First Quantum Minerals Announces Start of Re-Commissioning of the Atmospheric Leach Circuit at Its Ravensthorpe Nickel Operation
NEWS RELEASE 15-21 July 22, 2015 www.first-quantum.com
FIRST QUANTUM MINERALS ANNOUNCES START OF RE-COMMISSIONING OF THE ATMOSPHERIC LEACH CIRCUIT AT ITS RAVENSTHORPE NICKEL OPERATION
First Quantum Minerals Ltd. (“First Quantum” or the “Company”, TSX Symbol “FM”, LSE Symbol “FQM”) today reported that, on July 19, the atmospheric leach circuit at its Ravensthorpe nickel operation in Western Australia started re-commissioning after being shut down due to a tank failure in December 2014.
Steady-state production is expected by July 31, at which point the circuit should operate at 50% of production capacity, with throughput of 80 tonnes per hour.
It is planned that this capacity will continue for the next six months, while out of service leach tanks are progressively refurbished.
On Behalf of the Board of Directors 12g3-2b-82-4461 of First Quantum Minerals Ltd. Listed in Standard and Poor’s G. Clive Newall President
For further information visit our website at www.first-quantum.com
North American contact: Sharon Loung, Director, Investor Relations Tel: (647) 346-3934 Fax: (604) 688-3818 Toll Free: 1 (888) 688-6577 E-Mail: [email protected]
United Kingdom contact: Clive Newall, President Tel: +44 140 327 3484 Fax: +44 140 327 3494 E-Mail: [email protected]