Frontier Lithium expands its PAK Lithium project with Maiden Resource Estimate for the Spark Pegmatite including 3.2 MT in indicated and 12.2 MT in the inferred categories

Resource Estimates

Frontier Lithium expands its PAK Lithium

project with Maiden Resource Estimate for the

Spark Pegmatite including 3.2 MT in indicated

and 12.2 MT in the inferred categories

Highlights

Resource Estimate for Spark Pegmatite includes 3.25 million tonnes averaging 1.59% Li

2

O in

the Indicated category;

Includes another 12.23 million tonnes averaging 1.36% Li

2

O in the Inferred category;

The Spark lithium deposit remains open in all directions;

Estimate was completed by WSP using 2499.5 metres of drilling in 9 holes and 288.4 metres of

channel cuts in 12 channels.

Surface mapping of the Spark Pegmatite includes 1.9 hectares of exposed spodumene-bearing

pegmatite.

Preliminary Electron microprobe data suggest much of the spodumene within the pegmatite

contains Fe

2

O

3

levels consistent with Technical Grade Concentrates.

SUDBURY, ON

,

Feb. 4, 2020

/CNW/ -

Frontier Lithium Inc. (TSX.V: FL) (the "Company" or

"Frontier")

is pleased to report a Canadian National Instrument (N.I.) 43-101 maiden mineral

resource estimate for the Spark deposit, located within the "Electric Avenue" in northwestern,

Ontario

. The resource estimation has been prepared by WSP Canada Inc. (TSX: WSP). WSP is

one of the largest engineering firms in

Canada

and has a mining division maintaining independent

consulting geologists and engineers. Table 1 is a summary of the mineral resource estimate.

"We are pleased to have been able to put out this Maiden Lithium Mineral Resource estimate less

than 14 months after the 'discovery' of the Spark pegmatite", commented

Trevor Walker

, President

and CEO of Frontier Lithium. "Located in

Ontario's

premium lithium jurisdiction, the Electric Avenue,

this second deposit on the PAK Lithium project supports our exploration model and highlights the

resource upside potential for any required expansion in the future. The management is focused

on Phase I Development plans under an Advanced Exploration program to confirm the Project's

economic viability through the construction and operation of a Demonstration Concentrator Plant"

added Walker.

Table 1: Summary of Mineral Resource Estimate for Spark Pegmatite

Cut-Off

Resource

Category

Tonnes (t)

Li

2

O

(%)

Nb

2

O

5

(ppm)

Cs

2

O

(%)

Ta

2

O

5

(ppm)

Rb

2

O

(%)

SnO

2

(ppm)

Lithology

0.65%

Li

2

O

Indicated

3,248,000

1.59

56

0.015

123

0.26

68

Aplite/LIZ

Inferred

12,228,000

1.36

45

0.020

107

0.23

53

Aplite/LIZ

Mineral Resource Estimate Notes

1.

Mineral Resources were prepared in accordance with NI 43-101 and the CIM Definition Standards (2014). Mineral resources that are not mineral reserves do not have

demonstrated economic viability. This estimate of mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical,

marketing, or other relevant issues.

2.

Open pit Mineral Resources are reported at a cut-off grade of 0.65 % Li2O that is based on a spodumene concentrate prices of US$700/tonne and an exchange rate of 1.3.

3.

Appropriate mining costs, processing costs, metal recoveries, and inter ramp pit slope angles were used by WSP to generate the pit shell.

4.

Rounding may result in apparent summation differences between tonnes, grade, and contained metal content.

5.

Tonnage and grade measurements are in metric units.

6.

Contributing assay composites were capped at 3.55% Li

2

O.

7.

A bulk density factor of 2.718 was applied to the pegmatite based on 241 measurements.

Modeling was performed using GEOVIA Surpac® 2019 software with grades estimated using ordinary kriging (OK) interpolation methodology. Samples were composited at 1.0

metre down hole and composites were capped at 3.55% Li

2

O. Block grades were estimated on a multi pass basis with a minimum and maximum number of composites required

for each estimation pass. Block size is 2 metre by 2 metre (y) by 2 metre (z).

Additional information about the Mineral Resource modeling methodology will be documented in the upcoming NI 43-101 technical report (the "Technical Report").

The Spark pegmatite was initially discovered in September 2018. Channel sampling was initiated

immediately after discovery whereby drilling began in

February 2019

and was completed by

August

2019

. Figure 1 shows the location of the Spark pegmatite with the location of all 12 channel cuts

and the drill hole traces of all 9 drill holes. The results from the channels and drilling has been

reported in Press Releases dated

January 17

,

April 9

,

May 30

,

September 24, 2019

and

January 7

,

2020. A total of 2499.5 metres of drilling in 9 holes and 288.4 metres of channel cuts in 12 channels

were used in the Resource Estimate. The immediate area has been mapped with 1.9 hectares of

exposed pegmatite as shown on Figure 1.

Click here for figure 1

Figure 1: Location Map showing project area and location of drill holes and channels on the Spark

Pegmatite

Geological logging of channels and drill core combined with multi-element geochemistry indicates a

high degree of compositional homogeneity throughout the deposit. The pegmatite consists primarily

of sodic aplite which is typically fine to medium grained, light grey to greenish grey locally with

coarser zonations consisting of megacrystic feldspar, fine to coarse-grained light grey to white

spodumene laths, grey quartz and variable amounts of muscovite. The coarser grained zones are

similar in appearance and composition to the LIZ (Lower Intermediate Zone) at the PAK deposit 2.3

km to the south west.

Figure 2 is a 3D rendering of the block model and required pit shell of the Spark pegmatite. The

deposit's current dimensions are roughly

300m

in length by 50 to over

100m

in width. Drilling has

extended the deposit to at least

250m

in depth. It remains open in all directions.

Click here for figure 2

Figure 2: 3D Rendering of the Spark Pegmatite showing drill holes, channels and Block Model

used in the Resource Calculation

The required pitshell is 700 x 660 by

240 m

in depth. Section A1-A2 displays the Li

2

O grades

across the central portion of the delineated pegmatite as shown in Figure 1 and 2.

Polished thin sections of drillcore were selected specifically for EMP (electron microprobe) analysis

of spodumene during both drill programs. The analysis was completed in early

November 2019

at

QFIR (Queen's Facility for Isotope Research) at Queen's University in

Kingston

, Ontario.

Preliminary results indicate a range of Fe

2

O

3

content within the spodumene of below detection to

0.5%. Figure 5 displays the range of Fe

2

O

3

analysis from north to south across the deposit.

Click here for Figure 3

Figure 3: Preliminary Fe

2

O

3

Content of Spodumene from drillcore throughout the Spark Pegmatite

Spodumene from polished thin sections from holes PL-038-19, PL-040-19, Pl-043-19 and PL-044-19

have Fe

2

O

3

levels at or below 0.1% Fe

2

O

3

. Other holes with the exception of PL-039-19 (average

of 0.37%) average below 0.2% Fe

2

O

3

. Fe

2

O

3

levels at or below 0.15 can be considered suitable

for technical grade material.

Due Diligence

All scientific and technical information in this release has been reviewed and approved by

Todd

McCracken

, P.Geo., Manager - Mining for WSP, the qualified person (QP) and

Garth Drever

,

P.Geo., VP Exploration for Frontier Lithium Inc. the qualified person (QP) under the definitions

established by National Instrument 43-101. Under Frontier's QA/QC procedures, all drilling was

completed by Chenier Drilling Ltd. of

Val Caron, ON

using thin-walled BTW drill rods (4.2 cm core

diameter) and a Reflex ACT III oriented core system. Using the Reflex system, the drill core was

oriented and marked as it was retrieved at the drill. The core was boxed and delivered to the

Frontier core shack where it was examined, geologically logged and marked for sampling. The core

was photographed prior to sampling. Using a rock saw, the marked sample intervals were halved

with one halve bagged for analysis. Sample blanks along with lithium, rubidium and cesium certified

reference material was routinely inserted into the sample stream in accordance with industry

recommended practices. Field duplicate samples were also taken in accordance with industry

recommended practices. The samples were placed in poly sample bags and transported to

Red

Lake

by Frontier employees and then shipped to AGAT Laboratories Ltd. (AGAT) in

Mississauga,

ON

for quantitative multi-element analysis. AGAT is an ISO accredited laboratory. All petrographic

sample preparation and electron microprobe (EMP) analysis was completed at the Queen's Facility

for Isotope Research (QFIR) at Queen's University in

Kingston, Ontario

under the direct supervision

of Dr.

Steve Beyer

. The core is stored on site at the Pakeagama Lake exploration camp.

About Frontier Lithium

Frontier Lithium is a Canadian junior mining company with the largest land position in the Electric

Avenue, an emerging premium lithium mineral district located in the Canadian Shield of northwestern

Ontario

. The company's PAK Lithium Project contains

North America's

highest concentration of rare

low-iron spodumene. Frontier Lithium's objective is to firstly build a Phase I concentrator in order to

demonstrate the PAK Lithium Deposits' potential to produce up to 2,000 tonnes Lithium Carbonate

Equivalent ("LCE") of premium spodumene concentrates for glass producers.

Frontier maintains a tight share structure with management ownership exceeding 30% of the

Company.

About the PAK Lithium Project

The PAK Lithium Project encompasses 26,774 hectares at the south end of

Ontario's

Electric

Avenue, which is the largest land package hosting lithium bearing pegmatites in

Ontario

. The Project

remains largely unexplored; however, it does host two premium spodumene bearing lithium deposits

located only 2.3 km of each other. Recently, Frontier confirmed the presence of spodumene with the

Pennock Lake pegmatite occurrence a further 30km along Frontier's PAK Lithium Project.

The PAK deposit has a mineral reserve in proven and probable category of 5.77 MT averaging 2%

Li

2

O has a rare technical/ceramic grade spodumene with low inherent iron (below 0.1% Fe

2

O

3

) as

per its NI 43-101 Technical Report, "Preliminary Feasibility Study" by Nordmin Engineering Ltd.,

disseminated on

April 16, 2018

.

The Spark pegmatite was initially discovered in

September 2018

. The pegmatite area has been

mapped with 1.9 hectares of exposed pegmatite. It has mineral resource estimate of 3.2 MT

averaging 1.59%Li

2

O in indicated and 12.2 MT averaging 1.36% Li

2

O in inferred category.

Additional information regarding Frontier Lithium is available on SEDAR at

sedar.com

under the

Company's profile and on its website at

frontierlithium.com

, including various pictures of ongoing

work at the project.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

SOURCE

Frontier Lithium Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/February2020/04/c8730.html

%SEDAR: 00008434E

For further information:

Bora Ugurgel, Manager, Investor Relations, 2736 Belisle Drive Val Caron,

ON. P3N 1B3 CANADA, T. +001 705.897.7622, F. +001 705.897.7618

CO: Frontier Lithium Inc.

CNW 16:30e 04-FEB-20