Airborne MT Points to Patterson Lake Corridor at Todd Lake First Work Completed by F4 on the Flagship Todd Lake Property
Airborne MT Points to Patterson Lake Corridor
at Todd Lake
First Work Completed by F4 on the Flagship Todd Lake
Property
Kelowna, British Columbia--(Newsfile Corp. - December 15, 2025) -
F4 Uranium Corp
(
TSXV: FFU
)
("
F4
" or "
the Company
") is pleased to announce that it has completed an airborne Mobile
MagnetoTellurics (Mobile MT) survey over the southern portion of its Todd Lake Project, located in the
southwestern Athabasca Basin. The survey identified possible extensions to the Patterson Lake
Corridor (PLC) and the Carter Trends, within the Clearwater Domain. The PLC is a prolific conductive
corridor which hosts both NexGen Energy's Arrow (20km east) and Paladin's Triple R deposits (14km to
the east).
The survey was carried out by Expert Geophysics Surveys Inc. and was designed to complete total
coverage on the entire property, with the northern half of the property having been flown in the summer of
2023 (Fig 1). The survey was designed to identify potential conductive systems representing the
continuation or extensions of the PLC which trends toward the property (Fig 1).
The results of this survey will be used to advance the understanding of the property and develop new
targets for future ground geophysical surveys and drill programs on the Todd Lake Project. The Todd
Lake Project has never been drill tested, despite its proximity to Triple R and Arrow deposit and being
located just 4km southwest of one of the Athabasca basins' newest discoveries, F3 Uranium's Tetra
Zone. The Todd Lake Project, along with Clearwater West and the Wales Lake Projects highlight F3's
western Athabasca portfolio in an immerging uranium district in the western Athabasca basin.
Erik Sehn, Vice President Exploration, commented:
"F4 is pleased to have completed its first work on our westside flagship Todd Lake Project, located
along trend of the prolific Patterson Lake Corridor and with no historic drilling to date. The results of the
survey highlight resistivity low trends on the southern portion of the property that lie along the interpreted
strike of the PLC. With F3 Uranium's recent Tetra Zone discovery being hosted within the Clearwater
Domain, only 4 km north of Todd Lake, it is now demonstrated that the Clearwater Domain is capable of
hosting high-grade uranium mineralization. These results reinforce F4's view that the Todd Lake Project
holds strong exploration potential in what we think is amongst the most fertile areas in the region. The
next steps will be to refine these results with targeted ground geophysical surveys to develop and
prioritize drill targets for a maiden drill program on the property."
Figure 1. Todd Lake's Current and Planned Mobile MT coverage.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10832/278010_fa98000364be3828_002full.jpg
About Todd Lake:
F4 Uranium's 100% owned Todd Lake Project is located 14km Southwest of Paladin's Triple R and
Nexgen Energy's Arrow deposits and lies along trend of the Patterson Lake corridor which hosts the
aforementioned deposits. Significantly underexplored with no historic drilling, the Todd Lake Project is
located just outside of the Southwestern Athabasca Basin. A series of recent discoveries including
Nexgen Energy's PCE occurrence, Paladin Energy's Saloon area and F3 Uranium's JR and Tetra
Zones, the latter located just 4km Northeast of the top of Todd Lake, further highlight the uranium
discovery potential near the Southwestern Athabasca Basin. Todd Lake is accessed by Provincial
Highway 955, located to the east of the property.
Qualified Person
The technical information in this news release has been reviewed and approved on behalf of the
Company by Sam Hartmann, P.Geo., President & Chief Operation Officer of F4, and a qualified person
as defined by National Instrument 43-101 -
Standards of Disclosure for Mineral Projects
.
This news release also refers to neighboring properties in which F4 Uranium has no interest, and the
Qualified Person has been unable to verify the information from those properties. Mineralization on those
neighboring properties is not necessarily indicative of mineralization on the Todd Lake Property.
Corporate Update
The Company also wishes to update its release of November 19, 2025 and note that it has settled a total
of $272,916 in debt to certain creditors revised from the $280,306 as approved by shareholders at its
annual meeting. Shares for Debt were issued to the following insiders - Devinder Randhawa, Director to
settle $109,200 of debt for 992,727 shares - Raymond Ashley CEO to settle $71,736 for 652,145
shares: Jeremy Polmear, CFO to settle $33,180 for 301,636 shares; and Sam Hartman, President and
COO to settle $58,800 for 534,545 shares.
The issuance of the 2,481,053 shares constitutes a "related party transaction" under
Multilateral
Instrument 61-101 - Protection of Minority Security Holders in Special Transactions
("
MI 61-101
"). The
Company further confirms that disinterested
Shareholder approval of the transaction was given,
Settlement by Insiders does not exceed 25% of the fair market value of the Company's market
capitalization.
No new control person was created as a result of the Shares-for-Debt Transaction.
Following this clarification the Company is pleased to announce that the TSX Venture Exchange (the
"Exchange") has approved the Settlement as noted above.
About F4 Uranium Corp:
F4 Uranium is a Canadian uranium exploration company focused on the Athabasca Basin in northern
Saskatchewan, and the latest uranium explorer, lead by the same management and exploration team
with a legacy of discovery successes. The project portfolio includes 17 wholly owned properties totaling
roughly 157,000 ha, many of which are near uranium deposits including Paladin's Triple R,
Nexgen
Energy's Arrow and IsoEnergy's Hurricane projects. The assets were spun out of F3 Uranium in 2024,
where the technical and management team made their third, and more recently fourth uranium
discoveries at Patterson Lake North and Broach Lake. F4's core focus will be split between the west
and east sides of the Athabasca Basin as the company is establishing itself as an explorer and project
generator providing shareholders renewed exposure at an early stage.
Contact Information
F4 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2
Investor Relations
Telephone: 778 484 8030
Email:
ON BEHALF OF THE BOARD,
"Ray Ashley"
Raymond Ashley, CEO
F4 Uranium Corp.
Forward-Looking Statements
This news release contains certain forward-looking statements within the meaning of applicable
securities laws. All statements that are not historical facts, including without limitation, statements
regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions,
expectations or beliefs of future performance, including statements regarding the suitability of the
Properties for mining exploration, future payments, issuance of shares and work commitment funds,
entry into of a definitive option agreement respecting the Properties, are "forward-looking statements".
These forward-looking statements reflect the expectations or beliefs of management of the Company
based on information currently available to it. Forward-looking statements are subject to a number of
risks and uncertainties, including those detailed from time to time in filings made by the Company with
securities regulatory authorities, which may cause actual outcomes to differ materially from those
discussed in the forward-looking statements. These factors should be considered carefully and readers
are cautioned not to place undue reliance on such forward-looking statements. The forward-looking
statements and information contained in this news release are made as of the date hereof and the
Company undertakes no obligation to update publicly or revise any forward-looking statements or
information, whether as a result of new information, future events or otherwise, unless so required by
applicable securities laws.
The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or
disapproved the contents of this press release, and do not accept responsibility for the adequacy or
accuracy of this release.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/278010