Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FOXT.V ·

6.3m of 0.43% W03 at Nightcrawler zone, Fox tungsten property

Drill Results

Happy Creek

drill

s

6.3m of 0.43% W03 at Nightcrawler zone,

Fox

tungsten

property

November

4

,2019

–

Vancouver, British Columbia. Happy Creek Minerals Ltd. (TSXV: HPY) (the

“Company

”

)

,

is pleased to

provid

e

an update

on its

100% owned

F

ox tungsten

project in south

central

B.C., Canada

.

In 2019, t

wo drill holes

were completed

at the Fox tungsten proper

ty

totalling 372.5m

in

the

Nightcrawler zone within

logging clear

-

cuts and roads.

Since 2017, t

he Company

has

done

more

detailed

work in

this area and recognized a potential resource opportunity based on several

widely

spaced

holes containing encouraging grade

-

widths

.

The two holes

returned 4m of 0.29% W03 in

F19

-

01

and 6.3m of

0.43% W03

in F19

-

02

.

Summary of 2019 Drill Results Nightcrawler Zone

Drill

From

To

Interval

W03

Hole

m

m

m

%

F19

-

01

186

.0

190

.0

4.0

0.29

F19

-

02

71.5

77.8

6.3

0.43

Incl

74

.0

77.8

3.8

0.59

At the Nightcrawler zone, there are

multiple tungsten

-

bearing calc silicate layers that extend for

three km along strike and at least 500 metres down dip. Fiv

e

drill

holes have

now

cut

a

tungsten

calc silicate

/

skarn layer in an area approximately 500 metres by 250 metres

in dimension

with an

average

thickness of approximately

5 metres

and

similar

grade

to F19

-

02

. This zone

dips

around

30 degrees

south

-

southeast,

remains open and is thought

to daylight at surface on the north side

of Deception Creek

.

David Blann, President of Happy Creek states “

Drilling at the Nightcrawler zone was designed

to

test

with two holes

the continuity and grade

of a

tungsten

-

bearing calc

-

silicate layer

.

The two

h

oles are over 400 metres apart and

each

contain

s

a

significant

intercept

.

T

his mineralized calc

silicate layer

is thought to have

sizeable resource potential

with

grades

comparable to other

underground tungsten development projects globally

.

We will conduc

t further

drill

-

testing

of the

Nightcrawler in the spring when we resume work at higher elevations.

”

Further to the press release dated September 30

th

, 2019 poor weather and early snow conditions

were not considered safe or cost

-

effective for starting a he

licopter

-

supported drill program

at

higher elevations

which

was planned

to test for extensions

of the

high

-

grade resources at the

Ridley Creek and BN tungsten deposits

.

About the Fox tungsten property

The Fox tungsten property is located 75 km northeast of 100 Mile House in south Central B.C.

The Company has advanced the

project

from an early stage

to discovery

and a

s announced

February 27, 2018,

it

currently

hosts a resource of 582,400 tonnes of 0.826%

WO

3

(indicated)

and 565,400 tonnes of 1.231% WO

3

(Inferred), that is among the highest grade in the western

world

,

and

a portion

is

within an open pit

shell

.

The Fox has a mineral system

with dimensions of

12km by 5 km

and

n

u

merous

surface

showings

of tun

gsten and drill holes with intervals

above

cut

-

off grade

that are

open.

More detail on the Fox tungsten

propert

y

can be found on the Company’s website at

www.happycreekminerals.com

.

On behalf of the

Board of Directors,

“David E Blann”

_________________

_______

David E Blann, P.Eng.

President, CEO

FOR FURTHER

INFORMATION,

PLEASE CONTACT:

David Blann, President, CEO

.

Office:

Phone: 604.662.8310

Email:

[email protected]

Website:

www.happycreekminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adeq

uacy or accuracy of this release.

David Blann, P.Eng.

, Director,

is a Qualified Person as defined by National Instrument 43

-

101 and is responsible for

the preparation and approval of the technical information disclosed in the news release.

S

amples are

derived from ½ core cut by rock saw and shipped to, prepared and analyzed at SGS Laboratories in

Burnaby, British Columbia.

SGS Burnaby is

ISO 9001:2008

certified.

Drill core samples

of all calc silicate

are

digested and analyzed by aqua regia and

analyzed

by

multi

-

element

ICP

-

MS

and XRF assay for

tungsten

(W)

. W is

multiplied by 1.261 to obtain WO3 (tungsten trioxide) the compound for which tungsten prices are quoted. The

Company routinely inserts blanks, certified standards and duplicate samples within th

e submitted drill core batches

submitted for assay as part of its quality control procedures.

This press release contains "forward

-

looking information" within the meaning of applicable securities laws, including

statements that address capital costs, rec

overy, grade, and timing of work or plans at the Company’s mineral projects.

Forward

-

looking information may be, but not always, identified by the use of words such as "seek", "anticipate", "plan",

"planned", "continue", "expect", “thought to”, "project",

"predict", "potential", "targeting", "intends", "believe",

“opportunity”, “further” and others, or which describes a goal or action, event or result such as "may", "should", "could",

"would", "might" or "will" be undertaken, occur or achieved. Statements a

lso include those that address future mineral

production, reserve potential, potential size or scale of a mineralized zone, potential expansion of mineralization,

potential type(s) of mining, potential grades as well as to Happy creek’s ability to fund ong

oing expenditure, or

assumptions about future metal or mineral prices, currency exchange rates, metallurgical recoveries and grades,

favourable

operating conditions, access, political stability, obtaining or renewal of existing or required mineral titles,

licenses and permits, labour stability, market conditions, availability of equipment, accuracy of any mineral resources,

anticipated costs and expenditures. Assumptions may be based on factors and events that are not within the control of

Happy creek and t

here is no assurance they will prove to be correct. Such forward

-

looking information involves known

and unknown risks, which may cause the actual results to materially differ, and/or any future results expressed or

implied by such forward

-

looking informati

on. Additional information on risks and uncertainties can be found within

Financial Statements, Prospectus and other materials found on the Company’s SEDAR profile at

www.sedar.com

.

Although Happy creek has attempted to

identify important factors that could cause actual actions, events or results to

differ materially from those described in forward

-

looking information, there can be no assurance that such information

will prove to be accurate as actual results and future

events could differ materially from those anticipated in such

statements. Happy creek withholds any obligation to update or revise any forward

-

looking information, whether as a

result of new information, future events or otherwise, unless required by law.