Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FLCN.V ·

SRG Mining Announces Strategic Corporate Update Updated Feasibility Study Underway To Double Mine Production Second Transformation CSPG Preliminary Economic Assessment Also Awarded

Corporate Updates

1

SRG Mining Inc.

1320 Graham, Suite 132

Ville Mont-Royal, Québec

H3P 3C8

SRG Mining Announces Strategic Corporate Update

Updated Feasibility Study Underway To Double Mine Production

Second Transformation CSPG Preliminary Economic Assessment Also Awarded

PRESS RELEASE FOR IMMEDIATE RELEASE

Montreal, Quebec, May 18, 2022 - SRG Mining Inc. (TSXV: SRG) (“SRG” or the “Company”) today

announced further details on the strategic corporate plan to develop its Lola Graphite Project in the

Republic of Guinea (the “ Lola Project”) into a fully integrated supplier of battery anode material to

the European market. The integrated business model would result in the creation of a mine-to-market

active anode material producer, hosting a large high-purity graphite production mine and concentrator

in Africa and a value-added, coated spherical purified graphite (“CSPG”) conversion facility in Europe.

Two Studies Underway

The Company announced today the start of an independent, updated feasibility study (the “Updated

Feasibility Study” or “UFS”), which will include basic engineering, to confirm technical opportunities

and capital and operating costs for target initial production of 100,000 tonnes per annum (“tpa”) of

graphite as concentrate from the Lola Project. The UFS follows the 2019 Feasibility Study which was

prepared by DRA Global Limited (“DRA”).

Following extensive consultation with its partners, technical consultants, industry participants and

potential offtake partners SRG has concluded that an increase in concentrate production, from 50,000

tpa as disclosed in the 2019 Feasibility Study to 100,000 tpa, is expected to significantly increase

capital efficiency and project economics. The Updated Feasibility Study will also be prepared by DRA

and is scheduled to be completed in Q4 2022.

In parallel with the UFS the Company also announced today the start of an independent, preliminary

economic assessment ( “PEA”) of initial options for the start -up of a second transformation step to

produce CSPG from the Lola Project graphite concentrate. The PEA will be prepared by Dorfner

Analysenzentrum und Anlagenplanungsgesellschaft mbH (“Anzaplan”), a leading consultancy and

engineering company for industrial, specialty mineral and metal projects , based in Hirschau,

Germany. The PEA is scheduled to be completed in Q1 2023.

2

An integral part of the PEA will be to update existing metallurgical test work on spheroidization,

purification and coating aspects to produce a high-quality CSPG product. The Company will provide

Anzaplan and its partners with part of its 10 tonnes bulk sample concentrate, which it has available

from previous pilot-scale metallurgical test work. The results of the additional metallurgical test work

will also provide valuable samples for future offtakers to accelerate the extensive product qualification

and test work required by cell manufacturers.

“These studies are a continuation of the previously announced strategy and will enable the Company

to advance discussions with both financial institutions as well as potential customers,” said Matthieu

Bos, President and Chief Executive Officer. “Given the projected surge in demand for graphite from

the electric-vehicle revolution and renewable energy technologies, the Lola Project will be of

significant strategic importance for auto makers and clean -energy companies looking to secure a

long-term, reliable supply of high-quality graphite.”

Financing and Offtake Discussions Progressing

The Company is advancing discussions with multiple parties who have expressed interest in providing

debt financing to advance SRG towards first production. Binding offtake offers have been received

for more than 50% of the initial 100,000 tpa graphite concentrate production.

SRG will provide further comment only if a specific transaction or process is concluded, or if further

disclosure is required or deemed appropriate. There can be no assurance that the Company will

pursue any transaction or that a transaction, if pursued, will be completed.

About SRG Mining

SRG Mining is a Canadian-based mining company focused on developing the Lola Graphite Project

located in the Republic of Guinea, West Africa. The Lola Graphite Project has a Probably Reserves

of 42Mt at a grade of 4.2% Cg. SRG aims to develop a fully integrated source of battery anode material

to supply the European lithium-ion and fuel cell markets. With attractive operating costs, proximity to

European end-markets and strong ESG credentials, the Company is poised to become a reliable

supplier while promoting sustainability and supply chain transparency. SRG is committed to generating

sustainable, long-term benefits that are shared with the host countries and communities where it operates.

About DRA Global Limited

DRA Global Limited (ASX: DRA | JSE: DRA) is a multi -disciplinary consulting, engineering, pr oject

delivery and operations management group predominantly focused on the mining and minerals

resources sector. DRA has expertise in mining, minerals and metals processing and related non -

process infrastructure including sustainability, water and energy solutions for the mining industry. DRA

delivers advisory, engineering and project delivery services throughout the capital project lifecycle

from concept through to operational readiness and commissioning as well as ongoing operations,

maintenance and shutdown services.

For additional information, please visit SRG’s website at www.srgmining.com.

Contact :

3

Matthieu Bos

President & CEO

Email: [email protected]

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV) accepts responsibility for the adequacy or accuracy of this release.

FORWARD-LOOKING STATEMENTS

This press release contains "forward-looking information" within the meaning of Canadian securities

legislation. All information contained herein that is not clearly historical in nature may constitute

forward-looking information. Generally, such forward-looking information can be identified by the use

of forward -looking terminology such as “plan”, “result”, “confirm”, “target”, “increase”, “expect”,

“scheduled”, “enable”, projected”, “drive”, “aim”, “realise”, “growth”, “goals”, “continue”, “adv ance”,

“potential”, “will”, “demonstrate”, “deliver”, “believe”, or variations of such words and phrases or state

that certain actions, events or results "may", "could", "would" or "might". Forward-looking information

is subject to known and unknown risks, uncertainties and other factors that may cause the actual

results, level of activity, performance or achievements of the Company to be materially different from

those expressed or implied by such forward-looking information, including but not limited to: (i) volatile

stock price; (ii) the general global markets and economic conditions; (iii) the possibility of write-downs

and impairments; (iv) the risk associated with exploration, development and operations of mineral

deposits and mine plans for the Company’s mining operations; (v) the risk associated with establishing

title to mineral properties and assets including permitting, development, operations and production

from the Company’s operations being consistent with expectations and projections; (vi) fluc tuations

in commodity prices, finding offtake takers and potential clients or enforcing such agreements against

same and other risks and factors described or referred to in the section entitled "Risk Factors" in the

MD&A of the Company and which is available at www.sedar.com, all of which should be reviewed in

conjunction with the information found in this news release.

Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in the forward-looking information, there may be other factors

that cause results not to be as anticipated, estimated or intended. There can be no assurance that

such forward-looking information will prove to be accurate, as actual results and fu ture events could

differ materially from those anticipated in such forward -looking information. Such forward -looking

information has been provided for the purpose of assisting investors in understanding the Company's

business, operations and exploration pl ans and may not be appropriate for other purposes.

Accordingly, readers should not place undue reliance on forward-looking information. Forward-looking

information is given as of the date of this press release, and the Company does not undertake to

update such forward-looking information except in accordance with applicable securities laws.