FIRST QUANTUM MINERALS REPORTS FIRST QUARTER 2021 RESULTS (In United States dollars, except where noted otherwise)
NEWS RELEASE
21-07
April 27, 2021
www.first-quantum.com
FIRST QUANTUM MINERALS REPORTS FIRST QUARTER 2021 RESULTS
(In United States dollars, except where noted otherwise)
TORONTO, Ontario (April 27, 2021) - First Quantum Minerals Ltd. ("First Quantum" or the "Company") (TSX:FM) today
reported for the three months ended March 31, 2021 (“Q1”) comparative earnings1 of $150 million ($0.22 per share1), net
earnings attributable to shareholders of the Company1 of $142 million ($0.21 per share 1) and cash flows from operating
activities of $743 million ($1.08 per share1).
“Our operations performed very well with Cobre Panama delivering record quarterly production. Our Zambian business
delivered in line with plan despite the heavy rains experienced in the quarter. With our continued low costs and the strong
copper price, we generated significant cash flow, which in turn, enabled us to further reduce our debt level,” commented
Philip Pascall, Chairman and CEO. “I continue to recognize and be thankful for the dedication and resilience of our entire
workforce as the challenges associated with COVID-19 persist. We remain committed to protecting our workforce, with their
health and safety and that of the surrounding communities a top priority.”
FIRST QUARTER SUMMARY:
Operational Highlights:
- Total copper production2 was 205,064 tonnes in Q1, an increase of 5% from Q1 2020 as a result of record
production at Cobre Panama and consistent production in Zambia despite heavy rainfall.
Cobre Panama had record production of 82,042 tonnes, an increase of 46% from Q1 2020.
Sentinel produced 58,252 tonnes, an increase of 3% from Q1 2020 despite repair work on the ball
mill limiting throughput and the heavier rainfall in Zambia.
- Total copper sales volumes of 210,734 tonnes exceeded production in the quarter, driven by sales volumes
at Cobre Panama and Sentinel which increased by 33% and 45%, respectively, from Q1 2020.
- Q1 copper production3 costs: cash cost (“C1”) of $1.24 per lb, and all-in sustaining cost (“AISC”) of $1.72 per
lb, a decrease of $0.06 and increase of $0.08, respectively from Q1 2020. Lower C1 costs were driven by
increased production, favourable foreign exchange and lower fuel costs . AISC was impacted by higher
Zambian royalties, more than offsetting the lower C1 costs.
- Realized copper price6 was $3.25 per lb in the quarter.
- Total gold production was 78,048 ounces in Q1, an increase of 13% from Q1 2020, attributable to record
production of 35,898 ounces at Cobre Panama.
- Nickel production was 4,642 tonnes in Q1 at Ravensthorpe while construction of Shoemaker Levy continued
to advance with the completion of 9 km of the conveyor including the erection of the conveyer highway
overpass.
First Qua ntum Mine rals 21-07
Page 2 of 6
Three months ended
March 31
(U.S. dollars where applicable) 2021 2020
COPPER
- Production2 (tonnes)
205,064
195,285
- Sales (tonnes) 210,734 189,953
- Cost of production3
o AISC (per lb)
$1.72
$1.64
o C1 (per lb) $1.24 $1.30
- Realized price (per lb) 6 $3.25 $2.56
GOLD
- Production (ounces) 78,048 68,788
- Sales (ounces)4 77,391 73,782
NICKEL
- Production (tonnes) 4,642 -
- Sales (tonnes) 2,357 -
Financial Highlights
- Gross profit of $540 million and comparative EBITDA of $811 million for the first quarter of 2021 were
significantly higher than the first quarter of 2020, attributable to increased sales volumes at Cobre Panama,
lower cash costs and a 27% increase in the realized copper price to $3.25 per lb.
- Sales revenues for the quarter of $1,678 million, an increase of $496 million or 42% from the comparable
period of 2020 reflecting increased sales volumes, an increase in the realized copper price, and nickel sales of
$29 million following the restart of Ravensthorpe.
- $743 million of cash flows f rom operating activities ($1.08 per share 1) generated during the quarter, an
increase of $270 million from the comparable period of 2020.
- At April 27 2021, the Company had unmargined copper forward sales contracts for 89,125 tonnes at an
average price of $2.88 per lb outstanding with periods of maturity to December 2021. In addition, the
Company has zero cost copper collar unmargined sales contracts for 212,950 tonnes at weighted average
prices of $3.10 per lb to $3.67 per lb outstanding with maturities to March 2022. The Company also had
unmargined nickel forward sales contracts for 1,092 tonnes at an average price of $7.13 per lb outstanding
with maturities to October 202 1. In addition, the Company has zero cost nickel collar unmargined sales
contracts for 500 tonnes at weighted average prices of $7.50 per lb to $8.55 per lb outstanding with maturities
to August 2021.
- Net debt decreased during the quarter by $347 million to $7,062 million as at March 31, 2021 and further
reduction remains a key priority.
- The Company ended the quarter with $988 million in net unrestricted cash and cash equivalents and in full
compliance with all financial covenants.
First Qua ntum Mine rals 21-07
Page 3 of 6
Three months ended
March 31
(U.S. dollars millions, except where noted otherwise)
2021
2020
Sales revenues
Gross profit
Net earnings (loss) attributable to shareholders of the
Company
Basic and diluted earnings (loss) per share
Comparative EBITDA1
Comparative earnings (loss)1
Comparative earnings (loss) per share1
Cash flow from operating activities
Cash flow from operating activities per share1
1,678
540
142
$0.21
811
150
$0.22
743
$1.08
1,182
147
(62)
($0.09)
434
(79)
($0.11)
473
$0.69
1
Comparative earnings (loss) have been adjusted to exclude items from the corresponding IFRS measure, net earnings (loss) attributable to shareholders
of the Company , which are not considered by management to be not reflective of underlying performance . Comparative earnings (loss), comparative
earnings (loss) per share, comparative EBITDA and cash flows per share are not measures recognized under IFRS and do not have a standardized meaning
prescribed by IFRS. The Company has disclosed these measures to assist with the understanding of results and to provide furth er financial information
about the results to investors. Refer to the “Regulatory Disclosures” section in the MD&A for the quarter ended March 31, 2021 for further information.
The use of comparative earnings (loss) and comparative EBITDA represents the Company’s adjusted earnings (loss) metrics.
2
Production is presented on a copper contained basis and is presented prior to processing through the Kansanshi smelter.
3
AISC and C1 costs per pound are not recognized under IFRS. Refer to the “Regulatory Disclosures” section in the MD&A for the quarter ended March 31,
2021 for further information.
4
Excludes refinery-backed gold credits purchased and delivered under the precious metal streaming arrangement . Refer to MD&A for the quarter ended
March 31, 2021.
5
Adjustments to comparative EBITDA in the first quarter of 2021 relate principally to foreign exchange revaluations (foreig n exchange revaluations in the
first quarter of 2020).
6
Realized metal prices are not recognized under IFRS and defined within the “Regulatory Disclosures” section of MD&A.
GUIDANCE
Market guidance for production, cash costs and capital expenditure remains unchanged from expectations previously
disclosed by the Company.
Guidance provided below is based on a number of assumptions and estimates as of March 31, 2021, including among other
things, assumptions about metal prices and anticipated costs and expenditures. Guidance involves estimates of known and
unknown risks, uncertainties and other factors which may cause the actual results to be materially different. The
unprecedented challenges presented by COVID-19 pose some additional risk to the accuracy of forward looking information.
Production guidance and cost guidance includes current assumptions on the impact of COVID-19 on operations.
Production guidance
000’s 2021
Copper (tonnes) 785 – 850
Gold (ounces) 280 – 300
Nickel (tonnes) 23 – 27
Production guidance by operation
Copper production guidance (000’s tonnes) 2021
Cobre Panama 300 – 330
Kansanshi 210 – 225
Sentinel 230 – 250
First Qua ntum Mine rals 21-07
Page 4 of 6
Other sites 45
Gold production guidance (000’s ounces) 2021
Cobre Panama 120 – 130
Kansanshi 120 – 130
Other sites 40
Nickel production guidance (000’s tonnes) 2021
Ravensthorpe 23 – 27
Cash cost and all-in sustaining cost
Copper 2021
C1 (per lb) $1.20 – $1.40
AISC (per lb) $1.70 – $1.85
Nickel 2021
C1 (per lb) $5.00 – $5.50
AISC (per lb) $5.50 – $6.00
Capital expenditure
2021
Capitalized stripping 250
Sustaining capital and other projects 700
Total capital expenditure 950
Capital expenditure expectation for the full year 2021 includes spend on secondary screening at Cobre Panama, the
smelter expansion at Kansanshi, Shoemaker Levy development at Ravensthorpe and the fourth crusher at Sentinel.
Sustaining capital expenditure is expected to be approximately $290 million including planned maintenance at the
Kansanshi smelter.
Capital expenditure for the quarter ended March 31, 2021 was $180 million.
Interest
Interest expense for the quarter ended March 31, 2021 was $187 million. A significant proportion of the Company’s interest
expense is incurred in jurisdictions where no tax credit is recognized. Interest expense for the full year 2021 is expected to
range between $740 million and $780 million. This includes interest accrued on related party loans to Cobre Panama and a
finance cost accreted on the precious metal streaming arrangement.
Cash outflow on interest paid for the quarter ended March 31, 2021 was $193 million and is expected to be approximately
$525 million for the full year 2021. This figure excludes interest paid on related party loans to Cobre Panama.
Tax
Excluding the impact of interest expense, the effective tax rate for the quarter ended March 31, 2021 was 29%. Excluding
the impact of interest expense, the effective tax rate for the full year 2021 is expected to be approximately 30%.
Depreciation
Depreciation expense for the quarter was $ 286 million. The full year 2021 depreciation expense is expected to be
approximately $1,125 million.
First Qua ntum Mine rals 21-07
Page 5 of 6
CLIMATE CHANGE POLICY
The Company has always been committed to extracting resources responsibly and the sustainability strategy is an intrinsic
part of the Company’s operations. Recently, to formalize this commitment the Company published its approach to climate
change. The approach includes the integration of climate change and energy issues and impacts into the decision making
and strategic planning.
In 2021, the Company is committed to:
- trial reporting in alignment with the Task Force on Climate-related Financial Disclosures (“TCFD”) framework;
- set tangible and realistic targets with an identified pathway to achievement, for absolute emissions levels and the
carbon intensity of the Company’s operations; and
- integrate an internal carbon price and the expected determinant impacts on commodity prices in the evaluation of
our new projects.
Full details of the Company’s climate change approach, commitments to climate change, and other ESG related programs,
policies and data can be found at https://www.first-quantum.com/English/sustainability/default.aspx.
COVID-19
The Company continues to maintain health and sanitary protocols and to support the government health authorities in each
jurisdiction to combat the spread of COVID-19. These measures continue to be reviewed and adjusted as needed.
In Panama, the Company has recently completed the donation of a medical laboratory to the Gorgas Institute’s Centre of
Epidemiological Study. The Company works closely with the institute, sharing its COVID-19 response data for wider country
analysis. Overall, the number of COVID-19 cases in Panama reduced in March and April. However, the immediate province
connected to the mine site is still seeing small community outbreaks and these communities, as well as the broader province,
have limited access to resources. The Company supports the Provincial Government with aerial transport, food, medical
supplies and other facility-based needs. In Zambia, the Company has provided COVID-19 testing equipment and treatment
and isolation facilities for the community. The Company has also pledged financial support for the provision of medical
logistics support in the Solwezi and Kalumbila districts of North-Western Zambia.
In addition to increased medical facility resilience initiatives at the mine clinics in Mauritania, Zambia and Panama, COVID-
19 protective measures to minimize person-to-person transmission in the work place and protect business continuity have
been implemented across all operations.
The Company has worked to manage the logistical challenges presented by the closure of or bottlenecks at border crossings
and ports by using alternative routes where feasible. In the fourth quarter of 2020, some sales shipments were delayed due
to COVID-19 related port restrictions, and similar delays have been experienced to date in 2021. The Company has also
experienced some minor disruptions and additional costs on freight shipments out of Asia. The Company has not
experienced any other major disruptions to supply chains and product shipments since the onset of the pandemic and has
no immediate expectation of further disruptions other than the port delays and potential for additional shipping costs as
noted above.
As cases are identified amongst the workforce, they are contained and isolated according to the established protocols and
in coordination with local health authorities, with limited impact to operations. The Company continues to employ measures
to ensure minimal spread of the contagion, and the health and wellbeing of our workforce continues to be a priority.
COMPLETE FINANCIAL STATEMENTS AND MANAGEMENT’S DISCUSSION AND ANALYSIS
The complete Consolidated Financial Statements and Management’s Discussion and Analysis for the quarter ended March
31, 2021 are available at www.first-quantum.com and at www.sedar.com and should be read in conjunction with this news
release .
First Qua ntum Mine rals 21-07
Page 6 of 6
CONFERENCE CALL & WEBCAST
The Company will host a conference call and webcast to discuss the results on Wednesday, April 28, 2021 at 9:00 am (EDT).
Conference call and webcast details:
Toll-free North America: 1-800-952-5114
Toronto Local and International: 416-406-0743
Toll-free UK: 00-80042228835
Passcode: 4713108#
Webcast: www.first-quantum.com
Conference call replay:
Toll-free North America: 1-800-408-3053
Toronto Local and International: 905-694-9451
Passcode: 8666906#
The conference call replay will be available from April 28, 2021 until 11:59pm EDT on May 12, 2021.
For further information, visit our website at www.first-quantum.com or contact:
Lisa Doddridge, Director, Investor Relations
(416) 361-3400 Toll-free: 1 (888) 688-6577
E-Mail: [email protected]
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION
Certain statements and information herein, including all statements that are not historical facts, contain forward -looking statements and forward-looking
information within the meaning of applicable securities law s. The forward -looking statements include estimates, forecasts and statements as to the
Company’s expectations of production and sales volumes, and expected timing of completion of project development at Enterprise and post -completion
construction activity at Cobre Panama and are subject to the impact of ore grades on future production, the potential of production disruptions, potential
production, operational, labour or marketing disruptions as a result of the COVID -19 global pandemic (including but not li mited to the temporary
suspension of labour activities at Cobre Panama implemented in April 2020), capital expenditure and mine production costs, th e outcome of mine
permitting, other required permitting, the outcome of legal proceedings which involve the Company, information with respect to the future price of copper,
gold, nickel, silver, iron, cobalt, pyrite, zinc and sulphuric acid, estimated mineral reserves and mineral resources, First Quantum’s exploration and
development program, estimated future expenses, exploration and development capital requirements, the Company’s hedging policy, and goals and
strategies. Often, but not always, forward-looking statements or information can be identified by the use of words such as “plans”, “expects” or “does n ot
expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate” or “believes” or variations of such
words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.
With respect to forward -looking statements and information contained herein, the Company has made numerous assumptions including among other
things, assumptions about continuing production at all operat ing facilities, the price of copper, gold, nickel, silver, iron, cobalt, pyrite, zinc and sulphuric
acid, anticipated costs and expenditures and the ability to achieve the Company’s goals. Forward -looking statements and information by their nature are
based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, per formance or
achievements, or industry results, to be materially different from any future results, performance or achievements expr essed or implied by such forward -
looking statements or information. These factors include, but are not limited to, future production volumes and costs, the temporary or permanent closure
of uneconomic operations, costs for inputs such as oil, power and sul phur, political stability in Zambia, Peru, Mauritania, Finland, Spain, Turkey, Panama,
Argentina and Australia, adverse weather conditions in Zambia, Finland, Spain, Turkey, Mauritania, Australia and Panama, labo ur disruptions, potential
social and environmental challenges (including the impact of climate change), power supply, mechanical failures, water supply, procurement and delivery
of parts and supplies to the operations, the production of off-spec material and events generally impacting global economic, political and social stability.
See the Company’s Annual Information Form for additional information on risks, uncertainties and other factors relating to the forward-looking statements
and information. Although the Company has attempted to identify factors that would cause actual actions, events or results to differ materially from those
disclosed in the forward-looking statements or information, there may be other factors that cause actual results, performances, achievements or events
not to be anticipated, estimated or intended. Also, many of these factors are beyond First Quantum’s control. Accordingly, readers should not place undue
reliance on forward -looking statements or information. The Company undertakes no obligation to reissue or update for ward-looking statements or
information as a result of new information or events after the date hereof except as may be required by law. All forward-looking statements and information
made herein are qualified by this cautionary statement.