Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FCI.V ·

Berkwood drills 90m of graphite during ongoing Phase 4 drilling and provides an overview of Mise-Á-La-Masse geophysical results at the Lac Guéret South Graphite Project.

Drill Results Exploration Programs

Suite 3204 – 610 Granville Street

Vancouver B.C. V6C 3T3

Phone: (604) 343-7740

email: [email protected]

Website: www.berkwoodresources.com

Berkwood drills 90m of graphite during ongoing Phase 4 drilling and provides

an overview of Mise-Á-La-Masse geophysical results at the Lac Guéret South

Graphite Project.

December 14th, 2018, VANCOUVER, B.C. Berkwood Resources Ltd. (TSX-V: BKR, FSE: BK2,

WKN: A110N3) (“Berkwood” or the “Company”) is pleased to announce that drilling at its Phase 4

definition drilling program on Zone 1 at the Company's 100% owned Lac Guéret South Project is

continuing. The Program is designed to extend eastward, and to infill drill portions of, the current

mineralization model: to date Berkwood has drilled nine (9) new holes for 1,080m of newly acquired core

on Phase 4, to bring the total drilling at Zone 1 to 5,086m over 36 drill holes. In hole BK1-35-18, drilling

intersected 102.45 m ( not a true width) of continuous graphite ( “Cgr”) mineralization. The Company is

also engaged in the collection of selected surface channel samples above the drill hole trace to assist with

enhancing the geological model.

The Phase 4 program is benefitting fr om the Mise- Á-La-Masse (“MALM”) geophysical program

undertaken during the recent fall season. The MALM program charged known graphite intercepts located

in hole BK1-27-18 at grounding points located within two Cgr intercepts respectively located at 130m and

170m downhole. A surface survey grid consisting of 9 N/S lines arranged 100m apart, with lengths ranging

between 525m and 750m was established over the western portion of the historic airborne and ground-

delineated EM conductive resistivity anomaly (refer figures at https://berkwoodresources.com/projects/lac-

gueret-extensions-graphite-project-quebec-canada/). Reference stations along the lines were located every

25m along each line. The surveys from both Cgr horizons confirmed a surface expression of conductivity

of some 250 to 500 m wide N/S that extends over 800 in an ENE direction, and is likely unconstrained to

the ENE. The result indicates that these two graphite-rich beds are electrically interconnected, the current

diffusing from one to the other when grounded. This current diffusion could result from background Cgr or

connective structures between these mineralized horizons. It is also possible that the current spread through

faults to highlight another graphitic bed located at a shallower depth. In each case, a north trend (zone) and

south trend (zone) is identified within the broader conductive feature, as is delineated in the Figure below.

“We’re pleased to share the MALM results with the public,” states Tom Yingling, President and CEO. “The

Phase 4 campaign integrates our deposit model generated through drilling Phases 1 to 3 with the MALM

data to drill with the purpose of assembling sufficient information for the preparation of a preliminary

resource statement.”

The Phase 4 drill program is supported by QC -based drilling and project management companies, and

project and camp support personnel from the Project area. The drill program is being updat ed with near-

real time interactive updates to the geology, structure , and mineralization model by frequent data

transmission to Tony Gilman of Terrane Geosciences (structural modeling) and Michael Waldegger of

MFW Geosciences (resource estimate), to ensure that the Phase 4 work informs real time model evolution

and maximises the effectiveness of drill targeting.

2

Figure. Surficial MALM Interpretation @ 130m down-hole BKI-27-18 (upper Cgr intercept)

Lac Gueret South, Zone 1

Lac Gueret South is located in Cote Nord, eastern Quebec, a three-hour drive north from Baie-Comeau in

an area with very good infrastructure. The Project lies directly south of Mason Graphite's (TSX -LLG)

advanced Lac Gueret Project. Mason is developing one of the largest medium - to high -grade graphite

deposits in the world.

The project comprises 288 Claims which cover a total area of 15,552 hectares. Prior to commencement of

the current Phase 4 campaign, the Company has drilled 27 holes on Zone 1 that totals 4,006m. The Company

is pleased to announce it has intersected visual Graphite in every hole drilled to date. Success in these drill

programs confirms that a significant component of the distinct electromagnetic conductors that occur over

a two kilometer strike length and 50 meters to 600 meters in widt h as defined by airborne EM geophysics

(see the Berkwood news release dated February 10, 2015) that includes graphite mineralization.

To view virtual reality video from earlier drill programs and to view the geological model as visualised

following the completion of the Phase 3 drill program, please follow the link at the bottom of our home

3

page http://www.berkwoodresources.com and to view current pictures of the fourth drill program please

visit: https://berkwoodresources.com/projects/lac-gueret-extensions-graphite-project-quebec-canada/ .

Edward Lyons PGeo (BC, QC, NL ) is a Qualified Person under the definition of Canadian National

Instrument 43-101, and he has approved the technical information in this news release. Ed has worked

extensively on the Lac Gueret Property, now owned by Mason, and neighbouring graphite properties since

2000.

About the Company: Berkwood is engaged in exploration for the commodities that enable the modern

revolution in essential technologies. These technologies are dependent upon the ethical mining and supply

of naturally occurring elements and minerals that enhance the performance of energy storage systems and

permit the development and miniaturization of new electronics and structural components for the new suite

of innovative tools. The Company is led by a team with collectively over 100 years experience and whose

members have been involved with the discovery of several producing mines. The Company is particularly

pleased to have partnered with QC -focussed entities for the financial support of the Lac Guéret South

Project.

On Behalf of the Board of Directors

Berkwood Resources Ltd.

‘Thomas Yingling’

President, CEO & Director

FOR MORE INFORMATION, PLEASE CONTACT:

Investor Relations:

[email protected] or 1-778-945-2935 www.berkwoodresources.com

Disclaimer for Forward-Looking Information:

Certain statements in this release are forward-looking statements, which reflect the expectations of management. Forward-looking statements

consist of statements that are not purely historical, including any statements regarding beliefs, plans, expectations or intentions regarding the

future. Such statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from

those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if

they do occur, what benefits the Company will obtain from them. These forward-looking statements reflect management’s current views and are

based on certain expectations, estimates and assumptions, which may prove to be incorrect.

Neither TSX Venture Exchange (“Exchange”) nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.