
.
The Company
believes the property is a
q
uality copper exploration asset
in a
geological setting
where four porphyry
copper
deposits
to the north and
one
copper
skarn
to the south
have
achieved commercial production
.
On behalf of the Board of Directors,
“David E Blann”
____________________
David E Blann, P.Eng.
President, CEO
FOR FURTHER INFORMATION PLEASE CONTACT:
David Blann, President, CEO
Corporate Office:
Phone: 604.662.8310
Email:
Website:
www.happycreekminerals.com
Corporate Communications
Ron Birch: Phone: 250.545.
0383
Toll Free: 1.800.910.
7711
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
news release.
Da
vid Blann,
P.Eng. is a Qualified Person
as defined by National Instrument 43
-
101 and is responsible for the preparation and
approval of the technical information disclosed in the news release.
Readers are cautioned that results or information
from an adjoining property do not infer that similar
results or outcomes will occur on the subject property.
1)
https://www.assetmacro.com/global/commodity/rhenium
-
price/
.
Analyses are performed by
SGS
Laboratories in
Burnaby, B.C. using a geochemical aqua regia digest
of a 2
.
0
gram
pulp and ICP
-
MS finish,
and results for copper, silver, molybdenum and rhenium are provided in ppm (parts per
million
(ppm)
or grams per tonne
,
and gold in
parts per billion (ppb)
), with
ppm
values converted to percent by
dividing by 10,000
, and ppb values converted to g/t by div
iding by 1,000.
Overlimit s
ample
s greater th
an 5,000 ppm
copper
are
re
-
run
utilizing ICP
-
AES providing values in percent (%) copper
, and
over 500 ppb gold are re
-
done using
30 gram Fire Assay with ICP
-
MS finish
. In addition, the
Company re
-
run
a 181 metre
interval in drill hole F17
-
08
using copper assay and fire assay methods
.
A review and comparison of both methods for copper and gold
-
silver
analyses indicate
that within the laboratory’s stated
analytical
limits,
ICP
-
MS is a
reliable method to quantify
co
pper
and gold on this project.
Other q
uality control protocol
s
include
insertion of either a blank,
reference
standard or
core
d
uplicate for every 10th sample submitted
in addition to the laboratory
pulp and reject duplicates
conducted
during
internal con
trols.
SGS Minerals Services Geochemistry Vancouver conforms to the requirements of ISO/IEC17025 for
specific tests as listed on their scope of accreditation which can be found at
http://www.scc.ca/search/palcan/sgs
.