Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

FFU.V ·

F4 Begins Search for Radioactive Boulders at Todd and Wales Lake First High-Resolution Airborne Radiometric Survey Over Both Projects

Corporate Updates

F4 Begins Search for Radioactive Boulders at

Todd and Wales Lake

First High-Resolution Airborne Radiometric Survey Over Both

Projects

Kelowna, British Columbia--(Newsfile Corp. - August 4, 2026) -

F4 Uranium Corp

.

(TSXV: FFU)

(OTCQB: FFUCF)

("

F4

" or the "

Company

") is pleased to announce the commencement of the first-

ever high-resolution airborne radiometric survey flown over its 100%-owned Todd Lake and Wales Lake

Projects in the southwestern Athabasca Basin region of Saskatchewan. The objective is to locate

radioactive boulders or boulder trains at surface - the exact exploration approach that led to the

discovery of the Patterson Lake South mineralized boulder train and, ultimately, Paladin Energy's Triple

R Deposit, 13 km east of the Todd Lake Property.

The survey will be completed by RAMP Geological Services Inc. using its proprietary helicopter-borne

RAMP-HD radiometric system and will cover approximately 3,850 line kilometres across the two

projects.

The survey is carefully configured to identify any radiometric anomalies that may correspond to

radioactive and ultimately uranium-bearing boulders on or near surface. Throughout the Athabasca

Basin, radioactive boulders have proven to be valuable exploration vectors that can point toward

previously undiscovered uranium mineralization. The most relevant and latest example is the discovery of

Paladin Energy's Triple R uranium deposit located approximately 13 km east of the Todd Lake Property.

In 2009, an airborne radiometric spectrometer survey flown by joint venture partners Fission Energy

Corp. and ESO Uranium Corp. (later Alpha Minerals Inc.), whose Patterson Lake South interests are

now held by Paladin Energy, identified numerous radiometric anomalies, and ground follow-up

prospecting ultimately confirmed them to be a field of high-grade uranium-bearing glacial boulders (see

Feasibility Study, NI 43-101 Technical Report, for PLS Property, 2023). The discovery of the radioactive

boulder field in the Patterson Lake area prompted extensive follow-up exploration including geophysics

and glacial interpretation, which ultimately led to the discovery of the Triple R uranium deposit.

F4 believes similarly transported boulders may exist on its Todd and Wales Lake properties, and that

locating any new boulders or boulder trains could provide an important exploration vector towards

uranium mineralization at source. The Todd and Wales Lake Projects occupy a highly prospective

position immediately west of several of the Athabasca Basin's most significant recent uranium

discoveries - NexGen Energy's Arrow Deposit and Paladin Energy's Triple R Deposit - as well as new

discoveries including NexGen Energy's PCE and Paladin Energy's Saloon and Atlas. The Patterson

Lake Corridor, which hosts the Arrow and Triple R Deposits, is interpreted to project toward the Todd

Lake Property and may continue toward Wales Lake (see news release dated June 2, 2026).

Following completion of the airborne survey, F4 intends to integrate the radiometric results with existing

geomorphological datasets to prioritize targets for ground follow-up. Initially a ground prospecting

program will follow, with crews using hand-held gamma-ray spectrometers to investigate any radiometric

hot spots identified by the survey and to confirm and sample uranium-bearing boulders.

Erik Sehn, P.Geo., Vice President Exploration, commented:

"

Tracing radioactive boulders back to their source is one of the oldest tricks in Athabasca exploration,

and is just as relevant today. Key Lake, a high-grade uranium mine on the southeastern rim of the

Athabasca Basin, began with pitchblende boulders in glacial debris that were followed back up-ice to

the ore body, and Patterson Lake South was found the same way four decades later. Airborne

radiometrics has never been flown over Todd or Wales Lake, so we are looking at this ground properly

for the first time and it sits immediately west of the Patterson Lake Corridor and the parallel Saloon

Trend. Both projects sit just outside the edge of the Athabasca Basin, where prospective basement

rock lies directly beneath glacial overburden rather than under hundreds of metres of sandstone

cover, so mineralization at the top of bedrock can be plucked up by the ice and dispersed as boulders.

If uranium-bearing boulders are sitting out there, this survey is how we find them - and every boulder

gives us a trail to follow back to source."

Figure 1. Map of airborne radiometric survey coverage on the Todd Lake and Wales Lake

Projects.

Source of radioactive boulder field outline (purple): digitized by F4 Uranium from

"Feasibility Study, NI 43-101 Technical Report, for PLS Property", effective date January 17, 2023,

prepared for Fission Uranium Corp. under NI 43-101 and filed on SEDAR+.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10832/307694_25c34a2dc4d0c819_002full.jpg

Appointment of Sonia Graham as Chief Financial Officer

The Company is also pleased to announce the appointment of Sonia Graham as Chief Financial Officer

of the Company effective August 1, 2026. Ms. Graham brings more than 20 years of senior finance

leadership experience in financial reporting, corporate governance, capital markets, and regulatory

compliance, including extensive experience with SEC, Nasdaq, Toronto Stock Exchange, and TSX

Venture Exchange reporting. Throughout her career, she has led public company financial reporting,

supported initial public offerings, and overseen external audits and securities compliance. She played a

pivotal role in Xenon Pharmaceuticals' (NASDAQ: XENE) initial public offering, serving as the

designated Principal Accounting Officer and leading the preparation and execution of the company's

initial SEC Form S-1 registration statements.

Ms. Graham replaces the Company's outgoing Chief Financial Officer, Jeremy Polmear, who resigned

from his position effective August 1, 2026.

Raymond Ashley, P.Geo, Chief Executive Officer of the Company, commented:

"

We welcome Sonia, who's proven track record of scaling businesses makes for a powerful addition to

our leadership team as we execute our growth strategy.

Mr. Polmear was a key contributor in the plan

of arrangement which formed F4 and in its listing on the TSX Venture Exchange. On behalf of the

Company's Board of Directors, we wish Jeremy all the best in his future endeavors and thank him for

his service, especially during the Company's inception

."

In connection with her appointment, the Company has granted 325,000 restricted share units ("

RSUs

")

of the Company to Ms. Graham in accordance with the Company's fixed equity incentive plan (the

"

Plan

").

Each RSU entitles Ms. Graham to receive one common share of the Company following the

vesting period of the RSUs. The RSUs awarded will vest as to one-third on each of the first, second and

third anniversaries of the date of grant.

Further information regarding the Plan can be found in the management information circular of the

Company dated Match 16, 2026 prepared for the Company's annual general meeting of shareholders

held on April 16, 2026, a copy of which is available under the Company's

profile on SEDAR+ at

www.sedarplus.ca

.

About the Wales Lake Project:

F4 Uranium's 40,113-hectare Wales Lake Project consists of the Wales Lake East and Wales Lake

West properties, both 100% owned, permitted and drill ready with strong airborne and ground conductor

targets. Significantly underexplored with only two historic drillholes, the Wales Lake Project is located

just outside the southwestern Athabasca Basin, within 25 km of Paladin's Triple R and NexGen Energy's

Arrow deposits. A series of recent discoveries including F3 Uranium's JR and Tetra Zones, NexGen

Energy's PCE occurrence, and Paladin Energy's Saloon area further highlights the uranium discovery

potential near the southwestern Athabasca Basin.

Wales Lake is accessed by Provincial Highway 955, which transects the property.

About the Todd Lake Project:

F4 Uranium's 100% owned Todd Lake Project is located approximately 13 km southwest of Paladin's

Triple R and NexGen Energy's Arrow deposits and lies along trend of the Patterson Lake Corridor, which

hosts the aforementioned deposits. Significantly underexplored with no historic drilling, the Todd Lake

Project is located just outside the southwestern Athabasca Basin. A series of recent discoveries

including NexGen Energy's PCE occurrence, Paladin Energy's Saloon area and F3 Uranium's JR and

Tetra Zones, the latter located just 4 km northeast of the top of Todd Lake, further highlights the uranium

discovery potential near the southwestern Athabasca Basin. Todd Lake is accessed by Provincial

Highway 955, located to the east of the property.

Qualified Person

The technical information in this news release has been reviewed and approved on behalf of the

Company by Sam Hartmann, P.Geo., President & Chief Operating Officer of F4, and a qualified person

as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

This news release also refers to neighbouring properties in which F4 Uranium has no interest, and the

Qualified Person has been unable to verify the information from those properties. Mineralization on those

neighbouring properties is not necessarily indicative of mineralization on the Todd or Wales Lake

Project. For additional information on the Wales Lake Project, please refer to the reports titled

"Technical Report for the Wales Lake West Property, Northern Saskatchewan, Canada" dated February

3, 2025 and "Technical Report for the Wales Lake East Property, Northern Saskatchewan, Canada"

dated May 12, 2025, both available at

www.sedarplus.ca

, and prepared in accordance with NI 43-101.

About F4 Uranium Corp:

F4 Uranium is a Canadian uranium exploration company focused on the Athabasca Basin in northern

Saskatchewan, led by the management and exploration team behind multiple uranium discoveries in the

Basin, including most recently Patterson Lake North and Broach Lake. The project portfolio comprises

17 wholly owned properties totalling approximately 157,000 hectares, several of which sit near

established uranium deposits including Paladin's Triple R, NexGen Energy's Arrow and IsoEnergy's

Hurricane. The assets were spun out of F3 Uranium in 2024. F4's exploration program is split between

the west and east sides of the Athabasca Basin, with the Company operating as both an explorer and

project generator providing investors early-stage exposure to the Basin.

Contact Information

F4 Uranium Corp.

750-1620 Dickson Avenue

Kelowna, BC V1Y 9Y2

Investor Relations

Telephone: 778 484 8030

Email:

[email protected]

ON BEHALF OF THE BOARD,

"Ray Ashley"

Raymond Ashley, CEO

F4 Uranium Corp.

Forward-Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable

securities laws. All statements that are not historical facts, including without limitation, statements

regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions,

expectations or beliefs of future performance, including statements regarding the suitability of the

Properties for mining exploration, future payments, issuance of shares and work commitment funds

under the existing option agreement, and completion of the planned exploration program, are "forward-

looking statements". These forward-looking statements reflect the expectations or beliefs of

management of the Company based on information currently available to it. Forward-looking statements

are subject to a number of risks and uncertainties, including those detailed from time to time in filings

made by the Company with securities regulatory authorities, which may cause actual outcomes to differ

materially from those discussed in the forward-looking statements. These factors should be considered

carefully, and readers are cautioned not to place undue reliance on such forward-looking statements.

The forward-looking statements and information contained in this news release are made as of the date

hereof and the Company undertakes no obligation to update publicly or revise any forward-looking

statements or information, whether as a result of new information, future events or otherwise, unless so

required by applicable securities laws.

The TSX Venture Exchange has not reviewed, approved or disapproved the contents of this press

release, and does not accept responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/307694