Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FCI.V ·

Boots-ON-the-Ground Work Program Commences at the Jupiter Lithium Project IN James BAY, Quebec

Exploration Programs

1 | Page

2200 – 1250 Rene Levesque Blvd. Montreal, QC, H3B 4W8 #1100 - 1111 Melville Street, Vancouver, BC, V6E 3V6

Phone: (438) 469-0705 Phone: (604) 343-7740

BOOTS-ON-THE-GROUND WORK PROGRAM COMMENCES AT THE JUPITER

LITHIUM PROJECT IN JAMES BAY, QUEBEC

September 12th, 2023 VANCOUVER, B.C. Green Battery Minerals Inc. ("Green Battery" or the

"Company") (TSX -V: GEM, FSE: BK2P, WKN: A2QENP OTC: GBMIF) is pleased to announce it has

commenced a work program at the highly prospective Jupiter Lithium Property in James Bay, following the

successful acquisition of the project in early 2023 (see May 4 th, 2023 news release) where numerous pegmatite

observations have been reported.

Tom Yingling, President and CEO of GEM Commented: “We are commencing aggressive 2023 exploration on our

Jupiter Lithium property with a ground -truthing, “Boots -on-the-ground” program. Our project, located in the

resource prolific James Bay area, benefits from up to 33 pegmatite descriptions that have been documented. We are

now advancing this historical information and are targeting the identification of potential lithium -bearing

minerals. Jupiter Lithium property is surrounded by some of the biggest lithium projects in North America, including

the James Bay and Rose deposits, as well as Patriot Battery Metals Inc’s (TSX-PMET) project. The findings at these

projects have created significant shareholder value for many companies working in the area. Based on these nearby

discoveries and the presence of a large number of documented pegmatite on the property, we believe we are well

positioned to drive additional value for our shareholders too, contingent on the results of this program.”

Helicopter-Assisted Rock Sampling Program

The Green Battery team is currently evaluating the 33 pegmatite locations at the property; with a view to reviewing

each during the work program that is to commence this week at the primary target areas.

The experienced team at Axiom Group have been secured to manage the helicopter assisted rock sampling program

at the Jupiter Property. Two teams are currently mobilizing to the KM381 base near the property to commence the

field program.

Teams will be aggressively covering the ground where the clusters of pegmatites have been identified already, in the

field, by government geologists. Where favorable outcrops are encountered, Axiom Group will systematically map

and sample the outcrops and will submit the samples collected to SRC Laboratories for comprehensive analysis

following the field program.

2 | Page

Figure 1: Jupiter Property Claims Disposition and Pegmatite Description across the local district.

About the Jupiter Property

The Jupiter Property was optioned to explore for Lithium (LCT) Pegmatites, and Rare Earth Elements (“REE”). The

property is an early-stage exploration opportunity which comprises a total of 122 Quebec mineral exploration claims

which amount to a total of 6406 hectares. Up to 33 pegmatite occurrences have been identifi ed by government

mapping completed over the property. Rock samples collected adjacent to the property returned up to 315ppm

lithium. These claims are strategically located within the James Bay lithium prospectivity area within which are the

Nemaska Lithium, James Bay Lithium and Rose Critical Elements deposits. The Jupiter Property fulfills the

Companies goal of providing additional battery elements that go into Lithium -Ion batteries.

Property Highlights

• The Jupiter property is located within the La Grande geological sub-province, near the boundary

with the Opinaca Sub province within a favorable host rock comprising “typically porphyritic and

magnetic tonalite; with minor injections of pink pegmatite”.

• Up to 33 pegmatite occurrences have been identified by government mapping completed over the

property. Rock samples collected adjacent to the property returned up to 315ppm lithium.

• The acquired claims are located over regionally elevated lake bottom sediment geochemical

anomalism for Lithium, with values up to 100ppm along the down ice trend of the property.

• Float Plane and Helicopter accessible, approximately 175 km south of Radisson, and 25 km

southwest of the Eleonore Mine and Airstrip. The northern infrastructure corridor comprising ‘Rte

de la Baie-James’ provincial highway and three Power transmission lines is located approximately

35 – 50km east of the property.

•

3 | Page

Green Battery Metal Critical Minerals Property Portfolio:

• Berkwood Graphite Project – Quebec. Graphite Project

• Jupiter – Quebec. Lithium Pegmatite (LCT) prospect

• Stallion – British Columbia. Copper Prophyry, Epithermal Au+Ag prospect

• Boudrias – Quebec. Nickel Copper (PGE) prospect

About the Berkwood Graphite Project

The Berkwood Graphite Project is located within the jurisdiction of Quebec, in the Manicouagan Regional County

Municipality, three hours driving time from the city of Baie-Comeau. Easy access is provided via a major secondary

road and numerous tertiary and forest roads that traverse the property.

The Zone 1 deposit lies 8 km southwest of Nouveau Monde’s deposit which has a $3.5 billion NPV on it. The

Companies Zone 1 deposit, and that of Nouveau Monde, share many similar geological characteristics, with the Zone

1 deposit being of exceptionally hight grade and coarse flake size by global standards.

The current mineral resource at the Berkwood Graphite Project includes in-pit constrained resource totalling

1,755,300 tonnes of indicated resources at 17.00 % Cgr and 1,526,400 tonnes in inferred resources at 16.39 % Cgr.

Table 2: In-pit Resource at Lac Gueret South Project (rounded numbers)

Current Resources (as of June 17th, 2019)

Minerals Resources Category Tonnage (Mt) Grade (% Cgr) Cgr (t) Cut off

Indicated 1.76 17.0 299,200 6.81%

Inferred 1.53 16.4 250,200 6.81%

The mineral resource estimates above are described in the technical report entitled, NI 43- 101Technical Report

Mineral Resource Estimate on the Lac Gueret South Graphite Property, Quebec, Canada. With an Effective date of

June 30th, 2019, by Edward Lyons, PGeo., Florent Baril, ing., and Claude Duplessis, ing.

Link to Report:

https://greenbatteryminerals.com/wp-content/uploads/ReportFINAL_compressed.pdf

Qualified Person: Mr. Luke van der Meer, P.Geo. is a Qualified Person (“QP”) as defined by National Instrument

43-101 guidelines, and he has reviewed and approved the technical content of this news release.

Or

Qualified Person: Maxime Bouchard, Geo., M.Sc., (OGQ #1752) of Laurentia Exploration Inc. (3415, rue de

l'Énergie Jonquière, Québec G7X 0J6), an independent Qualified Person as defined by Canadian NI 43-101 standards,

has reviewed, and approved the geological information reported in this news release.

4 | Page

About the Company: Green Battery Minerals Inc. is managed by a team with over 150 years collectively with a

proven track record of not just finding numerous mines but building and operating them too. The Green Battery

Mineral management team’s most recent success is discovering the Berkwood graphite resource in Northern Quebec.

Green Battery Mineral Inc. owns this asset 100 percent, and the Company’s shareholders will benefit from this asset

as the demand for Graphite for electric vehicles increases significantly.

On Behalf of the Board of Directors

Green Battery Minerals lnc.

‘Thomas Yingling’

President, CEO & Director

FOR MORE INFORMATION, PLEASE CONTACT:

Investor Relations:

or 1-604-343-7740

[email protected] www.greenbatteryminerals.com

Disclaimer for Forward-Looking Information:

Certain statements in this document which are not purely historical are forward- looking statements, including any statements regarding beliefs, plans, expectations

or intentions regarding the future. Forward looking statements in this news release include that the Company will carry out the drill program described in this news

release, conduct the Offering and expend funds on Berkwood Graphite Project exploration. It is important to note that the Company's actual business outcomes and

exploration results could differ materially from those in such forward-looking statements. Risks and uncertainties include that further permits may not be granted

timely or at all; the mineral claims may prove to be unworthy of further expenditure; there may not be an economic mineral resource; methods we thought would be

effective may not prove to be in practice or on our claims; economic, competitive, governmental, environmental and technological factors may affect the Company's

operations, markets, products and prices; our specific plans and timing drilling, field work and other plans may change; we may not have access to or be able to

develop any minerals because of cost factors, type of terrain, or availability of equipment and technology; and we may also not raise sufficien t funds to carry out our

plans. Additional risk factors are discussed in the section entitled "Risk Factors" in the Company's Management Discussion an d Analysis for its recently completed

fiscal period, which is available under Company's SEDAR profile at www.sedar.com. No assurance can be given that any of the events anticipated by the forward-

looking statements will occur or, if they do occur, what benefits the Company will obtain from them. These forward-looking statements reflect management's current

views and are based on certain expectations, estimates and assumptions, which may prove to be incorrect. Except as required by law, we will not update these

forward-looking statement risk factors.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for

the adequacy or accuracy of this