Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FCI.V ·

Berkwood Reports its 4 th Drill Program has Returned Continued High Grade Graphite Assays with 22.22 % Cgr over 102.45m and 43m in Surface Outcrop Channel Graphite Sample Assaying 24.17%. March 11 th, 2019, VANCOUVER, B.C. - Berkwood Resources Ltd. (TSX -V: BKR, FSE:

Drill Results

2200 – 1250 Rene Levesque Blvd. Montreal QC H3B 4W8

Phone: (438) 469-0705

2410 – 610 Granville Street Vancouver BC V6C 3T3

Phone: (604) 343-7740

email: [email protected]

Website: www.berkwoodresources.com

Berkwood Reports its 4 th Drill Program has Returned Continued High Grade

Graphite Assays with 22.22 % Cgr over 102.45m and 43m in Surface Outcrop

Channel Graphite Sample Assaying 24.17%.

March 11 th, 2019, VANCOUVER, B.C. - Berkwood Resources Ltd. (TSX -V: BKR, FSE:

BK2, WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce that it has

received positive assay results from the Phase 4 drilling program completed in December, 2018.

The program was designed to test areas around the western fold nose of Zone 1, and to extend and

infill areas of known mineralization with a view to expanding and improving the existing

geological model and to prepare for an initial mineral resource estimate. The 16 inclined NQ holes

totalled 2,078.3 m at the end of the program. Samples were shipped to MS Analytical Laboratories

(Langley, BC) for analysis, following the protocols applied to assay samples for Phases 1 through

3 from late 2017 through 2018. The drill program was carried ou t b y Forage Gyllis of Saint-

Jérôme, Quebec, a Ron Thibault company.

During the program several shallow subcrops of highly graphitic bedrock were exposed and

channel sampled. A channel sample composite over 43m taken normal to strike returned an

average grade of 24.17% graphite. The composite sample results for drilling and channel sampling

during Phase 4 are listed in Table 1, below.

Table 1: Results from Phase 4 Drilling (with Channel Sampling)

DDH ID From (m) To (m) Sample Length

(m)

Cgr

%

BK1-30-18 64.9 111.1 46.23 23.76

includes 64.9 74.23 9.33 25.21

includes 87.83 110.1 22.27 30.93

BK1-33-18 3 65.51 62.51 20.83

includes 3 30.63 27.63 33.93

BK1-34-18 55.65 61.42 5.77 21.12

BK1-35-18 3 105.5 102.45 22.22

includes 3 13.32 10.32 37.29

includes 28.61 39 10.39 29.71

includes 59.6 73.1 13.5 28.09

BK1-36-18 57.14 71.44 14.3 10.63

BK1-37-18 61.19 67.14 5.95 9.14

BK1-38-18 63 68.85 5.85 9.81

BK1-39-18 66.06 70.44 4.38 8.25

TSX-V: BKR

FSE: BK2

WKN: A110N3

DDH ID From (m) To (m) Sample Length

(m)

Cgr

%

BK1-41-18 49.85 80.78 30.93 8.75

BK1-42-18 20.18 178.3 158.12 14.05

includes 24.44 58.42 33.98 28.71

and 115.1 120 4.9 26.69

BK1-43-18 23.43 35.3 11.87 8.44

and 56.84 112.3 55.46 22.56

includes 56.84 86.7 29.86 28.62

BK1-44-18 50.52 55.22 4.7 16.9

and 79.93 84.4 4.47 9.14

BK1-45-18 10.72 16.43 5.71 8.44

and 56.66 91.17 34.51 11.31

Channel-1 17 60 43 24.17

Channel-2 2 17 15 27.87

Of the 16 holes drilled, 13 intersected significant mineralization with one hole having 22.22% Cgr

over 102.45m, with a high sample grade of 33.88%. The intersection of multiple wide intercepts

(for example the BK1-15-17 intercept of 72.10m at 13.64% Cgr from Phase 1 drilling, among

others) continue to encourage the Berkwood team to advance the Lac Guéret South project as

rapidly as possible.

Tom Yingling, President and CEO , states: “I am very pleased to announce the successful

completion of the fourth phase of drilling with all four phases combined totalling over 6,000 metres

now. The Berkwood team is also pleased to announce that we have drilled a 158.13 metre

intersection of graphite mineralization in hole 42 and 102.45 meters in hole 35. We are continuing

to unravel the structural and geological disposition of the Lac Guéret South Zone 1 graphite

body. So we continue the exciting but painstaking work required as Berkwood endeavours to chart

a focussed and efficient program to define the potential for an economic resource. Field crews

performed detailed structural logging and analysis of previous drill core. Once complete we will

add this information to our 3D model of our graphite body providing a clearer, more detailed

picture of the size and geometry of the southwestern portion of our Zone 1 graphite body. We are

making progress in stages and continue with each successive Phase to build on the great results

we have enjoyed since discovery.”

Edward Lyons, P .Geo (BC, QC. NL) states : “The drilling in Phase 4 focused on expanding

knowledge in and adjacent to the previously drilled areas. One outcome is increased recognition

of intervals of lower grade graphite interlayered with high-grade material. Some relatively narrow

true width intervals with lower grades may represent lateral extensions of thicker zones. Industry

and metallurgical experience in highly metamorphic graphitic rocks has shown that the medium

and lower graphite grade material can yield higher percentages of recoverable coarse flake

graphite, making these units potentially of similar economic value to higher grade intervals. The

true widths and persistence of graphite in almost all of Berkwood’s drillholes to date show the

potential of the Zone 1 anomaly.”

BK1-31-18 and BK1-32-18 were drilled across the margin of the western edge of the anomaly to

test the limits of graphite mineralisation. No significant graphite was encountered. Deposit

definition will require some tests at the deposit margins for the company to fully define

mineralization. This is typical of exploration testing.

Including the Phase 4 campaign, the Company has drilled 44 holes on Zone 1 that totals 6,006m.

The Company is pleased to announce it has intersected visual Graphite in ever y hole drilled to

date, with significant Cgr intercepts being observed in 41 holes. Success in these drill programs

confirms that a significant component of the distinct electromagnetic conductor s that have been

detected over a two-kilometer strike length and 50 meters to 600 meters in width by airborne EM

geophysics (see the Berkwood news release dated February 10, 2015) includes graphite

mineralization. The Company presents the following consolidated summary of drill results (refer

Table 2) for stakeholder review.

Table 2: Summary of significant graphite (Cgr) intercepts from drilling and channel sampling

DDH / Trench ID From (m) To (m) Sample

Length (m)

True

thickness

(m)**

Cgr Ave

(%)

Phase 1 Drill Program

BK1-01-17 40.23 45.00 4.77 4.48 28.61

99.48 137.77 38.29 36.00 14.68

includes 101.98 110.19 8.21 9.20 29.17

BK1-02-17 43.05 46.38 3.33 9.75 15.16

60.85 80.45 19.60 15.50 24.01

includes 64.38 74.40 10.02 6.40 32.95

BK1-03-17 20.79 47.69 26.90 26.90 24.40

includes 24.28 26.94 2.66 2.60 31.08

includes 34.69 44.06 9.37 9.30 35.34

BK1-03-17 93.40 99.38 5.98 5.98 13.11

BK1-04-17 26.68 79.24 52.56 40.30 21.01

includes 26.68 54.55 27.87 21.40 28.38

includes 69.19 71.71 2.52 1.90 31.72

BK1-05-17 31.40 43.86 12.46 8.80 20.72

includes 36.21 39.41 3.20 1.40 33.69

BK1-06-17 16.39 28.34 11.95 22.10 25.52

BK1-07-17 112.75 118.61 5.95 4.40 10.83

BK1-08-17 139.42 160.63 21.21 16.40 20.04

includes 150.37 155.83 5.46 4.50 31.19

169.83 177.04 7.11 6.20 28.02

BK1-09-17 114.25 142.34 28.09 18.50 12.27

BK1-10-17 133.98 148.75 14.77 14.10 9.10

BK1-11-17 19.84 24.17 4.33 3.80 11.39

BK1-12-17 30.62 33.93 3.31 2.70 11.23

BK1-13-17 38.44 46.59 8.15 6.90 19.20

99.64 105.57 5.93 4.90 18.84

DDH / Trench ID From (m) To (m) Sample

Length (m)

True

thickness

(m)**

Cgr Ave

(%)

117.60 120.13 2.53 2.00 18.52

Phase 2 Drill Program

BK1-14-17 19.40 84.09 64.69 20.90 20.95

includes 53.99 79.55 25.56

37.68

BK1-15-17 47.21 129.53 82.32 71.10 13.64

includes 47.21 56.43 9.22

27.20

includes 67.41 81.75 14.34

27.52

BK1-16-17 18.32 46.66 28.34 26.61 21.86

includes 18.32 39.08 20.76

29.84

BK1-16-17 50.79 125.38 74.59 38.48 17.34

includes 50.79 57.91 7.12

32.00

& includes 69.75 87.02 17.27

30.75

BK1-17-17 47.74 104.32 56.58 43.30 16.23

includes 59.90 78.81 18.91

26.33

BK1-18-17 57.31 70.24 12.93 8.01 18.58

Phase 3 Drill Program

BK1-19-18 35.20 44.60 9.68 9.10 24.85

BK1-20-18 15.20 43.43 28.23 3.80 5.04

43.43 62.33 18.90 14.50 14.28

62.33 99.93 37.60 19.90 4.28

BK1-21-18 74.20 112.92 38.72 26.50 17.58

BK1-22-18 21.34 50.15 28.80 16.50 17.85

BK1-23-18 0.00 0.00 0.00 0.00 0.00

BK1-24-18 64.93 70.45 5.52 1.90 13.18

BK1-25-18 18.24 148.79 130.55 87.50 17.37

Includes 18.24 47.14 28.90 20.20 24.67

Includes 47.14 71.60 24.46 15.70 9.03

Includes 71.60 88.39 16.79 13.80 33.88

includes 88.39 113.31 24.92 12.50 18.52

includes 113.31 148.79 35.48 25.30 6.79

BK1-26-18 67.91 76.30 8.39 4.20 14.70

128.07 148.08 20.01 9.00 18.37

BK1-27-18 43.55 48.87 5.32 1.80 4.58

57.71 72.49 14.78 6.20 6.82

119.10 134.11 15.01 11.50 20.58

141.21 147.13 5.92 4,50 26.70

161.00 182.89 21.89 10.00 4.76

Phase 4 Drill / Channel Program

BK1-30-18 64.9 111.1 46.23

23.76

Includes 64.9 74.23 9.33

25.21

Includes 87.83 110.1 23.3

30.93

DDH / Trench ID From (m) To (m) Sample

Length (m)

True

thickness

(m)**

Cgr Ave

(%)

BK1-33-18 3 65.51 62.51

20.83

Includes 3 30.63 27.63

33.93

BK1-34-18 55.65 61.42 5.77

21.12

BK1-35-18 3 105.5 102.45

22.22

Includes 3 13.32 10.32

37.29

Includes 28.61 39 10.39

29.71

Includes 59.6 73.1 13.5

28.09

BK1-36-18 57.14 71.44 14.3

10.63

BK1-37-18 61.19 67.14 5.95

9.14

BK1-38-18 63 68.85 5.85

9.81

BK1-39-18 66.06 70.44 4.38

8.25

BK1-41-18 49.85 80.78 30.93

8.75

BK1-42-18 20.18 178.3 158.12

14.05

Includes 24.44 58.42 33.98

28.71

Includes 115.1 120 4.9

26.69

BK1-43-18 23.43 35.3 11.87

8.44

56.84 112.3 55.46

22.56

includes 56.84 86.7 29.86

28.62

BK1-44-18 50.52 55.22 4.7

16.9

79.93 84.4 4.47

9.14

BK1-45-18 10.72 16.43 5.71

8.44

56.66 91.17 34.51

11.31

Channel-1 17 60 43

24.17

Channel-2 2 17 15

27.87

** True thickness was estimated based on foliation to core axis and the initial interpretation of unit

attitudes from geology modelling.

Edward Lyons, the company’s QP, explains that the determination of true width at Lac Guéret

is complicated by two principal phases of folding. The probability of multiple folds within graphite

horizons, such as has been observed at Mason Graphit e’s adjacent Lac Guéret deposit, can result

in thickening of graphitic units. The estimation parameters will be principally constrained by the

modelled geology and structure (interpreted with the assistance of Terrane Geosciences Inc. of

Halifax, NS). The latest results will be assessed in a 3D model, with plans to commence an initial

mineral resource estimate in Q2. Lyons notes that the extensive high-grade graphite in subcrop, as

well as a number of high assayed grades at relatively shallow depth are fact ors that may have

positive impacts on ultimate strip ratios for mining.

Edward Lyons P .Geo (BC, QC, NL) is a Qualified Person under the definition of Canadian

National Instrument 43-101, and has approved the technical information in this news release. Ed

has worked extensively on Mason’s Lac Guéret Property, and neighbouring graphite properties

since 2000.

Photo: Channel Sampling of graphite from outcrop 2 on Lac Guéret.

About the Company: Berkwood is engaged in exploration for the commodities that enable the

modern revolution in essential technologies. These technologies are dependent upon the ethical

mining and supply of naturally occurring elements and minerals that enhance the performance of

energy storage systems and permit the development and miniaturization of new electronics and

structural components for the new suite of innovative tools. The Company is led by a team with

collectively over 200 years experience and whose members have been involved with the discovery

of several producing mines.

On Behalf of the Board of Directors

Berkwood Resources Ltd.

‘Thomas Yingling’

President, CEO & Director

FOR MORE INFORMATION, PLEASE CONTACT:

Investor Relations:

[email protected] or 1-604-343-7740 www.berkwoodresources.com

Disclaimer for Forward-Looking Information:

Certain statements in this release are forward-looking statements, which reflect the expectations of management. Forward-looking

statements consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations or

intentions regarding the future. Such statements are subject to risks and uncertainties that may cause actual results, performance or

developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated

by the forward-looking statements will occur or, if they do occur, what benefits the Company will obtain from them. These forward-

looking statements reflect management’s current views and are based on certain expectations, estimates and assumptions, which

may prove to be incorrect.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.