Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FOR.V ·

Fortune BAY Announces Goldfields WEST Uranium Project, Northern Saskatchewan

Corporate Updates

TSXV: FOR

fortunebaycorp.com

NEWS RELEASE

1969 Upper Water Street, Suite 2001, Purdy’s Wharf Tower II, Halifax, NS B3J 3R7 T 902.422.1421 | F 902.491.4281

1

FORTUNE BAY ANNOUNCES GOLDFIELDS WEST URANIUM PROJECT,

NORTHERN SASKATCHEWAN

HALIFAX, NS September 28, 2021 – Fortune Bay Corp. (TSXV:FOR, Frankfurt:5QN) (“Fortune Bay” or

the “Company”) is pleased to announce identification of the Goldfields West Uranium Project (“Goldfields

West” or the “Project”).

The Project comprises the western claims of the Company’s flagship Goldfields Project in northern

Saskatchewan, which have been identified to have potential for high-grade unconformity-related,

basement-hosted uranium deposits typical of the Athabasca Basin margin (Figure 1).

Combined with the recently announced Strike Uranium Project (see News Release dated September 16,

2021), the Project gives Fortune Bay a dominant land position of the electromagnetic (“EM”) conductors in

Canada’s original uranium mining district (Figure 2).

The Company plans to commence target area selection over the coming weeks in preparation for planned

field activities in 2022, with the aim of generating targets for drill testing.

Dale Verran, CEO for Fortune Bay, commented, “ We are pleased to announce a second uranium project

in proximity to the Company’s active flagship gold assets and operational hub in Uranium City. The Project

provides Fortune Bay and its shareholders with additional discovery potential amidst a strengthening

uranium market. Goldfields West includes an extensive package of favorable host rocks which have not

seen any significant uranium exploration since the 1980’s due to a focus on gold exploration . Historical

work, which includes some noteworthy drill intersections, indicates the Project has the hallmarks o f a

prospective uranium corridor and warrants the application of modern exploration models and methods to

target high-grade unconformity-related, basement-hosted uranium deposits.”

Exploration Potential

Abundance of Uranium Occurrences

• The uranium endowment of the Project is well established through historical work until the 1980’s

which identified numerous high -grade (> 1% U 3O8) uranium occurrences primarily through

prospecting and trenching. Nearby significant past uranium producers include the Lorado, Gunnar

and Beaverlodge (Eldorado) mines.

• Approximately 150 historical drill holes, completed between 1947 and 1987, are documented

across the Project which were largely focused around the known uranium occurrences , and

included shallow, high-grade drill intersections.

• Highlights of historical uranium occurrences for Goldfields West are summarized in Table 1.

Favorable Host Rocks (Figure 3)

• Historical airborne and ground EM surveys , from the 1950’s until as recently as 2007, identified a

package of EM conductors covering a strike length of approximately 12 kilometres. These

conductors, where evaluated, have been confirmed to represent graphite-bearing

2

metasediments, which are known to provide favorable (chemically-reducing) settings for the

formation of unconformity-related deposits.

• Geological mapping by Ashton in 2009 identified abundant quartzites along the strike of the EM

conductors. Quartzites are commonly assoc iated with unconformity -related deposits, providing

competency contrasts against graphitic-rocks to create prospective dilational settings.

• The Athabasca Basin margin is located approximately five kilometres to the south of the Project,

indicating vertical proximity to the basal unconformity (now eroded) and good preservation

potential for basement -hosted mineralization . Uranium mineralization has been document ed

along the Basin margin associated with the southwest extension of the Goldfields West conductor

package, including the Stewart, Johnston and Sampson Island showings.

Table 1: Goldfields West Historical Uranium Occurrence Highlights.

SMDI

# Name Drill Hole U3O8 %

Grab Sample

U3O8 or

eU3O8* %

Comments

1233

YK Claims U-Au

or PITCHVEIN

Prospect

1.01% / 2 m from

56 m (CKI-9)

2.19% / 0.5 m

from 68 m

(CKI-10)

Fracture- hosted mineralization hosted in

felsic paragneiss and feldspathic quartzite.

Some occurrences are coincident with EM

conductor locations.

1236

Armbruster Lake

Radioactive Zone

3 & 4

4.91*%

2.99*%

1.91*%

1.81*%

Pitchblende mineralization associated with

fracturing in a chloritic band in granite gneiss

and paragneiss.

1244

Keddy Bay B, H,

and J or Radiore

Con. No. 5

1.32% / 0.6 m

2.14% / 0.7 m

1.46% / 0.5 m

Trench results. Fracture hosted pitchblende

mineralization in granite underlain by

quartzite.

1246 Eldorado S-7, S-

8, and S-9

0.97% / 1.1 m

from 5.6 m (G-16) 37.5% / 25 lb Fracture-hosted mineralization within

amphibolite, mapped strike length of 396 m.

2083 PB-9, PB-11, PB-

12, PJ-19 10.3%

5.2%

Fracture-hosted pitchblende mineralization

with yellow alteration hosted in amphibolite.

2092

Crackingstone

Peninsula T-50,

FW-1, PJ-11, and

KW-5

4.82%

1.24%

Fracture-hosted mineralization within

sericite-chlorite schist and graphitic sericitic

metapelite, plunges below overburden.

2093 KH-3 and PM-4 6.38%

4.85%

Cluster of facture-hosted mineralization

occurrences in banded amphibolite.

2094

Crackingstone

Peninsula KH-11

and KH-12

3.15%

Fracture-hosted mineralization at a contact

between quartzite and sericite metapelite.

Association with gold at this location.

2097 Metalur Option

0.61%

0.49%

0.17%

Fracture-hosted mineralization in gneiss and

quartzite, coincident with EM conductors.

1247b

Eldorado S-2, S-

3, S-4, and S-5

(Gil showing)

25.3% / 25 lb

1.27%

1.35%

Fracture-hosted mineralization in amphibolite

sills.

* eU3O8 is equivalent U3O8 derived from a gamma-ray spectrometer.

Work Completed by Fortune Bay

During 2015 Mercator Geological Services Limited carried out an exploration program on the Company’s

behalf which included a structural/geophysical lineament study , rock geochemical sampling program,

scintillometer surveying and geological investigations. The objective of the program was to verify, identify

and prioritize targets across the 10,000 hect are Goldfields property. While gold was the primary focus , a

3

number of uranium targets were also identified, including six Tier 1 targets at the intersection of the

Goldfields West conductor package with cross-faults.

Scintillometer surveying along the northern portion of the Goldfields West conductor package confirmed

elevated radioactivity within bedrock, including readings of up to 1,030 counts per second (“cps”). At the Gil

showing, survey locations 200 m etres apart registered between 59,000 and 51,633 cps within a possibly

continuous zone of recessive rock that measures about 1 metre in thickness. Grab sampling of this showing

by the Company in June 2021 produced assays of 6.04% U3O8 and 0.95% U3O8.

Next Steps

The Project warrants a modern, systematic app roach to evaluat e the 12 kilometre conductor package.

Historical data suggests the southern portion of the conductor package is significantly underexplored.

Next steps are planned to include:

1. Target Area Selection: Existing historical datasets, regional government and industry airborne

surveys, and satellite imagery provide valuable data to commence selection and prioritization of

target areas, which would include the identification of favorable lithological and structural settings.

The six Tier 1 targets identified by Mercator would be assessed during this stage.

2. Field Investigation: Field investigation and the verification of historical datasets is planned within

prioritized target areas. Work is planned to include ground-truthing of uranium occurrences and drill

holes, geological mapping, scintillometer surveying and grab sampling.

3. Drill Target Definition: Drill targets are expected to be refined/defined through follow-up ground

geophysical surveying including gravity and magnetics and/or additional EM surveys, as applicable.

Geochemical surveys may be warranted based on assessments of suitable sample media.

The Company plans to commence target area selection over the coming weeks with the objective of

commencing field activities in 2022.

Sampling, Analysis and Data Verification

Uranium assays for the Gil showing were undertaken by the Saskatchewan Research Council (“ SRC”)

Geoanalytical Laboratories. Sample preparation include d drying, jaw crushing to 60% passing -2

millimetres, and pulverizing to 90% passing -106 microns. The resultant pulp was digested using a two -

acid partial digest (HNO 3:HCl) and the respective solution analyzed for multi ple elements, including

uranium, using ICP-OES. Boron values are obtained through NaO 2/NaCO3 fusion followed by ICP -OES.

Uranium assays are obtained using SRC’s ISO/IEC 17025:2005 accredited method for the determination

of U3O8 wt%. A split of the sample pulp is digested using aqua-regia (HCl:HNO3 in the ratio 3:1), and the

solution analyzed for U3O8 wt% using ICP-OES.

Unless otherwise stated , the historical results (including drill results) contained within this news release

have not been verified and there is a risk that any future confirmation work and exploration may produce

results that substantially differ from the historical results. The Company considers these results relevant to

assess the mineralization and economic potential of the property.

The 2015 exploration program was conducted by Mercator Geological Services Limited and is summarized

in the current National Instrument 43-101 (“NI 43-101”) Technical Report titled "Technical Report: Resource

Estimate for the Goldfields Project" with an effective date of May 4, 2021 (available on SEDAR and the

Company’s website).

Qualified Person

The technical and scientific information in this news release has been reviewed and approved by Dale

Verran, M.Sc., P.Geo., Chief Executive Officer of the Company, who is a Qualified Person as defined by

4

NI 43-101. Mr. Verran is an employee of Fortune Bay and is not independent of the Company under NI 43-

101.

About Fortune Bay

Fortune Bay Corp. (TSXV:FOR, Frankfurt: 5QN) is a gold-focused exploration and development company

with 100% ownership in two advanced gold exploration projects in Canada, Saskatchewan (Goldfields

Project) and Mexico, Chiapas (Ixhuatán Project) , both with exploration and development potential. The

Company has also acquired the Strike Uranium Project, located near the Goldfields Project. The Company

has a goal of building a mid -tier exploration and development Company through the advancement of its

existing projects and the strategic acquisition of new projects to create a pipeline of growth opportunities.

The Company’s corporate strategy is driven by a Board and Management team with a proven track record

of discovery, project development and value creation. Further information on Fortune Bay and its assets

can be found on the Company’s website at www.fortunebaycorp.com or by contacting us as

[email protected] or by telephone at 902-334-1919.

On behalf of Fortune Bay Corp.

”Dale Verran”

Chief Executive Officer

902-334-1919

Cautionary Statement Regarding Forward-Looking Information

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the date of this

news release . These statements reflect management's current estimates, beliefs, intentions, and expectations. They are not

guarantees of future performance. Fortune Bay Corp. (“Fortune Bay” or the “Company”) cautions that all forward-looking statements

are inherently uncertain, and that actual performance may be affected by a number of material factors, many of which are beyond

Fortune Bay's control. Such factors include, among other things: risks and uncertainties relating to metal prices, changes in planned

work resulting from weather, COVID-19 restrictions, logistical, technical or other factors, the possibility that results of work will not

fulfill expectations and realize the perceived potential of Fortune Bay's mineral properties, uncertainties involved in the interpretation

of drilling results and other tests, the possibility that required permits may not be obtained in a timely manner or at all, risk of accidents,

equipment breakdowns or other unanticipated difficulties or interruptions, the possibility of cost overruns or unanticipated expenses in

work programs, the risk of environmental contamination or damage resulting from the exploration operations, the need to comply with

environmental and governmental regulations and the lack of availability of necessary ca pital, which may not be available to Fortune

Bay, acceptable to it or at all. Fortune Bay is subject to the specific risks inherent in the mining business as well as general economic

and business conditions. Accordingly, actual, and future events, conditions and results may differ materially from the estimates, beliefs,

intentions, and expectations expressed or implied in the forward-looking information. Except as required under applicable securities

legislation, Fortune Bay undertakes no obligation to publicly update or revise forward-looking information. Fortune Bay does not intend,

and does not assume any obligation, to update these forward -looking statements, except as required under applicable securities

legislation. For more information on Fortune Bay, readers should refer to Fortune Bay's website at www.fortunebaycorp.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

5

Figure 1: Goldfields West Uranium Project location map.

6

Figure 2: Goldfields West and Strike Uranium Projects infrastructure and geological setting.

7

Figure 3: Goldfields West Uranium Project geology and uranium occurrences.