Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FL.V ·

Frontier Lithium Commences Phase X Drilling

Exploration Programs

Frontier Lithium Commences Phase X Drilling

Highlights:

Current diamond drill program of 2,000 meters on the PAK Lithium Project being conducted.

In-fill drilling objective is to upgrade the Company's Mineral Resources on the Spark deposit

from Inferred to Indicated classification in advance of a Preliminary Feasibility Study.

SUDBURY, ON,

Oct. 6, 2021

/CNW/ - Frontier Lithium Inc. (TSXV: FL) (US OTC: LITOF) (FSE:

HL2) ("Frontier" or "the Company") is pleased to announce the commencement of the Phase X,

2,000 meter diamond drill program on its PAK Lithium Project which is comprised of the PAK and

Spark deposits and is located in the Red Lake mining district of northwestern Ontario. The program

is designed to upgrade the Spark deposit's current Inferred Resource of 15.7 million metric tonnes

to a higher level of confidence of Measured and Indicated category with additional potential to also

expand the resource.

The Company plans to publish a Mineral Resource estimate update for the Spark Resource in Q1

2022 in support of reporting Ore Reserves and completion for completion of a Preliminary Feasibility

Study in mid-2022.

Trevor Walker

, President and CEO of Frontier Lithium said, "We are excited and confident on the

ability to upgrade the Spark deposit's 15.7 MT inferred resource to Measured and Indicated in the

near future. With success, a material increase to the total resource base on the PAK Project will

enable revaluation and further strengthening of our share price and value." Mr. Walker added, "The

Electric Avenue, within which the PAK Project is located, is growing to become one of the worlds'

Tier I spodumene resource districts and is poised to contribute to

North America's

clean energy

storage and electric vehicle transition."

Diamond Drilling on the Spark deposit. (CNW Group/Frontier Lithium Inc.)

Figure 1:

Diamond Drilling

on the Spark deposit,

October 4, 2021

The Spark pegmatite was initially discovered in

September 2018

. Subsequent surface channel

sampling and drilling led to resource estimate including 3.2 million tonnes in indicated and 15.7 million

tonnes in the inferred categories reported in the PEA on

February 16, 2021

. The Spark deposit has

a large surface exposure, broad mineralized zones and remains open in all directions, with the most

significant upside at depth. Recent 2021 in-fill drilling highlights include PL-046-21 intersected

320.6m

of pegmatite averaging 1.68% Li

2

0 and PL-048-21 intersected

340.7m

of pegmatite

averaging 1.68% Li

2

O.

Other Matters

The Company also announces that pursuant to its "Stock Option Plan" it has granted 100,000 stock

options, to certain employees, officers, directors, and strategic advisors. The options are set for a

period of five years, expiring on

October 5, 2026

. The options are priced at

$.84

and are subject to

regulatory approval.

About Frontier Lithium

Frontier Lithium (TSX.V: FL) (OTCQX: LITOF) (FSE: HL2) is a pure play lithium company with the

largest land position in the Electric Avenue, an emerging premium lithium mineral district located in

northern

Ontario

. The company maintains 100% ownership in the PAK Lithium Project which contains

one of

North America's

highest-grade, large tonnage hard-rock lithium resources in the form of a

rare low-iron spodumene. The Project has significant upside exploration potential. Frontier is a pre-

production business that is targeting the manufacturing of battery quality lithium hydroxide to support

electric vehicle and battery supply chains in

North America

. Frontier maintains a tight share structure

with management ownership at approximately 25% of the Company.

About the PAK Lithium Project

The PAK Lithium Project encompasses 26,774 hectares at the south end of

Ontario's

Electric

Avenue, the largest land package hosting premium lithium bearing pegmatites in

Ontario

. The Project

covers 65 km of the Avenue length and remains largely unexplored; however, since 2013 the

company has delineated two premium spodumene bearing lithium deposits (Pak and Spark) located

2.3 km from each other. A 2021 Preliminary Economic Assessment of a fully-integrated lithium

operation utilizing spodumene concentrate generated from the PAK Lithium Project resource to

achieve downstream conversion for production of battery-quality lithium chemicals (NI 43-101

Technical report titled "PAK Property" by BBA Engineering Ltd. issued on

April 5, 2021

) resulted in a

post-tax NPV8% of USD

$974M

with a 21% IRR. Considerable exploration upside is supported on

the PAK Lithium Project through two other spodumene bearing discoveries; Bolt pegmatite located

between PAK and Spark deposits, as well as Pennock pegmatite, a further 30 km northwest of PAK

within the Project claims.

Forward-looking statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release. This release includes certain statements that may be deemed "forward-looking

statements". All statements in this release, other than statements of historical facts, that address

future production, reserve potential, exploration drilling, exploitation activities and events or

developments that the Company expects are forward-looking statements. Although the Company

believes the expectations expressed in such forward-looking statements are based on reasonable

assumptions, such statements are not guarantees of future performance and actual results or

developments may differ materially from those in the forward-looking statements. Factors that could

cause actual results to differ materially from those in forward looking statements include market

prices, exploitation and exploration successes, continued availability of capital and financing, and

general economic, market or business conditions. Investors are cautioned that any such statements

are not guarantees of future performance and those actual results or developments may differ

materially from those projected in the forward-looking statements. For more information on the

Company, Investors should review the Company's registered filings what are available at

https://www.sedar.com

SOURCE

Frontier Lithium Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2021/06/c4874.html

%SEDAR: 00008434E

For further information:

Company Contact Information: Bora Ugurgel, Manager, Investor

Relations, 2736 Belisle Drive Val Caron, ON. P3N 1B3 CANADA, T. +001 705.897.7622, F. +001

705.897.7618

CO: Frontier Lithium Inc.

CNW 08:00e 06-OCT-21