Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FCI.V ·

WKN: A110N3 October 17 th, 2017 Berkwood intersects graphite in every hole drilled and completes 13 hole drill program

Exploration Programs

TSX‐V: BKR   

FSE: BR2N   

WKN: A110N3  October 17 th, 2017 

Berkwood intersects graphite in every hole drilled and completes 13 hole drill program  

October  17th,  2017,  VANCOUVER,  B.C.  Berkwood  Resources  Ltd.  (TSX‐V:  BKR, FSE: BR2N, WKN:

A110N3) (“Berkwood” or the “Company”)  is pleased to announce that it has completed Phase 1 of the 

drill program on its Lac Gueret Project (the “Project”).  A tot al of 13 planned diamond drill holes were 

completed from nine (9) separate drill sites for a total of 1,806.54m drilled. Targeted graphite (“Cgr”) was 

intersected in every hole drilled. The project, which includes  extensions, announced on September 6 th, 

totals 19,884Ha covered by 368 claims surrounding a planned‐to‐be producing graphite deposit.  

Shareholders can view two videos , one of them in virtual realit y, shot on location during Phase 1 of the 

drill program by visiting the Company’s website.  Both videos a re located on Berkwood’s home page at 

the bottom:   www.berkwoodresources.com. 

This  release  documents  significant  intervals  and  ideas  arising  from  work  on  Section  3300E,  the 

easternmost  section  drilled  thus  far.  The  final  three  drill  hol es  were  each  drilled  from  a  separate 

prepared drill site located abou t 100m apart: each hole was ali gned on a 360° azimuth and inclined at 

about ‐45°. Hole BK1‐11‐17 (144.78m in length to End of Hole (“EOH”) intersected 2 short graphite schist 

intercepts between 19.88 and 24.17m (4.29m) and 86.27 – 89.06m  (2.84m). Hole BK1‐12‐17 (150.88m 

to EOH) returned five C gr intercepts between 25.32 – 33.93m  (8.61m), 54.71 – 56.39m (1.6 8m), 83.38 – 

84.74m (1.35m), 97.22 – 98.96m (1.74m) and 137.59 – 144.23m (11 .67m). Hole BK1‐13‐17 (150.88 m to 

EOH)  returned  five  Cgr  intercepts  between  7.47  –  8.29m  (0.82m),  37.47  –  49.91m  (12.44m),  97.76  – 

109.38m  (11.62m),  117.60  ‐  124.38m  (11.78m)  and  124.38  –  141.79m  (17.41m).  Drilling  on  Section 

3300E is of lower hole density than on Sections 3200E and 3100E  previously reported, with drilling being 

undertaken subject to two current drilling permits issued by regulators in Quebec. 

The Company has submitted 381 samples (comprising 263 graphite  samples, 98 bracket samples, and 10 

each of duplicate core samples and field blank QA/QC material)  to MS Analytical Laboratories in Langley, 

BC.  The  samples  were  shipped  as  a  single  shipment  comprising  two  batches  under  a  single  chain  of 

custody protocol. 

The Lac Gueret Project is located in Côte‐Nord, Quebec, a three  hour drive from Baie‐Comeau in an area 

o f  v e r y  g o o d  i n f r a s t r u c t u r e .  T h e  P r o j e c t  d i r e c t l y  b o r d e r s  M a s o n  Graphite’s  (TSX‐LLG)  advanced  Lac 

Gueret Project to the South.  Berkwood is targeting airborne an d ground  conductive anomalies at the 

L a c  G u e r e t  S o u t h ’ s  Z o n e  1  l o c a t i o n  a s  p a r t  o f  t h i s  i n i t i a l  p r o gram,  where  two  distinct  electromagnetic 

conductors appear to occur over a two kilometer strike length.  The extent of the conductors and certain 

historic  grab  samples  that  returned  visible  graphite  corroborate d  b y  l a b o r a t o r y  a s s a y s  m o t i v a t e d  t h e  

present  drilling  program.  The  Company  also  has  well  developed  targets  at  Lac  Gueret  South’s  Zone  2, 

which  is  located  immediately  south  of  the  Mason  Graphite  claim  boundary  and  along  strike  from  the 

graphite zones of Mason Graphite.   Zone 2 has not been dr illed yet but is fully permitted and drilling is 

planned  for  the  upcoming  Phase  2  drill  program.  Shareholders  can  view  the  Company’s  entire  land 

position  in  relation  to  Mason  Graphite  and  other  landholders  at   the  Company’s  website,  (refer 

2 

http://berkwoodresources.com/wp‐content/uploads/2017/08/2017‐Berkwood‐Location‐and‐

Neighbours‐Map‐Topo.pdf ). 

Edward  Lyons  PGeo  (BC,  QC,  NL)  is  a  Qualified  Person  under  the  definition  of  Canadian  National 

Instrument 43‐101, and has approved the technical information in this news release.  

Tom Yingling, President and CEO states,  “I am pleased to provide confirmation that we have intersected 

graphite  in  all  of  the  thirteen  holes  in  our  first  drill  program.  The  electromagnetic  conductors  have 

proven very effective in identifying mineralized targets for drilling, and I would like to again recognise the 

discovery team, including Ed Lyons (our project lead and QP), J ames Rogers (Longford Exploration) and 

our  advisor  Mr.  Michel  Robert.    I  look  forward  to  moving  the  dr ill  over  to  our  Zone  2  target  and 

commencing  drilling  on  it.    In  addition  I  look  forward  to  our  team  developing  an  effective  exploration 

strategy on Berkwood’s recently acquired Vanadium property as w ell as continuing work on our Cobalt 

and Lithium projects as well.” 

About the Company:  Berkwood is engaged in exploration for the commodities that ena ble the modern 

revolution  in  essential  technologies.  These  technologies  are  dependent  upon  the  ethical  mining  and 

supply  of  naturally  occurring  elements  and  minerals  that  enhance  the  performance of  energy  storage 

systems and permit the development and miniaturization of new e lectronics and structural components 

for  the  new  suite  of  innovative  tools.    The  Company  is  led  by  a  team  with  collectively  over  100  years 

experience and have been involved with numerous discoveries of producing mines.   

On Behalf of the Board of Directors,  

Berkwood Resources Ltd. 

‘Thomas Yingling’

President, CEO & Director 

FOR MORE INFORMATION, PLEASE CONTACT: 

Investor Relations:  

[email protected] or 1‐778‐945‐2935     www.berkwoodresources.com  

Neither  the  TSX  Venture  Exchange n o r  i t s  R e g u l a t i o n  S e r v i c e s  P rov id e r ( a s  th a t ter m is  de fin e d  in  th e  po lic ie s  o f th e T S X Ve nture  Exchange) 

accepts responsibility for the adequacy or accuracy of this News Release.

Disclaimer for Forward-Looking Information:

Certain statements in this release are forward-looking statements , which reflect the expectations of management. Forward-looki ng statements

consist of statements that are not purel y historical, including any statements regar ding beliefs, plans, expectations or intent ions regarding the

future. Such statements are subject to risks and uncertainties that may cause actual results, performance or developments to d iffer materially

from those contained in the statements. No assurance can be gi ven that any of the events antici pated by the forward-looking st atements will

occur or, if they do occur, what benefits the Company will obtain from them. These forward-looking statements reflect manageme nt’s current

views and are based on certain expectations, estimates and assumptions, which may prove to be incorrect.