Berkwood files robust pit constrained mineral resources at its Lac Guéret South Project on SEDAR

Corporate Updates

2200 – 1250 Rene Levesque Blvd. Montreal QC H3B 4W8

Phone: (438) 469-0705

2410 – 610 Granville Street Vancouver BC V6C 3T3

Phone: (604) 343-7740

Email: [email protected]

Website: www.berkwoodresources.com

Berkwood files robust pit constrained mineral resources

at its Lac Guéret South Project on SEDAR

Vancouver, August 19th, 2019 --Berkwood Resources Ltd. (TSX -V: BKR) is pleased to announce

the filing of a pit-constrained Mineral Resource Estimate technical report regarding its Lac Guéret

South Project. The final edits and assembly of the report show no material differences between the

earlier news release and the final, full version of the report filed on SEDAR.

The maiden Mineral Resource Estimate for Lac Guéret South, Zone 1, is summarized in Table 1 (with

annotation). The Mineral Resource Estimate is based on drilling campaigns in 2017 and 2018 totalling

6,232.49 meters.

Table 1: Base Case Pit-Constrained Mineral Resource Estimate at the Lac Guéret South Project1

Mineral Resource

Category

Current Resource (June 2019)8

Tonnage (Mt)5,7 Grade (% Cgr)4 Cgr (t)6

Indicated 1.76 17.00 299,200

Inferred3 1.53 16.4 250,200

Notes:

1 The mineral resources provided in this table were estimated using current Canadian Institute of Mining,

Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Reserves, Definition and

Guidelines.

2 Mineral resources that are not mineral reserves do not have demonstrated economic viability. Additional

trenching and/or drilling will be require d to convert Inferred and Indicated Mineral Resources to

Indicated and Measured Mineral Resources.

3 Inferred Mineral Resource s represent material that is considered too speculative to be included in

economic evaluations. Additional trenching and/or drilling will be required to convert Inferred Mineral

Resource to Indicated or Measured Mineral Resources/Reserves.

4 All assays used for the Resource Estimates were performed by MS Analytical in Langley, BC with

verification samples analysed at ALS-Laboratory at Burnaby, BC for graphitic carbon (“% Cg”), internal

analytical code SPM-140 and GE_CSA05V respectively.

5 Current Resource effective June 30, 2019.

6 No recovery was applied in the calculation of tonnage of graphitic carbon (90% recovery was applied

in pit optimization to define pit constrained mineral resources).

7 The Current Mineral Resources are stated at a cut-off grade of 6.81% Cgr.

TSX-V: BKR

FSE: BK2

WKN: A110N3

2

Tom Yingling President and CEO states: “Berkwood has reached a significant milestone at our L ac

Guéret South project with the definition of a significant pit constrained mineral resource. With this

new data Berkwood has started the process of the permitting in order to permit forest logging in the

area of a potential pit and to allow for stripping and bulk sampling at surface. This resource presents

sufficient size and grade for the Company to move forward with immediate next step plans, as this

maiden resource compares favourably with other developed and in- development projects. We are

confident Lac Guéret South will figure into the emerging Lac Guéret graphite production camp in the

near future. Our exploration and metallurgical work has received an enthusiastic reception among

long-run graphite buyers and financiers, and we have embarked upon a program of resource expansion

in the local area. We will immediately refine our current resource and increase our knowledge on the

quality and size of the deposit and adjacent deposits which we expect will further add to our resource

base.”

Edward Lyons, PGeo (BC,QC,NL) states: “The results of the initial resource estimate and

metallurgical testwork demonstrate that the Zone 1 deposit as tested to date has substantial resources

and robust recoveries, subject to further testing. The deposit has not been closed off in the lateral

extents and the several geophysical surveys suggest that the shallower mineralisation continues around

the western fold hinge. The strike length has the potential to significantly increase resources with future

development drilling. The Zone 2 target now in an early exploration stage, may add mineralisation as

well.”

Table 2: Current Resource Pit Envelope Characteristics

Characteristics Main Layer 01

Length (m)1 290 340

Azimuth (⁰) 80 42

Maximum width (m) 130 35

Surface Area (km2) 0.13

(1) Measured length is approximate.

Data Sources and Current Resource Estimation Methods

The block model used to generate this Resource is based on a total of 45 diamond drillholes and two

trenches for a total of 6,232.49 metres and 77 metres of trenches with 1194 samples and 28 samples

collected from trenches.

The present Resource block model was prepared under supervision of Claude Duplessis , P.Eng. of

GoldMinds Geoservices Inc. of Québec City, QC using Genesis © mining software. The block model

estimate was performed using interpolation according to the inverse of the distance fr om nearest

composites and the ellipsoid influenced distance in calculation which were adapted for the geology of

the deposit by application of the variable direction search ellipsoid special tool in Genesis software for

folded deposits.

3

The block size has been defined in order to respect the complex geometry of the envelopes. The mineral

resource estimate was carried out with a block size of twenty-seven cubic meters (3m (EW) x 3m (NS)

x 3m (Z)). The density to convert volume to tonnage used is 2.9.

The envelopes have been filled by regular blocks and only sample composites within the envelopes

were used to estimate the block grades. This represents a total of 3,015 sample composites.

The average percentage carbon (% Cgr) was calculated using interpolation according to the inverse of

the distance from nearest composites and the ellipsoid influenced distance in calculation. Interpolation

parameters were based on drill spacing, envelope extension and orientation.

Different numbers of runs and ellipsoid dimensions were used depending on the envelope. Two runs

were used in envelope “Main” and only one run was used in each remaining envelope s (Layer 01,

Layer A and Layer B), for the mineral Resource Estimate (see ellipsoids parameters in Table 3).

Specifically, run parameters were as follows: Main envelope: In run one (1), the number of composites

is limited to nine (9) with a minimum of three (3) per block and a maximum of two (2) composites

from the same drillhole. For run two (2), the number of composites was limited to nine (9) with a

minimum of three (3) and no limit number composites per drillhole. For Layer 01, Layer A and Layer

B: One run was executed with the number of composites limited to nine (9) with a minimum of three

(3) per block and a maximum of two (2) composites from the same drillhole.

Table 3: Variable Search Ellipsoid Parameters

Ellipsoids Parameters Main Pass01 Main Pass02 Layer01 Layer A Layer B

Azimuth 80 80 50 50 50

Dip 0 0 0 0 0

Spin 5 5 35 35 35

Major 30 40 30 10 15

Median 40 60 40 15 15

Minor 10 15 10 5 5

Within the folded or faulted nose of the Main envelope, a variable ellipsoid was used in the estimate,

as Genesis software (chosen specifically for its features) has the capacity to search along complex

planes.

The classical method of distance and composites within the search ellipsoid wa s selected to classify

the deposit where one defined class is used by ellipsoid. A total of two ellipsoids and two runs were

applied. Two runs were performed for the Main envelope (indicated and inferred) and one run was

done for each envelope Layer 01, Layer A and Layer B (inferred).

The block model was afterward processed in MineSight software to provide an optimized pit envelope

constraining the mineral resources (see Table 4 below). The technical and economic parameters used

to generate the pit shell envelopes are listed in the Table 5 below. The base case is in bold.

4

The resource shell parameters were derived from comparable graphite projects in the region and

preliminary metallurgical testing done at Met-Solve Laboratories of Langley, British Colombia in Item

13 of the filed NI 43-101 report presenting similar results aligned with adjacent project. Duplessis

elected to apply a conservative recovery of 90% as additional metallurgical testing is required to better

define the flake class and so to constrain the price point values of the eventual saleable products.

Table 4 Pit optimization Results (rounded)

Optimised Pit.

Mineral Resource Waste(*) Stripping

Ratio Indicated Inferred

Tonnes Cg

(%) Tonnes Cg

(%) Tonnes

Pit 01 998 600 21.50 424,300 23.01 5,520,800 3.87

Pit 02 1,161,300 20.21 730,800 20.96 8,371,100 4.42

Pit 03 1,349,900 19.02 908,900 19.42 9,921,600 4.39

Pit 04 1,474,900 18.19 1,042,400 18.46 10.730,700 4.26

Pit 05 1 648 800 17,35 1,349,400 17.05 14,229,900 4.74

Pit 06 (base Case) 1,755,300 17.00 1,526,400 16.39 16,774,000 5.11

Pit 07 1,816,800 16.73 1,793,800 15.49 19,592,000 5.42

(*) “waste” here is not waste but is considered to be material which is not economic at the time of this pit

optimization.

Table 5: Current Resource Shell Envelope Generation Parameters Base Case ($CDN)

Parameters Values

Mining Cost 6 $/t

Transport 36 $/t

Processing 40 $/t

G & A 10 $/t

Recovery 90 %

Selling Price Cg 1,530 $/t

Quality assurance and control were maintained through the systematic use of blank samples (non-

graphitic) inserted into the sample sequence every 20th sample as well as duplicate quarter-cut drill core

samples. The blank samples consistently returned only trace Cg values . The duplicate sample results

closely repeated the comparison sample analyses on the half -core, though there is typically some

variation in grade owing to the lower material volume in quarter-cut core vs. half-core, in addition to

the local variations in Cg at decimeter scale. Fifty (50) samples selected by Lyons were taken from the

original rejects at MS Analytical and one -kilogram riffle-split coarse reject material was delivered to

ALS Laboratory for analyses that closely followed the original methods used by MS Analytical. These

had a close correlation , and the authors of the report are confident that the original assays are

representative of the samples assayed.

The database was reviewed by Lyons and GoldMinds. S everal errors were discovered and resolv ed,

and the final database included the corrections.

5

The technical data included in this release was prepared by qualified independent experts, as defined

by NI 43-101 Regulation, including Claude Duplessis Eng., of GoldMinds Geoservices Inc. (resource

estimation), Edward Lyons PGeo (BC, QC,NL) of Tekhne Research Inc. (senior author and most of

the report), and Florent Baril, Eng. of Bumigème Inc. (mineral processing and metallurgical testing).

Berkwood Resource Ltd has finalising the independently prepared Mineral Resource Estimate

technical report, in accordance with the National Instrument (NI) 43-101, detailing this important work,

and the report is now filed on SEDAR at www.sedar.com .

Edward Lyons PGeo (BC, QC, NL) is the Qualified Person under the definition of Canadian National

Instrument 43-101 for Berkwood Resources and has approved the technical information in this news

release. Ed has worked extensively on the Lac Gueret Property, now owned by Mason Graphite, and

on neighbouring graphite properties since 2000.

About the Company: Berkwood is engaged in exploration for the commodities that enable the modern

revolution in essential technologies. These technologies are dependent upon the ethical mining and

supply of naturally occurring elements and minerals that enhance the performance of energy storage

systems and permit the development and miniaturization of new electronics and structural components

for the new suite of innovative tools. The Company is led by a team with collectively over 200 years

experience and whose members have been involved with the discovery of several producing mines.

On Behalf of the Board of Directors

Berkwood Resources Ltd.

‘Thomas Yingling’

President, CEO & Director

FOR MORE INFORMATION, PLEASE CONTACT:

Investor Relations:

[email protected] or 1-604-343-7740 www.berkwoodresources.com

Disclaimer for Forward-Looking Information:

Certain statements in this release are forward-looking statements, which reflect the expectations of management. Forward-looking statements consist of

statements that are not purely historical, including any statements regarding beliefs, plans, expectations or intentions regarding the future. Such

statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in

the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what

benefits the Company will obtain from them. These forward-looking statements reflect management’s current views and are based on certain expectations,

estimates and assumptions, which may prove to be incorrect.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts