Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FL.V ·

Frontier Lithium Reports First Quarter Results

Financials

FRONTIER LITHIUM REPORTS FIRST

QUARTER RESULTS

SUDBURY, ON

,

Aug. 28, 2023

/CNW/ -

Frontier Lithium Inc.

(TSXV: FL) (FRA: HL2) (OTCQX:

LITOF) ("Frontier" or the "Company") has reported financial results for the first quarter ended

June

30, 2023

. The financial statements and the related management's discussion and analysis have been

filed on SEDAR+ and can be viewed under the company's profile on SEDAR+.

The company continues to advance its plans to develop a lithium salts refining plant in

North

America's

Great Lakes region. Frontier is advancing the definitive feasibility study ("DFS"),

assessing the viability of constructing and operating a fully integrated lithium mining and chemicals

company to deliver battery-grade lithium carbonate and lithium hydroxide for the burgeoning lithium-

ion battery market in

North America

.

On

June 30, 2023

, the company had cash and cash equivalents of

$22.34 million

, leaving it well

positioned to meet corporate and administrative expenses and to further execute on its planned

business objectives.

Highlights for the quarter ended

June 30, 2023

, and recent developments:

EXPLORATION

PHASE XIII DRILL PROGRAM

Phase XIII drill program commenced in

February 2023

with four additional holes drilled at Spark

testing the western extension of the deposit before delineating the Bolt pegmatite. Since February,

the Company has completed

11,364m

in 46 drill holes, including geomechanical and hydrogeological

test work at the PAK deposit, delineating Bolt pegmatite as well as condemnation drilling in areas of

proposed infrastructure.

REGIONAL MAPPING PROGRAM

Since

May 2023

, follow-up to the 2022 reconnaissance program has been underway including more

detailed prospecting/mapping and channel sampling. In 2022, a new spodumene-bearing pegmatite

zone, 10 by

15m

, was discovered approximately 1 km west-northwest of the Spark pegmatite with

grab samples averaging 3.1% Li

2

O. Prospecting and mapping in the Pennock pegmatite area

discovered additional pegmatite dykes up to

30m

in length and 3 to

5 m

in width, grab samples

averaging 1.7% Li

2

O.

RESULTS OF PRE-FEASIBILITY STUDY

In

May 2023

, the Company released the results of PFS for a proposed mine-to lithium

chemical/hydromet plant facility. The PFS was published on

July 14

th

, 2023. The results of the PFS

include a post-tax NPV at an 8 percent discount rate of

US$1.74 billion

with a post-tax IRR of 24.1

percent. The PFS confirms that the 100% owned Project could be the continent's largest and

lowest-cost producer of lithium hydroxide able to supply the rapidly growing electric vehicle industry

in North America.

CORPORATE LEADERSHIP TEAM CHANGES

In

June 2023

, the Company appointed Mr. Gregory Da Re as Vice President of Corporate

Development. Mr. Da Re brings a deep understanding of electric vehicle battery supply chains and

two decades of experience as an accomplished investment executive.

In

August 2023

, the Company announced the appointment of Mr.

Erick Underwood

as its new Chief

Financial Officer. Mr. Underwood brings with him over 25 years of extensive experience in the

finance and project development sectors within the mining industry.

OTHER MATTERS

ANNUAL GENERAL MEETING

Annual General Meeting of the shareholders of Frontier Lithium Inc. will be held on

Wednesday,

September 13, 2023

, at

2:00 p.m.

(

Toronto

time) virtually via the Zoom Meeting Platform.

Shareholders can visit

this link

to register for the event and

this link

to submit their questions.

About Frontier Lithium

Frontier Lithium (TSX-V: FL) (FRA: HL2) (OTCQX: LITOF) is a preproduction business with an

objective to become an integrated strategic domestic supplier of spodumene concentrates for

industrial users as well as battery-grade lithium hydroxide and other chemicals to the growing

electric vehicle and energy storage markets in

North America

. The Company's sole project maintains

the largest land position and resource in a premium lithium mineral district located in

Ontario's

Great

Lakes region.

About PAK Lithium Project

The PAK lithium project contains

North America's

highest-grade lithium resource and is the second

largest in

North America

by size. The project encompasses close to 27,000 hectares and remains

largely unexplored; however, since 2013, the company has delineated two premium spodumene-

bearing lithium deposits (PAK and Spark), located 2.3 kilometres apart. Exploration is continuing on

the project through two other spodumene- bearing discoveries: the Bolt pegmatite (located between

the PAK and Spark deposits), as well as the Pennock pegmatite (25 kilometres northwest of PAK

deposit within the project claims). A 2023 Pre-Feasibility Study "National Instrument 43-101

Technical Report PFS PAK Lithium Project" by BBA E&C Inc., delivered a 24- year project life,

delivering a post-tax NPV (8%) of

US$1.74 billion

and IRR of 24.1% as per the press release

disseminated on

May 31, 2023

, and was filed on SEDAR+.

Forward-looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this news release. This news release includes certain statements that may be deemed "forward-

looking statements". All statements in this release, other than statements of historical fact constitute

forward-looking statements. Forward looking statements contained in this news release include, but

are not limited to, statements with respect to: estimated mineral resources, estimated capital costs

to construct mine facilities, estimated operating costs, the duration of payback periods, estimated

amounts of future production, estimated cash flows, net present value (NPV) , and statements that

address future production, reserve potential, exploration drilling, exploitation activities and events or

developments that the Company expects.

Although the Company believes the expectations expressed in such forward-looking statements are

based on reasonable assumptions, such statements are not guarantees of future performance and

actual results may differ materially from those expressed in the forward-looking statements.

Forward-looking statements involve inherent risks and uncertainties. Risk factors that could cause

actual results to differ materially from those in forward looking statements include: market prices for

commodities, increases in capital or operating costs, construction risks, availability of infrastructure

including roads, regulatory and permitting risks, exploitation and exploration successes, continued

availability of capital and financing, financing costs, and general economic, market or business

conditions. Investors are cautioned that any such statements are not guarantees of future

performance and those actual results or developments may differ materially from those projected in

the forward-looking statements. For more information on the Company, Investors should review the

Company's registered filings available at SEDAR+.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or

accuracy of this release.

SOURCE

Frontier Lithium Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/August2023/28/c7537.html

%SEDAR: 00008434E

For further information:

Bora Ugurgel, Senior Manager, Investor Relations, 2736 Belisle Drive Val

Caron, ON. P3N 1B3 CANADA, T. +001 705.897.7622, F. +001 705.897.7618

CO: Frontier Lithium Inc.

CNW 17:00e 28-AUG-23