Frontier Lithium Strikes High-Grade Lithium at Ember Pegmatite 1km from the Spark Resource
Frontier Lithium Strikes High-Grade Lithium at
Ember Pegmatite 1km from the Spark
Resource
SUDBURY, ON
,
Nov. 19, 2024
/CNW/ - Frontier Lithium Inc. (TSXV: FL) (FRA: HL2)
(OTCQX: LITOF) ("Frontier" or "the Company"), is pleased to announce progress on fieldwork
activities supporting Phase 1 of the definitive feasibility study on the PAK Lithium Project and provide
an exploration update, including details on the maiden drillhole at the Ember LCT pegmatite, located
1 km west-northwest of the Spark deposit.
Highlights
DDH PL-138-24 intersected 18.8 metres of pegmatite from 42.7 to 61.4 meters, averaging
1.43% Li
2
O.
Including
7.8 m
averaging 2.54% Li
2
O. from 48.9 to
56.7 m
,
Extends the surface LCT pegmatite zone to at least
40m
depth.
Lithogeochemical orientation survey completed over the Spark deposit and surrounding area.
The Ember pegmatite originally called Spark-Ext, was channeled in 2023 with two parallel channels
averaging 2.16% Li2O over the combined length of
18 m
including
6m
averaging 3.27% Li
2
O (
Press Release
Sept 25, 2023
).
"Results from PL-138-24 have extended the high-grade lithium zone at surface to a depth of 40
metres, further enhancing the exploration potential of the pegmatite" states
Garth Drever
, VP
Exploration "Structural measurements on the outcrop and from oriented drill core suggest a West
Southwest-East Northeast orientation of the Ember pegmatite which is consistent to the Spark
deposit suggesting a possible en echelon structural relationship. Since they share similar textural and
mineralogical features, the unexposed potential of Ember could prove to be significant."
During the same period, three condemnation diamond drill holes were completed on proposed
stockpile sites for definitive feasibility study and a small-scale regional exploration program was
completed. Field mapping and prospecting on claim blocks north of the mining leases identified
target areas that will require further work, including detailed mapping and channel sampling. A
lithogeochemical orientation survey was initiated by sampling host rock at the Spark and Bolt
pegmatites and surrounding areas, including the Ember pegmatite. The objective is to assess the
potential of identifying unexposed pegmatites by vectoring towards areas of higher fractionation.
Figure 1 is a compilation map shows the location of the two channels and drill hole PL-138-24 at
Ember in both plan and section view. The dashed lines on the lower right map outlines the potential
extension of the Ember pegmatite which is also an area of glacial ground moraine with abundant
glacial erratics (boulders) of varying size and composition. Further work is required to determine the
thickness of the overlying glacial material away from the exposed portion of the pegmatite.
Figure 1: Compilation of Ember Pegmatite showing both plan and section views (CNW
Group/Frontier Lithium Inc.)
Figure 2: Photo of drill core show high grade section from 48.9 to 56.7m averaging 2.54% Li2O
(CNW Group/Frontier Lithium Inc.)
Table 1 details the mineralized intersection on the Ember pegmatite while Table 2 summarize all drill
holes completed at the PAK Project in 2024.
Table 1: Summary of the Drill Hole Intersection at Ember
DDH PL-138-24
Drill hole PL-138-24 was designed to follow up on the results from channel samples CH-52 and CH-53 and test the Ember LCT pegmatite outcrop at depth. The
results confirm that the LCT pegmatite extends 40 meters below the surface, with a slightly wider zone than expected but a lower grade compared to the
surface channel samples.
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Pegmatite Zone
42.7
61.4
18.8
1.43
0.010
75
66
130
0.16
Pegmatite-Aplite
including
48.9
56.7
7.8
2.54
0.010
74
69
121
0.20
Pegmatite
Table 2: Summary of 2024 Phase XIV Drilling at the PAK Project
DDHNo
Date Drilled
UTM Zone 15N (NAD83)
Collar Orient
Metres Drilled
Start
End
Easting
Northing
(mASL)
Azim
Dip
Start
End
Spark - Geotechnical Phase XIV
PL-GDH-24-24
2024-02-17
2024-02-25
472,759
5,829,448
351.7
128
-72
0
248.6
PL-GDH-25-24A
2024-02-25
2024-02-27
472,695
5,829,440
352.0
228
-72
0
65.5
PL-GDH-25-24
2024-02-27
2024-03-05
472,699
5,829,432
352.0
228
-72
0
245.8
PL-GDH-26-24
2024-03-06
2024-03-11
472,692
5,829,527
355.0
323
-72
0
248.8
PL-GDH-27-24
2024-03-11
2024-03-17
472,763
5,829,539
360.0
19
-70
0
248.8
Total
1057.5
Condemnation - Phase XIV
PL-134-24
2024-03-19
2024-03-21
472,272
5,829,220
329.0
1
-46
0
205.5
PL-135-24
2024-08-21
2024-08-25
473,800
5,830,040
337.9
11
-44
0
200.3
PL-136-24
2024-08-26
2024-09-01
474,304
5,830,018
326.9
191
-46
0
250.5
PL-137-24
2024-09-01
2024-09-06
474,301
5,830,018
326.9
9
45
0
215.7
Total
872.0
Exploration
PL-138-24
2024-09-08
2024-09-09
471,330
5,829,964
331.0
155
-45
0
102.0
Total
102.0
Grand Total
2031.5
In addition to the diamond drilling at Ember, activities to advance the PAK Lithium Project are
ongoing. These include work in support of the mine and mill definitive feasibility study, environmental
baseline and monitoring to support permitting, and community engagement. During May and June,
geotechnical drilling and test pits were conducted on potential infrastructure sites, including waste
rock stockpiles, tailings management, and mine and mill facilities. From August to September, a
Stage 2 archaeology field investigation was completed by a licensed archaeologist with participation
from a local First Nation community. All environmental baseline studies focused on the mine and mill
were concluded in November, with final reports set for release by the end of 2024. These efforts
support ongoing permitting advancement and community engagement with First Nations focused on
creating a stronger understanding of the project and mitigating any concerns brought forward.
Due Diligence
All scientific and technical information in this release has been reviewed and approved by
Garth Drever, P.Geo., the qualified person ("QP") under the definitions established by National
Instrument 43-101 -
Standards of Disclosure for Mineral Projects
. Under Frontier's QA/QC
procedures, all drilling was completed by Chenier Drilling Ltd. of
Val Caron, Ontario
using thin walled
BTW drill rods (4.2 cm core diameter) and a Reflex ACT III oriented core system. Using the Reflex
system, the drill core was oriented and marked as it was retrieved at the drill. A Reflex EZ-Trac
survey instrument was used every
50m
downhole and again at the end of each hole when rods were
pulled out. A Reflex North Finder APS unit was utilized to complete accurate positioning and
orientation of the drill collar upon setup. The core was boxed and delivered to the Frontier core
shack where it was examined, geologically logged, and marked for sampling. The core was
photographed prior to sampling. Using a rock saw, the marked sample intervals were halved with
one-half bagged for analysis. Sample blanks along with lithium certified reference material was
routinely inserted into the sample stream in accordance with industry recommended practices. Field
duplicate samples were also taken in accordance with industry recommended practices. The
samples were placed in poly sample bags and transported to AGAT Laboratories Ltd. (AGAT) in
Thunder Bay, Ontario
for sample preparation and to
Mississauga, Ontario
for processing and
quantitative multi-element analysis. AGAT is an ISO accredited laboratory. The core is stored on site
at the Company's Knox exploration camp.
About Frontier Lithium
Frontier Lithium Inc. is a pre-production business with an objective to become a strategic and
integrated domestic supplier of spodumene concentrates for industrial users as well as battery-
grade lithium hydroxide and other chemicals to the growing electric vehicle and energy storage
markets in
North America
. The Company's PAK Lithium Project maintains the largest land position
and resource in a premium lithium mineral district located in
Ontario's
Great Lakes region.
About the PAK Lithium Project
The PAK Lithium Project contains
North America's
highest-grade lithium reserves and is the largest
in
Ontario
by size. The project encompasses close to 27,000 hectares and remains largely
unexplored; however, since 2013, the company has delineated two premium spodumene-bearing
lithium deposits (PAK and Spark), located 2.3 kilometres apart. Exploration is continuing on the
project through two other spodumene-bearing discoveries: the Bolt pegmatite (located between the
PAK and Spark deposits), as well as the Pennock pegmatite (25 kilometres northwest of PAK
deposit within the project claims). A 2023 Pre-Feasibility Study "National Instrument 43-101
Technical Report PFS PAK Lithium Project" by BBA E&C Inc., delivered a 24-year project life,
delivering a post-tax NPV(8%) of
US$1.74 billion
and IRR of 24.1% as per the press release
disseminated on
May 31, 2023
, and was filed on SEDAR+ (
www.sedarplus.ca
)
Cautionary Note Regarding Forward-Looking Statements
This news release includes certain statements that may be deemed "forward-looking statements".
All statements in this release, other than statements of historical fact constitute forward-looking
statements. Forward looking statements contained in this news release may include, but are not
limited to, statements with respect to: estimated mineral resources, estimated capital costs to
construct mine facilities, estimated operating costs, the duration of payback periods, estimated
amounts of future production, estimated cash flows, net present value, the DFS and statements that
address future production, resource and reserve potential, exploration drilling, exploitation activities
and events or developments that the Company expects.
Although the Company believes the expectations expressed in such forward-looking statements are
based on reasonable assumptions, such statements are not guarantees of future performance and
actual results may differ materially from those expressed in the forward-looking statements.
Forward-looking statements involve inherent risks and uncertainties. Risk factors that could cause
actual results to differ materially from those in forward looking statements include: market prices for
commodities, increases in capital or operating costs, construction risks, availability of infrastructure
including roads, regulatory and permitting risks, exploitation and exploration successes, continued
availability of capital and financing, financing costs, and general economic, market or business
conditions. Investors are cautioned that any such statements are not guarantees of future
performance and those actual results or developments may differ materially from those projected in
the forward-looking statements. For more information on the Company, please review the
Company's public filings available at
www.sedarplus.ca
.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.
SOURCE
Frontier Lithium Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/November2024/19/c3550.html
%SEDAR: 00008434E
For further information:
Company Contact Information: Bora Ugurgel, Senior Manager, Investor
Relations, 2614 Belisle Drive Val Caron, ON., P3N 1B3 CANADA, T. +001 705.897.7622, F. +001
705.897.7618
CO: Frontier Lithium Inc.
CNW 07:45e 19-NOV-24