Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FLCN.V ·

SRG’s Drill Results Returned Numerous Drill Intersects Above 10% Cg, Including 4.5 Meters at 36.97% Cg

Drill Results

SRG GRAPHITE INC.

Suite 132, 1320 Graham,

Ville Mont-Royal, Québec

H3P 3C8

PRESS RELEASE NR 2017-10

FOR IMMEDIATE RELEASE

SRG’s Drill Results Returned Numerous Drill Intersects Above 10% Cg, Including

4.5 Meters at 36.97% Cg

Montreal, Quebec, Ju ly 19, 2017 – SRG GRAPHITE INC. (TSXV: SRG) (“SRG” or the

“Company”) today announced drilling results, which continue to expand the potential of the

Company’s Lola Graphite project in Eastern Guinea, West Africa. Assay results from 27

boreholes continue to confirm the high -grade potential of the Lola Graphite deposit with ten

intercepts grading above 10% graphitic carbon (“Cg”). Composite results are shown in Table 1.

Highlights:

- Surface weathered profile thicknesses are 32% thicker than the initially estimate d 20

meters

- Borehole LL45-011373 returned 31 meters grading 5.76% Cg, including 14.67 meters at

9.80% Cg

- Borehole LL44-768470 returned 13 meters grading 14.22% Cg, including 4.50 meters at

36.97% Cg

- Borehole LL45-011592 returned 19 meters grading 7.2% Cg, including 7.00 meters at

14.80% Cg

The current drilling program aims at producing the first mineral estimate s for the property’s

surface weathered profile , which will be included in a preliminary economic a ssessment

scheduled for Q4 2017. The weathered profile is approximately 32% thicker than the Company’s

initial estimate of 20 meters, with several holes demonstrating thicknesses of up to 50 meters.

The drilling program will cover approximately 16% of the total surface area of deposit as defined

by geological mapping, a geophysical Max-Min survey and previous drilling and pitting.

"Drill results continue to reaffirm our belief in the quality of this remarkable graphite asset ,"

stated Dr. Marc-Antoine Audet, President and Chief Executive Officer, SRG.

Table 1: Composite Results

The following table presents a summary of the 27 drill hole results. Mineralized intervals were

defined using 1.0% Cg cut-off grades (“cog”).

HOLE-ID FROM

(m)

LENGTH

(m)

CG

(%)

LL44-768470 23.00 13.00 14.22

Including1 4.50 36.97

2

LL45-028438 0.00 26.50 5.09

Including1 10.50 8.00

Including2

3.00 10.90

LL45-052446 0.00 34.50 3.16

Including1

4.50 10.70

Including2

1.50 17.10

LL45-070451 0.00 39.00 3.34

Including1

9.00 6.20

LL45-011373 3.00 31.00 5.76

Including1

14.67 9.80

Including2

5.00 16.32

LL45-094198 0.00 33.00 4.30

Including1

9.50 9.00

Including2

3.50 12.41

LL45-112206 0.00 34.50 5.36

Including1

21.75 7.60

Including2

1.00 10.90

Including2

1.00 18.50

LL45-131212 0.00 22.70 4.56

Including1

9.00 6.60

LL45-148219 0.00 15.00 5.33

Including1

9.00 7.50

Including2

1.50 11.40

Including2

1.50 11.20

LL44-782476 3.00 18.00 2.17

Including1 1.35 10.50

LL45-033503 0.00 23.60 2.65

LL45-075510 0.00 24.50 5.38

Including1 6.50 12.09

LL45-004489 9.00 17.50 4.88

LL45-002536 7.50 24.00 6.82

LL45-174598 1.50 19.50 4.34

LL45-181651 1.50 16.60 5.09

LL45-162645 16.50 13.00 6.25

LL45-105625 12.00 7.50 4.68

LL45-067612 15.00 13.90 4.91

LL45-011592 3.00 19.00 7.02

Including1 7.00 14.46

LL45-030598 3.00 27.00 2.53

LL45-170756 0.00 14.50 5.66

LL47-796005 0.00 27.00 3.65

LL48-015012 0.00 24.30 7.27

3

LL48-033019 0.00 23.00 3.76

Including1 9.00 4.74

Including1 2.50 7.64

LL48-052026 4.00 20.00 4.97

LL48-071033 0.00 16.50 3.41

13% Cg cog.

210% Cg cog.

The Lola Graphite Project is 100% owned by Sama Resources Guinea SARL, a fully owned

subsidiary of the Company . The Graphite Project is located near the town of Lola in eastern

Guinea and within 50 km from the border with Côte d’Ivoire.

Core logging and sampling was performed at S RG’s facility in the Lola village. Sample

preparations were performed at Veritas Laboratory in Abidjan, Ivory Coast. Sample pulps were

delivered to Activation Laboratories Ltd., Ancaster, Ontario, Canada. The samples were treated

through a multistage furnace process to remove organic carbon and carbonate carbon. The

remaining graphitic carbon was measured as carbon dioxide in the infrared (“IR”) cell as gases

flow through the cell . Carbon dioxide absorbs IR energy at a precise wavelength within the IR

spectrum. All analysis were performed using Eltra instruments.

About SRG Graphite Inc. (SRG)

SRG is a Canadian-based company focused on developing the Lola Graphite deposit, located in

the Republic of Guinea, West Africa. SRG is committed to operate in a socially, environmentally

and ethically responsible manner.

For additional information, please visit SRG’s website at www.srggraphite.com.

For more information contact:

SRG Graphite Inc. (SRG)

Dr. Marc-Antoine Audet, President & CEO

Tel.: (514) 726-4158

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release.

Forward-Looking Statements

Certain of the statements made and information contained herein are "forward -looking

statements" within the meaning of Canadian securities legislation or "forward -looking

information" within the meaning of the Ontario Securities Act and the Securities Act (British

Columbia). This includes statements concerning the Company's plans at its mineral

properties, which involve known and unknown risks, uncertainties and other factors which may

cause the actual results, performance or achievements of the Company, or industry results, to

vary or be materially different from any future results, performance or achievements expressed

or implied by such forward -looking statements or forward -looking information. Information

regarding drilling results may also be deemed to be forward -looking statements or forward -

looking information in that they reflect a prediction of what may be found to be present when

and if a project is actually developed.

4

Forward-looking statements and forward-looking information are subject to a variety of risks and

uncertainties which could cause actual events or results to differ from those reflected in the

forward-looking statements or forward -looking information, including, without limitation, the

availability of financing for activit ies, risks and uncertainties relating to the interpretation of drill

results and the estimation of mineral resources and reserves, the geology, grade and continuity

of mineral deposits, the possibility that future exploration, development or mining results will not

be consistent with the Company's expectations, metal price fluctuations, environmental and

regulatory requirements, availability of permits, escalating costs of remediation and mitigation,

risk of title loss, the effects of accidents, equipment b reakdowns, labour disputes or other

unanticipated difficulties with or interruptions in exploration or development, the potential for

delays in exploration or development activities, the inherent uncertainty of cost estimates and

the potential for unexpect ed costs and expenses, commodity price fluctuations, currency

fluctuations, expectations and beliefs of management and other risks and uncertainties.

In addition, forward -looking statements and forward -looking information are based on various

assumptions. Should one or more of these risks and uncertainties materialize, or should

underlying assumptions prove incorrect, actual results may vary materially from those described

in forward-looking information or forward -looking statements. Accordingly, readers are advised

not to place undue reliance on forward -looking statements or forward -looking information.

Except as required under applicable securities legislation, the Company undertakes no

obligation to publicly update or revise forward-looking statements or forward-looking information,

whether as a result of new information, future events or otherwise.