Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

FFF.CN ·

55 North Mining Secures 100% Ownership of the Last Hope Gold Project

Drill Results

55 North Mining Secures 100% Ownership of the Last Hope Gold Project

Toronto, Ontario – January 7, 2026 – 55 North Mining Inc. (CSE:FFF) (FSE:6YF) (“55 North”

or the “Company”) is pleased to announce that it has completed the required property payment

on its Last Hope Gold Project (the “Project”), resulting in 55 North now owning 100% of the

property.

With the property payment complete, 55 North has initiated mobilization of a drill rig to the Project

site and expects to commence drilling in mid-January as part of its 2025–2026 drill program. The

Company anticipates providing drill results approximately eight to ten weeks following completion

of drilling, subject to laboratory turnaround times.

Drill Program Objective: Grow the Resource

The planned drill program will focus on step-out drilling to the south of the Company’s existing

zones. The Company plans to drill fences comprised of two to three holes approximately every

120 metres along strike, expanding the footprint of known mineralization and testing for potential

extensions over an approximately 800-metre strike length.

“Securing full ownership of Last Hope is a major milestone for 55 North,” said Bruce Reid, CEO

of 55 North Mining. “With drilling expected to begin in mid-January, we will focus on step-out

drilling designed to test potential extensions of known mineralization and support an updated

geological model. The results from this program will guide our plans for an updated mine ral

resource estimate later in 2026.”

Updated Resource Estimate Expected Later in 2026

Following the 2025–2026 drill program, 55 North plans to deliver an updated mineral resource

estimate later in the year, integrating the new drill results. The previous mineral resource estimate

at the Last Hope Gold Project was completed in September 2021 based on a US$1,650/oz gold

price. With gold prices now materially higher, updated price assumptions may support a lower

cut-off grade and a larger reported resource.

Upcoming Catalysts

• Mid-January 2026: Drill program commencement

• Following Completion (approx. 8-10 weeks): Drill results expected (subject to laboratory

turnaround)

• Later in 2026: Updated mineral resource estimate

Qualified Person

Peter Karelse, P.Geo. a “qualified person” as defined under National Instrument 43-101, has

reviewed and approved the scientific and technical information contained in this release. Peter

Karelse is not independent of 55 North Mining, as he is the Company’s Head of Exploration.

About 55 North Mining Inc.

55 North Mining Inc. is a Canadian exploration and development company advancing its high-

grade Last Hope Gold Project located in Manitoba, Canada.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Mr. Bruce Reid

Chief Executive Officer

55 North Mining Inc.

Phone: 647-500-4495

[email protected]

Mr. Vance Loeber

Corporate Development

Phone: 778-999-3530

[email protected]

CAUTION REGARDING FORWARD-LOOKING INFORMATION

This news release contains “forward-looking statements” and “forward-looking information” within

the meaning of applicable securities laws. Forward -looking statements in this news release

include, but are not limited to, statements regarding the timing of mobilization and drilling, the

expected timing of drill results, the scope and objectives of the drill program, and the timing and

completion of an updated mineral resource estimate.

Forward-looking statements are based on management’s expectations and assumptions as of the

date hereof and are subject to known and unknown risks, uncertainties and other factors that may

cause actual results, performance or achievements to differ materially from those expressed or

implied by such forward-looking statements. Such risks and uncertainties include, but are not

limited to: delays in mobilization or drilling; weather, logistics and site conditions; availability of

equipment, personnel and contractors; receipt and timing of assay results; exploration results not

being consistent with expectations; and general market conditions.