Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FIN.V ·

Grit Metals Corp. Reports High Grade Lithium Assay Results from Multiple New Pegmatite Targets in Central Finland

Drill Results

Grit Metals Corp. Reports High Grade Lithium

Assay Results from Multiple New Pegmatite

Targets in Central Finland

Vancouver, British Columbia--(Newsfile Corp. - November 12, 2024) - Grit Metals Corp. (TSXV: FIN)

(FSE: K9T) ("Grit Metals" or the "

Company

") is pleased to report impressive assay results from several

newly identified areas of Lithium-Cesium-Tantalum (LCT) pegmatite mineralization on its exploration

licenses at its Central Finland Lithium Project.

Key Takeaways:

Multiple new spodumene-bearing LCT-type pegmatite boulder clusters and trends have been

identified and sampled during the summer 2024 campaign

A total of 600 rock chip grab samples were collected and submitted to ALS Laboratories for

assaying; assays are pending for approximately 150 samples

Pegmatite boulder trains individually traced over several hundred metres

Jylhä North

: 34 large boulders up to 3 m diameter with visible spodumene discovered

over 700 m distance assayed from 0.01% to 2.80% Li

2

O, averaging 0.86% Li

2

O (Li

2

O =

lithium oxide)

Mōrkylā

: 15 large boulders up to 4 m diameter with visible spodumene discovered over

a275 distance assayed from 0.004% to 2.46% Li

2

O, ave raging 0.54% Li

2

O

Five new Exploration License (ELs) applications totaling 10,220 hectares (ha) were recently

submitted bringing the Company's total holdings to 15,770 ha (see Aug 15, 2024 press release)

New ELs largely contiguous with Keliber's licenses and within 1 km of known lithium pegmatite

deposits and the Keliber Spodumene Concentrator

Prospecting and boulder sampling to continued until the end of October

Figure 1. The Finland Lithium Pegmatite Project - New Spodumene Mineralization

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9006/229524_fig1gritmetals.jpg

Jylhä and Tastula Prospects

The new Jylhä and Tastula ELs are contiguous with the western boundary of Keliber's ELs.

Spodumene-

bearing LCT-type pegmatite boulders have been identified in multiple clusters and/or trends over a total

distance of 12.5 km.

The Jylhä North prospect comprises a > 700m long East-Northeast trend comprised of of 34

spodumene-bearing pegmatite boulders of which 22 contain visible spodumene.

Individual boulders

range in size from 10s of cms to over 3 m in diameter.

The boulders assayed 0.01% to 2.80% Li

2

O,

averaging 0.86% Li

2

O.

The boulder trend is parallel to interpreted geological and coincident geophysical

signatures and is also one of the preferred orientations of the LCT deposits in the Kaustinen region (For

example the Outovesi Deposit).

This occurrence is situated approximately 1 km south-southeast of Keliber's Emmes Lithium Pegmatite

deposit which comprises 1.08 million tonnes grading 1.22% Li

2

O.

Figure 2. Jylhä North Prospect

Jylhä

discovery boulder (left); spodumene crystals in same boulder (right); assayed 2.33% Li

2

O

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9006/229524_fig2gritmetals.jpg

The Mōrkylā Prospect, which lies approximately 1.5 km west of Keliber's Levikangas Lithium Pegmatite

deposit (0.47 million tonnes grading 1.00% Li

2

O), is a 275 long Northwst-Southeast trend of 15 large

boulders and blocks of spodumene-bearing pegmatite.

Individual boulders are over 4 m in diameter and

contain course visible spodumene (see Figure 2) The boulders assayed from 0.004% to 2.46% Li

2

O,

averaging 0.54% Li

2

O.

Figure 3. Mōorkylā Prospect

Mōorkylā discovery boulder (left); spodumene crystals in same boulder (right); assayed 2.46% Li

2

O

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/9006/229524_fig3gritmetals.jpg

Tastula Prospects

Three separate clusters of spodumene -bearing LCT pegmatite boulders were identified during initial

reconnaissance prospecting.

These occur over an approximate 2 km by 4 km area with individual

boulders being over 1.5 m in diameter. Thirty-two pegmatite boulders were sampled across the EL

assaying 0.0004% to 1.59% Li

2

O with five samples assaying >0.30% Li

2

O.

Nabba Prospects

The highlight of 2023 was the discovery of the Kyrola prospect on the Nabba EL, where an 850 m by 110

m spodumene-bearing boulder field was discovered, comprised of 49 rock chip grab samples assaying

from 0.003% to 3.84% Li

2

O Li

2

O, with 15 of the 49 samples returning assays in excess of 0.50% Li

2

O.

Prospecting at Nabba in 2024 has identified new spodumene bearing LCT pegmatites mineralization in

multiple areas.

One of which was located 2.3 km west of Kyrola within an LCT pegmatite boulder cluster,

with three boulders containing course visible spodumene.

Two boulders assayed 1.60% and 0.14%

Li

2

O respectively

Another was 6 km northwest of Kyrola, where follow-up prospecting of a boulder that assayed 0.36%

Li

2

O in 2023, which outlined LCT boulders with trace spodumene observed locally over a distance of

>1.2 km.

Only weakly anomalous Li assays are reported.

Discussion

The Company's projects are in the Kaustinen-Seinajoki region, which is highly prospective for LCT

pegmatite deposits, as evidenced by the success of the Geological Survey of Finland (GTK) and

subsequently Keliber Oy in discovering significant Li-bearing spodumene pegmatite prospects and

deposits in the region. The Company's success in identifying widespread spodumene-rich LCT

pegmatitic boulders is very encouraging, as the area is topographically flat and extensively covered by a

thin veneer of glacial overburden.

It is important to note that all the significant deposit and prospect discoveries (with one exception) in the

belt were found by tracing boulders back to source and identifying the source ultimately through drilling.

The GTK/Keliber Oy discoveries demonstrate that boulders are generally located within 300 - 500 m of

their source suggests excellent potential for discovery on the Company's licenses.

Grit Metals Corp. cautions investors grab samples are selective samples by their nature and are not

necessarily indicative of mineralization on the property. The Company further cautions the presence of

lithium mineralization on Keliber Oy's properties is not necessarily indicative of similar mineralization on

the Company's mineral reservations.

"Through multiple phases of exploration our team continues to discover new, highly prospective areas of

LCT mineralization which has led to a tripling of our project size," commented Jeremy Poirier, CEO of

Grit Metals Corp. This is a testament to the strength of our exploration team in their ability to discover the

expressions and ultimately the source of these lithium rich deposits. Our exploration program remains

fully-funded and continued until the end of October.

The company will review all assays and determine

next steps. Including the selection of multiple drill targets."

QA/QC Statement

Samples were submitted to ALS Laboratories in Sodankyla Finland. ALS inserted internal standards,

blanks and pulp duplicates within each sample batch as part of their own internal monitoring of quality

control protocols. Grit Metals Corp. monitors precision and bias performance by inserting certified

lithium standards (CDN-LI-01 and GTA-05) as well as blanks into each batch submitted to ALS at a rate

of 1:20.

The major element oxides and trace elements including Li, Cs, Ta and Be were analysed by ALS

analytical package ME-MS89L involving digestion by Na2O2 fusion followed by ALS's super trace ICP-

MS methodology. QAQC results to date do not indicate any analytical accuracy issues with all standards

returning values Li values within 3 standard deviations of their certified mean and blanks returning

expected values.

Mike Basha, P.Eng., P.Geo. (NL), VP Exploration of Grit Metals Corp., a Qualified Person as defined by

National Instrument 43-101, has prepared this press release and compiled the results discussed herein.

About Grit Metals Corp.

Grit Metals Corp. is a junior mining company currently focused on the Lithium-Cesium-Tantalum Finnish

Pegmatite Project in central Finland. Governing bodies in Europe and Finland are legislating

environmentally friendly and energy independent laws and policies. One of the key components is

access to REE and, specifically, lithium. The company's exploration licenses are located within 1 kms of

the Keliber mine and production complex, currently under construction and expected to begin production

in H2 2025.

An estimated €600 million investment by Keliber's parent company Sibanye-Stillwater Limited

(NYSE

:

SBSW) in partnership with the Finnish Minerals Group (

www.mineralsgroup.fi

) is underway in the

Kautinen Region and will see the development of open-pit and underground mining from several

deposits, construction of a central spodumene concentrator plant and a lithium hydroxide chemical plant

at tidewater in Kokkola.

When completed, this complex will comprise a complete hard-rock spodumene

pegmatite lithium supply chain (source:

www.sibanyestillwater.com

).

The Company also has several 100 percent owned precious metals projects in Northern Finland. They

are located in the Paleo-Proterozoic Greenstone Terrane of Northern Finland comprised of multiple

greenstone belts including the CLGB which hosts world-class gold (eg Kittila Deposit, owned by Agnico

Eagle and Ikkari Deposit, owned by Rupert Resources) and base metal deposits (eg Kevitsa owned by

Boliden and Sakatti owned by Aglo-American). The belt's potential is also suggested by the presence of

several major mining companies in the belt. The belt has very recently garnered significant interest

following an offer from Rupert Resources to buy B2Gold's 70% interest in a Joint Venture between

B2Gold and Aurion Resources which lies adjacent to Ruperts Ikkari Deposit, for $102 million. The joint

venture ground is strategic to Ruperts proposed development of the Ikkari Deposit but is also host to

numerous gold prospects along a structural corridor that extends >125 km.

FOR FURTHER INFORMATION PLEASE CONTACT:

Jeremy Poirier, CEO

Telephone: 604-722-9842

Email:

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Statements Regarding Forward Looking Information

This news release contains forward-looking information within the meaning of applicable securities

legislation. Forward-looking information is typically identified by words such as: believe, expect,

anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature,

refer to future events. Such statements include, without limitation, statements regarding the future

results of operations, performance and achievements of the Company, including the presence of

lithium mineralization at, and

the

exploration and development potential of, the Finland Pegmatite

Project. Although the Company believes that such statements are reasonable, it can give no

assurances that such expectations will prove to be correct.

All such forward-looking information is

based on certain assumptions and analyses made by the Company in light of their experience and

perception of historical trends, current conditions and expected future developments, as well as other

factors management believes are appropriate in the circumstances. This information, however, is

subject to a variety of risks and uncertainties and other factors that could cause actual events or

results to differ materially from those projected in the forward-looking information. Important factors

that could cause actual results to differ from this forward-looking information include the costs of any

anticipated work programs and the ability to fund such costs, required approvals in connection with

any work programs and the ability to obtain such approvals, risks inherent in exploration as well as

those described under the heading "Risks and Uncertainties" in the Company's most recently filed

MD&A. The Company does not intend, and expressly disclaims any obligation to, update or revise

the forward-looking information contained in this news release, except as required by law. Readers are

cautioned not to place undue reliance on forward-looking information.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/229524