Frontier Lithium Confirms BOLT Pegmatite is up to 65 Metres Wide and Persists to at Least 220 Metres Below Surface and Provides Correction to Certain ''Restatement'
FRONTIER LITHIUM CONFIRMS BOLT
PEGMATITE IS UP TO 65 METRES WIDE AND
PERSISTS TO AT LEAST 220 METRES
BELOW SURFACE AND PROVIDES
CORRECTION TO CERTAIN ''RESTATEMENT'
DISCLOSURE IN JULY 28, 2023 PRESS
RELEASE
SUDBURY, ON
,
Sept. 7, 2023
/CNW/ - Frontier Lithium Inc. (TSXV: FL) (FRA: HL2) (OTCQX:
LITOF) ("Frontier" or "the Company"), one of
Ontario's
leading lithium exploration companies, is
pleased to announce results on the remaining holes drilled and recent channels cut on the Bolt
pegmatite, concluding the 2023 maiden drill program. Located between the Spark and PAK
spodumene-bearing lithium deposits, the Bolt pegmatite had only been mapped and channeled on
surface exposures up until this year.
Drill Highlights
DDH PL-122-23 extends the pegmatite zone down to a depth of 220 metres ("m") with a true
width of up to
65m
, intersecting
86.5m
of continuous pegmatite averaging 0.92% Li
2
O.
Including
7.0m
from 229.5 to
236.5m
averaging 1.27% Li
2
O
Including
10.0m
from 243.1 to
253.1m
averaging 1.40% Li
2
O
Including
26.1m
from 273.5 to
299.6m
averaging 1.39% Li
2
O
DDH PL-113-23 intersects two pegmatite zones
14.8m
and
22.1m
wide, averaging 1.38% and
1.39% Li
2
O, respectively.
Including
7.6m
from 98.0 to
105.5m
averaging 2.09% Li
2
O
Including
11.4m
from 216.8 to
228.2m
averaging 2.17% Li
2
O
DDH PL-115-23 intersects
21.6m
of continuous pegmatite averaging 1.94% Li
2
O
Including
6.3m
from 126.0 to
132.3m
averaging 2.50% Li
2
O
Including
5.6m
from 133.8 to
139.5m
averaging 2.32% Li
2
O
"We're pleased with the results of our maiden drill program on the Bolt Pegmatite," says
Garth
Drever
, VP Exploration of the Company. "Early assessments and consistent distribution of
mineralized pegmatite are promising, and continuity remains strong at depth, with a notable central
zone."
Drilling has confirmed that the Bolt pegmatite extends over
600m
along strike, with horizontal widths
of up to
75m
, and remains completely open at depth. The pegmatite appears to have a wide central
zone that extends at depth and begins to break up along the strike zone into pods of variable
thickness separated by the mafic volcanic and metasedimentary host rock. As previously reported,
PL-106-22, PL-107-22, and PL-108-22 suggest the continuity between the Bolt pegmatite and the
Spark deposit located
200m
to the northwest is in question. That continuity is however
undetermined and will require additional drilling as there may still be a connection between the
pegmatites further at depth.
Figure 1 is a plan-view map highlighting the Bolt area showing locations of the 2023 Phase XIII
drilling and includes the Bolt outcrop exposures. Drillhole traces displaying major lithological features
for all holes and surface channels plus lithium assay results that have been released.
Figure 1: Planview map of the Bolt-PAK area showing Recent results from the Bolt Drilling (CNW
Group/Frontier Lithium Inc.)
During the summer drill program, outcrop channeling and sampling was completed at various
locations across the PAK property including five more channels at Bolt as shown on Figure 1.
Table 1 details the drill holes and Channels with mineralized intersections at Bolt while Tables 2 and
3 respectively summarize all drill holes completed at Bolt and Spark and the channels completed at
Bolt in 2023. Information regarding the condemnation drilling and the hydrogeological-geomechanical
drilling completed was previously disclosed on
August 10,2023
.
Table 1: Summary of Drill Hole and Channel Intersections
DDH PL-105-23
Collared 16m N of PL-104-23, the hole was abandoned due to incorrect Azimuth
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Aplite Zone
23.5
42.1
18.6
0.47
0.006
36
56
60
0.18
Aplite
Li-Enriched
58.1
62.8
4.7
1.70
0.016
122
82
228
0.31
Aplite
Li-Enriched
69.7
93.2
23.5
1.65
0.008
90
75
60
0.26
Aplite
DDH PL-
106-23
Collared 75m NW of PL-103-23, the hole was fanned out towards the Spark deposit to test a connection to Bolt and to also intersect the northern extent of the Bolt
pegmatite. No significant mineralization was found. The Bolt pegmatite pinched out to a narrow 2.8m mineralized hit at 93.7m depth
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Li-
Enriched
67.5
71.3
3.8
1.17
0.005
96
96
36
0.11
Pegmatite + Aplite
Li-
Enriched
93.7
96.5
2.8
1.46
0.015
149
90
104
0.30
Aplite
Li-
Enriched
132.1
134.7
2.6
1.00
0.019
171
56
50
0.22
Aplite + Metasediments
DDH PL-
107-23
Collared in the same location as PL-106-23, the hole was fanned out towards the Spark deposit to test a connection to Bolt and to follow up on a pegmatite vein that
was mapped west of the main Bolt pegmatite. A 19.5m zone was intersected bearing Spark type mineralization that warrants follow up. The mineralization hit is more
likely to be related to Bolt rather than the Spark pegmatite.
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Li-
Enriched
71.0
90.5
19.5
1.31
0.006
87
77
58
0.18
Pegmatite + Aplite
Pegmatite
zone
97.6
105.9
8.4
0.76
0.008
96
112
68
0.24
Pegmatite + Aplite
DDH PL-108-
23
Collared 75m NW of PL-103-23, the hole was fanned out towards the Spark deposit to test a connection to Bolt. An 11.5m mineralized interval occurs from 66 to
77.5m.
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Li-Enriched
66.0
77.5
11.5
1.08
0.014
50
56
81
0.18
Pegmatite + Aplite
Aplite zone
168.5
173.5
5.0
0.29
0.002
49
64
53
0.08
Aplite
DDH PL-
113-23
Collared 65m to the SE of PL-112-23, the hole was stepped out down strike to intersect the pegmatite mapped on surface. A mafic raft has broken up the main Bolt
pegmatite. An unexpected Li-enriched zone was intersected at 96.9m
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Li-
Enriched
96.9
111.7
14.8
1.38
0.007
71
75
70
0.33
Aplite
including
98.0
105.5
7.6
2.09
0.007
52
38
48
0.35
Aplite
Aplite
Zone
191.3
193.5
2.1
1.02
0.004
77
85
50
0.18
Aplite
Li-
Enriched
211.9
234.0
22.1
1.39
0.010
91
85
54
0.22
Aplite + minor mafics + metaseds
including
216.8
228.2
11.4
2.17
0.010
142
137
75
0.33
Aplite + minor mafics + metaseds
DDH
PL-
114-23
Collared 85m to the SE of PL-113-23, the hole was stepped out down strike to confirm if the bolt pegmatite is pinching out and to follow up on pegmatite mapped on
surface. The hole confirmed results from PL-113 that the pegmatite is pinching out and being broken up by mafic + metasediment rafts
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Li-Enriched
132.6
136.1
3.5
1.06
0.012
46
59
56
0.20
Aplite
Aplite Zone
155.4
163.7
8.2
0.68
0.005
69
78
54
0.16
Aplite
including
160.8
163.7
2.9
1.41
0.007
71
78
65
0.23
Aplite
Li-Enriched
185.6
196.9
11.3
1.01
0.024
51
42
50
0.21
Aplite + minor metaseds
DDH PL-
115-23
Collared 93m to the SE of PL-114-23, the hole was stepped out down strike to confirm if the bolt pegmatite is pinching out and to follow up on pegmatite mapped on
surface. The hole confirms results from PL-112 and PL-113 that the pegmatite is pinching out and being broken up by mafic + metasediment rafts. A larger than
expected aplite zone was intersected at 123.86m which appears to correlate with surface mapping.
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Li-
Enriched
123.9
145.5
21.6
1.94
0.039
105
74
72
0.30
Aplite
including
126.0
132.3
6.3
2.50
0.038
99
57
92
0.27
Aplite
including
133.8
139.5
5.6
2.32
0.040
100
83
54
0.29
Aplite
including
140.0
144.4
4.4
2.46
0.048
111
51
49
0.37
Aplite
Aplite
Zone
157.5
160.7
3.2
0.64
0.004
76
86
63
0.18
Aplite
Aplite
Zone
174.5
179.0
4.6
0.46
0.008
58
93
67
0.16
Aplite
Aplite
Zone
200.0
205.8
5.8
0.83
0.016
59
44
48
0.15
Aplite + minor mafics + metaseds
DDH PL-
117-23
Collared 75m SE of PL-115-23, hole was stepped out along strike to follow up on a 21.6m interval intersected in PL-115 grading 1.9% Li
2
O. No significant mineralization
was intersected; hole confirms that the Bolt pegmatite has pinched out and is no longer open along strike.
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Aplite
Zone
117.9
119.3
1.4
1.05
0.008
47
50
57
0.26
Aplite
Aplite
Zone
195.7
197.8
2.1
0.98
0.006
62
73
45
0.13
Aplite
Aplite
Zone
209.7
212.0
2.3
0.08
0.005
45
78
44
0.12
Aplite
DDH PL-
122-23
Collared in the same location as PL-121-23, PL-122-23 was designed to follow up on the results of PL-111-23 and PL-112-23 to confirm mineralized pegmatite further
at depth. Results confirm that the main Bolt pegmatite extends down to approximately 220m in depth with a true width of 65m.
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Aplite
Zone
213.1
243.1
30.0
0.66
0.006
49
91
61
0.21
Aplite
including
229.5
236.5
7.0
1.27
0.009
53
104
70
0.30
Aplite
Pegmatite
Zone
243.1
299.6
56.5
1.05
0.007
56
97
67
0.23
Pegmatite w/ metasediments
including
243.1
253.1
10.0
1.40
0.006
45
91
61
0.22
Pegmatite w/ metasediments
including
273.5
299.6
26.1
1.39
0.009
67
89
63
0.23
Pegmatite w/ metasediments
Channel 57
Channeled in between PL-110-23 and PL-111-23, CH-57 was cut to confirm pegmatite grade and continuity at surface. Results correlate well with diamond
drill hole intersections at depth.
Site
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Bolt
Pegmatite
Zone
0.0
13.3
13.3
0.99
0.006
60
122
64
0.21
Pegmatite-Aplite
including
0.0
8.0
8.0
1.44
0.006
63
121
64
0.23
Pegmatite
Channel 58
Channeled 50m SE of CH-57 and above PL-111-23, CH-58 was cut to confirm pegmatite grade and continuity at surface. Results correlate well with diamond
drill hole intersections at depth indicating that there are low grade sections of pegmatite on the western end that fall well below cut off grade.
Site
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Bolt
Pegmatite
Zone
0.0
6.0
6.0
0.60
0.007
42
90
62
0.27
Pegmatite-Aplite
including
0.0
1.0
1.0
2.11
0.006
39
94
67
0.26
Pegmatite
Channel 59
Channeled 35m SE of CH-58 and above PL-122-23, CH-59 was cut to confirm pegmatite grade and continuity at surface. Results correlate well with diamond
drill hole intersections at depth indicating a higher grade zone in the central main portion of the Bolt pegmatite
Site
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Bolt
Pegmatite
Zone
0.0
11.0
11.0
1.76
0.008
66
85
59
0.24
Pegmatite-Aplite
including
2.0
5.0
3.0
2.38
0.008
63
75
52
0.23
Pegmatite-Aplite
Channel 60
Channeled 100m SE of CH-59 and above PL-113-23, was cut to confirm pegmatite grade and continuity at surface. Results indicate that southern limb on the
eastern end of the main Bolt pegmatite where the central zone begins to break up is wider at surface than at depth, relative to results from PL-113.
Site
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Bolt
Pegmatite
Zone
0.0
12.0
12.0
1.35
0.009
83
100
77
0.25
Pegmatite-Aplite
Channel 70
Channeled 60m W of the Bolt pegmatite, CH-70 was cut to confirm texture and grade continuity on an aplite outcrop. Results indicate that the outcrop contains little to
no spodumene mineralization, although further investigation of the area is required given the proximity to the Bolt pegmatite.
Site
Zone
From (m)
To (m)
Width (m)
Li
2
O (%)
Cs
2
O (%)
Ta
2
O
5
(ppm)
Nb
2
O
5
(ppm)
SnO
2
(ppm)
Rb
2
O (%)
Unit
Bolt
Aplite
Zone
0.0
5.9
5.9
0.10
0.004
52
119
81
0.24
Aplite
Table 2: Summary of 2023 Drilling at Bolt and Spark
DDHNo
Date Drilled
UTM Zone 15N (NAD83)
Collar Orient
Metres Drilled
Start
End
Easting
Northing
(mASL)
Azim
Dip
Start
End
Spark - Phase XIII
PL-100-23
2023-03-24
2023-03-26
472,612
5,829,280
326.0
345
-60
0
174.1
PL-101-23
2023-03-26
2023-03-28
472,567
5,829,280
326.5
346
-60
0
181.5
PL-102-23
2023-03-28
2023-03-30
472,512
5,829,260
327.0
347
-63
0
174.0
PL-133-23
2023-07-05
2023-07-14
472,443
5,829,345
327.0
346
-64
0
550.5
Total
1080.1
PL-103-23
1
2023-03-31
2023-04-02
473,126
5,829,159
344.0
41
-43
0
203.5
PL-104-23
1
2023-04-02
2023-04-03
473,096
5,829,215
340.6
45
-45
0
163.5
Bolt - Phase XIII
PL-105-23
2023-04-03
2023-04-04
473,101
5,829,230
340.0
45
45
0
135.0
PL-106-23
2023-04-04
2023-04-07
473,101
5,829,234
338.3
354
-44
0
360.0
PL-107-23
2023-04-08
2023-04-15
473,094
5,829,225
339.2
260
-43
0
282.0
PL-108-23
2023-04-11
2023-04-13
473,095
5,829,228
338.6
300
-45
0
246.0
PL-109-23
2
2023-04-16
2023-04-17
473,153
5,829,108
349.7
45
-45
0
213.0
PL-110-23
2
2023-04-18
2023-04-19
473,204
5,829,033
350.0
48
-45
0
211.5
PL-111-23
2
2023-04-20
2023-04-23
473,221
5,828,937
352.4
45
-45
0
330.0
PL-112-23
2
2023-04-23
2023-04-25
473,284
5,828,901
357.3
45
-46
0
248.0
PL-113-23
2023-04-25
2023-04-28
473,308
5,828,840
363.4
50
-45
0
270.0
PL-114-23
2023-04-28
2023-05-02
473,390
5,828,822
368.2
44
-46
0
320.0
PL-115-23
2023-05-02
2023-05-04
473,447
5,828,750
369.6
44
-45
0
255.0
PL-117-23
2023-05-08
2023-05-11
473,487
5,828,685
373.0
46
-44
0
250.4
PL-122-23
2023-05-26
2023-05-30
473,202
5,828,869
353.8
43
-49
0
317.7
Total
3805.6
Note 1: Results released in the Company's Press Release dated May 8, 2023
Note 2: Results released in the Company's Press Release dated August 10, 2023
Table 3: Summary of 2023 Channeling at Bolt
Channel
Date Sampled
UTM Zone 15N (NAD83)
Orientation
Metres Cut
Smp
Start Date
End Date
Easting
Northing
(mASL)
Azim
Dip
Start
End
Bolt
CH-57
2023-06-05
2023-06-05
473,291
5,829,067
336.6
220
21
0
13.32
15
CH-58
2023-06-11
2023-06-11
473,322
5,829,030
336.9
220
24.8
0
6
9
CH-59
2023-06-11
2023-06-11
473,354
5,829,016
334.0
220
19.66
0
11
11
CH-60
2023-06-12
2023-06-12
473,434
5,828,955
346.1
222
13
0
12
15
CH-70
2023-07-21
2023-07-21
473,091
5,829,132
346.7
53
-7
0
5.9
6
Totals
48.22
56
Correction to Certain 'Restatement' Disclosure in the 2023 Year End Financial
Results Press Release
The Company would like to clarify and correct certain disclosure provided in the Company's press
release disseminated on
July 28, 2023
("
July 28
Press Release
"). In the
July 28
Press Release,
the Company disclosed that the comparative financial figures in the 2023 annual financial statements
of the Company had been restated and that these restated comparative figures replaced and
superseded corresponding information contained in previously filed financial statements and
management's discussion and analysis of the Company, but this statement is incorrect and was
accidentally included in the
July 28
Press Release. As a correction and for clarity for the Company –
no such restatement of comparative financial figures was necessary and/or required and the
originally stated and applicable comparatives figures previously provided are to be relied upon.
Due Diligence
All scientific and technical information in this release has been reviewed and approved by
Garth Drever, P.Geo., the qualified person ("QP") under the definitions established by National
Instrument 43-101 -
Standards of Disclosure for Mineral Projects
. Under Frontier's QA/QC
procedures, all drilling was completed by Chenier Drilling Ltd. of
Val Caron, Ontario
using thin walled
BTW drill rods (4.2 cm core diameter) and a Reflex ACT III oriented core system. Using the Reflex
system, the drill core was oriented and marked as it was retrieved at the drill. The core was boxed
and delivered to the Frontier core shack where it was examined, geologically logged, and marked
for sampling. The core was photographed prior to sampling. Using a rock saw, the marked sample
intervals were halved with one-half bagged for analysis. Sample blanks along with lithium, rubidium
and cesium certified reference material was routinely inserted into the sample stream in accordance
with industry recommended practices. Field duplicate samples were also taken in accordance with
industry recommended practices. The samples were placed in poly sample bags and transported to
Red Lake, Ontario
by float plane and then shipped to AGAT Laboratories Ltd. (AGAT) in
Thunder
Bay, Ontario
for sample preparation and to
Mississauga, Ontario
for processing and quantitative
multi-element analysis. AGAT is an ISO accredited laboratory. The core is stored on site at the
Company's Pakeagama Lake exploration camp.
About Frontier Lithium
Frontier Lithium Inc. (TSX-V: FL) (FRA: HL2) (OTCQX: LITOF) is a preproduction business with an
objective to become an integrated strategic domestic supplier of spodumene concentrates for
industrial users as well as battery-grade lithium hydroxide and other chemicals to the growing
electric vehicle and energy storage markets in
North America
. The Company's sole project maintains
the largest land position and resource in a premium lithium mineral district located in
Ontario's
Great
Lakes region.
About the PAK Lithium Project
The PAK lithium project contains
North America's
highest-grade lithium resource and is the second
largest in
North America
by size. The project encompasses close to 27,000 hectares and remains
largely unexplored; however, since 2013, the company has delineated two premium spodumene-
bearing lithium deposits (PAK and Spark), located 2.3 kilometres apart. Exploration is continuing on
the project through two other spodumene- bearing discoveries: the Bolt pegmatite (located between
the PAK and Spark deposits), as well as the Pennock pegmatite (25 kilometres northwest of PAK
deposit within the project claims). A 2023 Pre-Feasibility Study "National Instrument 43-101
Technical Report PFS PAK Lithium Project" by BBA E&C Inc., delivered a 24- year project life,
delivering a post-tax NPV(8%) of
US$1.74 billion
and IRR of 24.1% as per the press release
disseminated on
May 31, 2023
, and was filed on Sedar.com.
Cautionary Note Regarding Forward-Looking Statements
This press release contains statements that constitute "forward-statements." Such forward looking
statements involve known and unknown risks, uncertainties and other factors that may cause the
Company's actual results, performance or achievements, or developments to differ materially from
the anticipated results, performance or achievements expressed or implied by such forward-looking
statements. Although the Company believes, in light of the experience of its officers and directors,
current conditions and expected future developments and other factors that have been considered
appropriate that the expectations reflected in this forward-looking information are reasonable, undue
reliance should not be placed on them because the Company can give no assurance that they will
prove to be correct. When used in this press release, the words "estimate", "project", "belief",
"anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words
or such variations thereon or comparable terminology are intended to identify forward-looking
statements and information. The forward-looking statements and information in this press release
include information relating to the prospectivity of the Company's mineral properties, the
mineralization and development of the Company's mineral properties, the Company's exploration
program and other mining projects and prospects thereof. Such statements and information reflect
the current view of the Company. Risks and uncertainties that may cause actual results to differ
materially from those contemplated in those forward-looking statements and information. By their
nature, forward-looking statements involve known and unknown risks, uncertainties and other factors
which may cause our actual results, performance or achievements, or other future events, to be
materially different from any future results, performance or achievements expressed or implied by
such forward-looking statements. The forward-looking information contained in this news release
represents the expectations of the Company as of the date of this news release and, accordingly, is
subject to change after such date. Readers should not place undue importance on forward-looking
information and should not rely upon this information as of any other date. The Company undertakes
no obligation to update these forward-looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change.
Readers are cautioned that any such forward-looking statements are not guarantees of future
performance and those actual results or developments may differ materially from those projected in
the forward-looking statements. For more information on the Company, please review the
Company's public filings available on SEDAR+ at www.sedarplus.com.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is
defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy
or accuracy of this news release.
SOURCE
Frontier Lithium Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/September2023/07/c0376.html
%SEDAR: 00008434E
For further information:
Company Contact Information: Bora Ugurgel, Senior Manager, Investor
Relations, 2736 Belisle Drive Val Caron, ON. P3N 1B3 CANADA, T. +001 705.897.7622, F. +001
705.897.7618
CO: Frontier Lithium Inc.
CNW 17:00e 07-SEP-23