Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FFM.TO ·

Successful A$190m capital raising to fund development and resource growth

Corporate Updates

FireFly Metals Ltd

+61 8 9220 9030

[email protected]

www.fireflymetals.com.au

ACN: 110 336 733

Principal & Registered Office:

Level 2/8 Richardson Street West Perth WA 6005

ASX: FFM | TSX: FFM

Company Announcement

26 August 2026

Not for distribution to U.S. news wire services or dissemination in the United States.

Green Bay Copper-Gold Project, Canada

Successful A$190m capital raising to

fund development and resource growth

Proceeds will be used for early works, long-lead items and resource drilling

• FireFly has received firm commitments to raise ~A$180m (before costs) via an

Australian institutional placement and Canadian bought deal financing

• The equity raising was strongly supported by several large, long -only, new and

existing institutional investors based in Australia and overseas

• FireFly also intends to undertake a non-underwritten Share Purchase Plan (SPP) to

raise up to an additional A$10 m (before costs) at the same offer price as the

Australian institutional placement of A$1.78 per share

FireFly Metals Ltd (ASX: FFM, TSX: FFM) (FireFly or Company) is pleased to announce a highly

successful equity raising which will bolster the Company’s balance sheet as it progresses towards

project development while maintaining an aggressive exploration program.

FireFly has received firm commitments for a A$180 million (before costs) equity raising via the issue

of up to approximately 101.1 million new fully paid ordinary shares in the Company (New Shares) at

a price of A$1.78 (C$1.76)1 per New Share (Offer Price).

Following release of the Preliminary Economic Assessment (PEA)2 highlighting a technically and

economically robust project, the Company intends to use the fund s to continue de-risking,

advancing and growing its Green Bay Copper-Gold Project.

This includes early project works, procurement of long -lead capital items, advancing a Feasibility

Study for the 1.8Mtpa base case scenario and a Pre -Feasibility Study on the larger 4.6Mtpa

alternative scenario, and further Resource growth ahead of a Final Investment Decision by mid -

2027.

1 Based on an implied AUD.CAD exchange rate of 0.9888.

2 See ASX announcement dated 25 August 2026 and titled ‘Green Bay PEA confirms Scale, Long Life and Strong Returns’ for

further information regarding the PEA.

ASX: FFM | TSX: FFM

Page | 2

Equity Raising Details

The equity raising comprises two components (together, the Equity Raising):

(i) a A$150 million ASX institutional placement of New Shares (ASX Placement); and

(ii) a Canadian ’bought deal‘ private placement to raise ~C$29.6 million3 (~A$30 million)

pursuant to the Listed Issuer Financing Exemption (as defined below) (TSX Bought Deal).

Additionally, Fire Fly intends to invite Eligible Shareholders (as defined herein) to participate in a

non-underwritten Share Purchase Plan to acquire new fully paid ordinary shares in the capital of

FireFly ( SPP Shares) at the same offer price as the ASX Placement , to raise up to a further A$10

million (before costs).

ASX Placement

The Company has received firm commitments from sophisticated and professional investors

under the ASX Placement to raise A$150 million (before costs) through the issue of approximately

84.3 million New Shares at the offer price of A$1.78 per New Share (Placement Shares). Settlement

of the Placement Shares is expected to occur on or around Tuesday, 1 S eptember 2026. The

Placement Shares will be issued under the Company’s existing placement capacity under ASX

Listing Rule 7.1.

TSX Bought Deal1

FireFly has entered into an agreement with BMO Nesbitt Burns Inc. (BMO), pursuant to which BMO,

on behalf of a syndicate of underwriters, has agreed to purchase, on a bought deal private

placement basis, 16.8 million New Shares at a price of C$1.764 (A$1.78) per New Share for gross

proceeds of C$29.6 million5 (approximately A$30 million) under the TSX Bought Deal.

3 Based on the Bank of Canada AUD:CAD exchange rate of 0.9868 as at 21 August 2026.

4 Refer to note 1.

5 Refer to note 3.

FireFly Managing Director Steve Parsons said: “The strong demand for the raising reflects Green

Bay’s status as one of the world’s best undeveloped copper projects.

“This status was confirmed by the robust production and financial metrics contained in the

Preliminary Economic Assessment, which demonstrated a strong cashflow outlook and rapid

payback period.

“We are now very well-funded to progress towards project development while maintaining a

multi-rig drilling program aimed at ongoing resource growth”.

ASX: FFM | TSX: FFM

Page | 3

The New Shares under the TSX Bought Deal are being offered in Canada by way of the Listed Issuer

Financing Exemption (LIFE) in all of the provinces of Canada , (excluding Quebec), and by way of

private placement in the United States and offshore jurisdictions in accordance with applicable

laws. The New Shares issued pursuant to the LIFE will not be subject to a statutory hold period in

Canada. Further information regarding the TSX Bought Deal is set out in the “End Notes – Canada

– TSX Bought Deal”.

The TSX Bought Deal is expected to close on or around Thursday, 3 September 2026. The New

Shares that are subject of the TSX Bought Deal will be issued under the Company’s existing

placement capacity under ASX Listing Rule 7.1.

Share Purchase Plan

The Company is offering shareholders who were registered as a holder of Shares as at 5:00pm

(AWST) on 24 August 2026 ( Record Date ) and whose registered address is in Australia or New

Zealand ( Eligible Shareholders ) the opportunity to participate in the SPP and subscribe for a

maximum of A$30,000 worth of SPP Shares at the offer price of A$1.78 per SPP Share (being the

same price as the ASX Placement). The SPP is targeted to raise up to A$10.0 million (before costs).

The Company reserves the right (in its absolute discretion) , to scale back applications under the

SPP if demand exceeds A$ 10.0 million, to accept oversubscriptions or close the SPP at an earlier

date in accordance with the ASX Listing Rules and the Corporations Act 2001 (Cth) (Corporations

Act).

The SPP offer booklet, containing further details on the SPP, is expected to be released on the ASX

and made available to Eligible Shareholders on or around 4 September 2026. The SPP is subject to

the terms and conditions set out in the SPP offer booklet.

Use of Funds

The net proceeds of the Equity Raising and SPP will be primarily used to advance project

implementation for the Green Bay Copper-Gold Project and provide significant balance sheet

strength ahead of completion of a project financing process including:

• development and early works , including underground development for drilling

platforms, ventilation and electrical upgrade platforms, and surface early works;

• underground drilling targeting upper mine extensions, M&I Resource growth,

geophysical targeting, parallel lodes and depth extensions;

• regional exploration drilling including new discovery targeting across the district ;

• technical studies including a D efinitive Feasibility Study on the 1.8Mtpa base case and

Pre-Feasibility on the 4.6Mtpa alternative case; and

• corporate and transaction costs, and working capital to provide necessary flexibility to

conduct additional project development activities and early works .

ASX: FFM | TSX: FFM

Page | 4

Advisers

Canaccord Genuity (Australia) Limited acted as Sole Lead Manager and Bookrunner to the ASX

Placement. Euroz Hartleys Limited and Argonaut Securities Pty Ltd acted as Co-Managers to the

ASX Placement.

BMO acted as Sole Bookrunner , and part of a syndicate of underwriters including BMO, RBC

Dominion Inc, CIBC World Markets Inc. and Canaccord Genuity Corp., for the TSX Bought Deal.

Hamilton Locke acted as Australian legal advisor to the Company and Osler, Hoskin & Harcourt LLP

acted as Canadian legal advisor to the Company.

Indicative Timetable

Key Event Date (2026)

SPP Record Date (5:00pm AWST) Monday, 24 August

Announcement of Equity Raising and launch of ASX

Placement bookbuild Tuesday, 25 August

Announcement of completion of ASX Placement

bookbuild, lifting of trading halt and recommencement

of trading

Wednesday, 26 August

Settlement of ASX Placement Tuesday, 1 September

Allotment and Trading of Placement Shares issued

under the ASX Placement Wednesday, 2 September

Closing of TSX Bought Deal Thursday, 3 September

Despatch of SPP offer documents and SPP offer opens Friday, 4 September

SPP offer closing date Wednesday, 23 September

Announcement of SPP participation and results, and

allotment of SPP Shares Wednesday, 30 September

The above timetable is indicative only and subject to change. The Company reserves the right to amend any or all of these

dates and times without notice, subject to the Corporations Act, the ASX Listing Rules and other applicable laws.

This announcement has been authorised by the Board of Directors.

Contact information:

Steve Parsons

Managing Director

FireFly Metals Ltd

+61 8 9220 9030

Jessie Liu-Ernsting

Chief Development Officer

FireFly Metals Ltd

+1 709 800 1929

Media

Paul Armstrong

Read Corporate

+61 8 9388 1474

This announcement has been prepared for publication in Australia and Canada and may not be

released to US wire services or distributed in the United States. This announcement does not

constitute an offer to sell, or a solicitation of an offer to buy, secur ities in the United States or any

other jurisdiction. Any securities described in this announcement have not been, and will not be,

registered under the US Securities Act of 1933 and may not be offered or sold in the United States

except in transactions ex empt from, or not subject to, the registration requirements of the US

Securities Act and applicable US state securities laws.

ASX: FFM | TSX: FFM

Page | 5

ABOUT FIREFLY METALS

FireFly Metals Ltd (ASX, TSX: FFM) is an emerging copper -gold company focused on growing the

high-grade Green Bay Copper -Gold Project in Newfoundland, Canada. The project is advancing

towards development, with a Preliminary Economic Assessment showing the potential for a high-

grade, low-cost and long-life operation with a pathway to produce 100kt of copper per annum.

The Green Bay Copper-Gold Project is underpinned by 60.2Mt of Measured and Indicated Mineral

Resources at 2.43% for 1,464Kt copper equivalent (CuEq) and 23.5Mt of Inferred Mineral

Resources at 2.51% for 592Kt CuEq, prepared and disclosed in accordance with the 2012 Edition of

the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves

(JORC Code (2012 Edition)) and Canadian National Instrument 43-101 - Standards of Disclosure for

Mineral Projects (NI 43-101).

The Company has a clear strategy to continue growing the Green Bay Copper -Gold Project

through resource expansion, new discoveries and advancement towards development.

The Company also holds a 90% interest in the Limestone Well Vanadium -Titanium Project in

Western Australia.

Further information regarding FireFly Metals Ltd is available on the ASX platform (ASX: FFM), the

Company’s website www.fireflymetals.com.au or SEDAR+ www.sedarplus.ca.

COMPLIANCE STATEMENTS

End Notes – Canada – TSX Bought Deal

1. The securities offered have not been registered under the U.S. Securities Act of 1933, as amended,

and may not be offered or sold in the United States absent registration or an applicable

exemption from the registration requirements. This press release sha ll not constitute an offer to

sell or the solicitation of an offer to buy nor shall there be any sale of the securities in any

jurisdiction in which such offer, solicitation or sale would be unlawful.

Subject to compliance with applicable regulatory requirements and in accordance with National

Instrument 45-106 - Prospectus Exemptions ( NI 45-106), the New Shares issuable pursuant to

the TSX Bought Deal will be offered for sale to purchasers resident in all of the provinces of

Canada, except Quebec, pursuant to the listed issuer financing exemption under Part 5A of NI

45-106, as amended by Coordinated Bla nket Order 45 -935 – Exemptions from Certain

Conditions of the Listed Issuer Financing Exemption (the Listed Issuer Financing Exemption). The

New Shares issued pursuant to the Listed Issuer Financing Exemption will not be subject to a

statutory hold period in Canada. The New Shares may also be sold in offshore jurisdictions and

in the United States on a private placement basis pursuant to one or more exemptions from the

registration requirements of the US Securities Act.

There is an offering document (the Offering Document) related to the TSX Bought Deal that can

be accessed under the Company's issuer profile on SEDAR+ at www.sedarplus.ca and on the

Company's website at www.fireflymetals.com.au. Prospective investors should read the Offering

Document before making an investment decision.

The TSX Bought Deal is scheduled to close on 3 September, 2026, or such other date as the

Company and BMO may agree. It is expected that the ASX Placement will close

contemporaneously with or shortly prior to the closing of the TSX Bought Deal. Closing of the TSX

ASX: FFM | TSX: FFM

Page | 6

Bought Deal is conditional on the closing of the ASX Placement. Completion of the Equity Raising

is subject to certain conditions including, but not limited to, the receipt of all necessary

approvals, including the approval of the TSX.

FireFly intends to rely upon the exemption set forth in Section 602.1 of the Toronto Stock Exchange

(TSX) Company Manual in connection with the TSX Bought Deal, which provides that the TSX will

not apply certain requirements in transactions involving eligible interlisted issuers on a

recognized exchange like the ASX.

Mineral Resource Estimate – Green Bay Project

The Mineral Resource Estimate for the Green Bay Project referred to in this announcement and set out in

Appendix A was first reported in the Company’s ASX announcement dated 25 August 2026, titled ’Green

Bay PEA confirms Scale, Long Life and Strong Returns.’ A technical report supporting the Mineral Resource

Estimate and PEA will be filed on SEDAR+ within 45 days of that announcement.

Mineral Resource Estimate – Little Deer

The Mineral Resource Estimate for Little Deer referred to in this announcement was first reported in the

Company’s ASX announcement dated 29 October 2024, titled ‘Resource Increases 42% to 1.2Mt of

contained metal at 2% Copper Eq’ and is also set out in th e Technical Report for the Little Deer Copper

Project, titled ‘Technical Report and Updated Mineral Resource Estimate of the Little Deer Complex

Copper Deposits, Newfoundland, Canada’ with an effective date of 26 June 2024, available on SEDAR+

at www.sedarplus.ca.

Metal equivalents

Metal equivalents for the Mineral Resource Estimates have been calculated at a copper price of

US$10,626/t, gold price of US$3,587/oz and silver price of US$50.22/oz. Individual Mineral Resource grades

for the metals are set out in Appendix A of this announcement.

Metallurgical factors have been applied to the metal equivalent calculation. Copper recovery used was

95%. Historical production at the Ming Mine has a documented copper recovery of ~96%. Precious metal

(gold and silver) metallurgical recovery was assumed at 85% on the basis of historical recoveries

achieved at the Ming Mine in addition to historical metallurgical test work to increase precious metal

recoveries.

In the opinion of the Company, all elements included in the metal equivalent calculation have a

reasonable potential to be recovered and sold based on current market conditions, metallurgical test

work, the Company’s operational experience and, where relev ant, historical performance achieved at

the Green Bay project whilst in operation.

Copper equivalent was calculated based on the formula CuEq(%) = Cu(%) + (Au(g/t) x 0.97106) +

(Ag(g/t) x 0.01360).

Original Announcements

FireFly confirms that it is not aware of any new information or data that materially affects the information

included in the original announcements referred to or cross-referenced in this announcement and that,

in the case of Mineral Resource Estimates, al l material assumptions and technical parameters

underpinning the Mineral Resource Estimates in the original announcements continue to apply and

have not materially changed. The Company confirms that the form and context in which the Competent

Persons’ and Qualified Persons’ findings are presented have not been materially modified from the

original market announcements.

ASX: FFM | TSX: FFM

Page | 7

COMPETENT PERSON AND QUALIFIED PERSON STATEMENTS

All technical and scientific information in this announcement has been reviewed and approved by

Group Chief Geologist, Mr Juan Gutierrez BSc, Geology (Masters), Geostatistics (Postgraduate Diploma),

who is a Member and Chartered Professional of the Australasian Institute of Mining and Metallurgy and

a Member of the Australian Institute of Geoscientists. Mr Gutierrez is a Competent Person as defined in

the JORC Code 2012 and a Qualified Person as defined in NI 43 -101. Mr Gutierrez is a full-time employee

of, and holds securities in, the Company. Mr Gutierrez has sufficient experience that is relevant to the

style of mineralisation and type of deposit under consideration and to the activity being undertaken to

qualify as a Competent Person as defined in the JO RC Code 2012 and a Qualified Person as defined in

NI 43-101. Mr Gutierrez has reviewed the contents of this announcement and consents to the inclusion in

this announcement of all matters based on his information in the form and context in which they appear.

FORWARD-LOOKING INFORMATION

This announcement may contain certain forward -looking statements and projections, including

statements regarding the TSX Bought Deal, the ASX Placement, the SPP, and FireFly’s plans, forecasts

and projections with respect to its mineral properties and prog rams, including the use of the proceeds

of the TSX Bought Deal, the ASX Placement and the SPP and completion and expected timing of closing

of the TSX Bought Deal, the ASX Placement and the SPP. Forward -looking statements may be identified

by the use of wo rds such as ‘may’, ‘might’, ‘could’, ‘would’, ‘will’, ‘expect’, ‘intend’, ‘believe’, ‘forecast’,

‘milestone’, ‘objective’, ‘predict’, ‘plan’, ‘scheduled’, ‘estimate’, ‘anticipate’, ‘continue’, or other similar

words and may include, without limitation, statements regarding plans, strategies and objectives.

Although the forward -looking statements contained in this announcement reflect management’s

current beliefs based upon information currently available to management and based upon what

management believes to be reasonable assumptions, such forward -looking statements and

projections are estimates only and should not be relied upon. They are not guarantees of future

performance and involve known and unknown risks, uncertainties and other factors, many of which are

beyond the control of the Company, which may include changes in commodity prices, foreign exchange

fluctuations, economic, social and political conditions, and changes to applicable regulation, and those

risks outlined in the Company’s public disclosures.

The forward -looking statements and projections are inherently uncertain and may therefore differ

materially from results ultimately achieved. For example, there can be no assurance that FireFly will be

able to confirm the presence of Mineral Resources or Ore Reserves, that FireFly’s plans for development

of its mineral properties will proceed, that any mineralisation will prove to be economic, or that a mine

will be successfully developed on any of FireFly’s mineral properties. The performance of FireFly may be

influenced by a number of factors which are outside of the control of the Company, its directors, officers,

employees and contractors. The Company does not make any representations and provides no

warranties concerning the accuracy of any forward -looking statements or projections, and disclaims

any obligation to update or revise any forward -looking statements or projections based on new

information, future events or circumstances or otherwise, except to the extent required by applicable

laws.

ASX: FFM | TSX: FFM

Page | 8

APPENDIX A

Green Bay Copper-Gold Project Mineral Resources

Ming Deposit Mineral Resource Estimate

MING

DEPOSIT

TONNES COPPER GOLD SILVER CuEq

(Mt) Grade Metal Grade Metal Grade Metal Grade

(%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%)

Measured 3.5 1.5 52 0.2 20 1.3 147 1.7

Indicated 53.8 1.9 1,041 0.5 878 4.5 7,707 2.5

TOTAL M&I 57.3 1.9 1,093 0.5 899 4.3 7,853 2.4

Inferred 17.3 2.0 344 0.7 404 6.3 3,522 2.8

LITTLE DEER

TONNES COPPER GOLD SILVER CuEq

(Mt) Grade Metal Grade Metal Grade Metal Grade

(%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%)

Measured - - - - - - - -

Indicated 2.9 2.1 62 0.1 9 3.4 320 2.3

TOTAL M&I 2.9 2.1 62 0.1 9 3.4 320 2.3

Inferred 6.2 1.8 110 0.1 10 2.2 430 1.8

GREEN BAY

TOTAL

TONNES COPPER GOLD SILVER CuEq

(Mt) Grade Metal Grade Metal Grade Metal Grade

(%) (‘000 t) (g/t) (‘000 oz) (g/t) (‘000 oz) (%)

Measured 3.5 1.5 52 0.2 20 1.3 147 1.7

Indicated 56.7 1.9 1,103 0.5 887 4.4 8,027 2.5

TOTAL M&I 60.2 1.9 1,155 0.5 908 4.2 8,173 2.4

Inferred 23.5 1.9 454 0.6 414 5.2 3,952 2.5

1. FireFly Metals Ltd Mineral Resource Estimates for the Green Bay Copper -Gold Project, incorporating the Ming Deposit

and Little Deer Complex, are prepared and reported in accordance with the JORC Code 2012 and NI 43-101.

2. Mineral Resources have been reported at a 1.0% copper cut-off grade.

3. Metal equivalents for the Mineral Resource Estimates have been calculated using the CIBC long term mean

commodity prices as at 1 July 2026: copper price of US$10,626/t, gold price of US$3,587/oz and silver price of

US$50.22/oz.

4. Metallurgical recoveries have been set at 95% for copper and 85% for both gold and silver. These assumptions are

made of the basis of historical production at the Ming Mine and additional metallurgical test work.

5. Copper equivalent was calculated based on the formula: CuEq(%) = Cu(%) + (Au(g/t) x 0.97106) + (Ag(g/t) x 0.01360).

6. Totals may vary due to rounding. For further details refer to the ASX announcement dated 25 August 2026, titled ‘Green

Bay PEA confirms Scale, Long Life and Strong Returns’.