Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FAT.CN ·

Material Change Report

Corporate Updates

51-102F3

MATERIAL CHANGE REPORT

Item 1 Name and Address of Company

FOREMOST LITHIUM RESOURCE & TECHNOLOGY LTD. (the “Company”)

Suite 250, 750 West Pender Street

Vancouver, BC

V6C 2T7

Item 2 Date of Material Change

May 23, 2024

Item 3 News Release

A news release announcing the material change was published on May 23, 2024, and

distributed through Globe Newswire and filed on SEDAR.

Item 4 Summary of Material Change

On May 23, 2024 the Company announced that it has completed its Winter drill program

on its Zoro Lithium Project in Manitoba, Canada.

Item 5 Full Description of Material Change

The Company announced that it has successfully completed its 2024 winter diamond drilling

program on its Zoro property, which was previously announced in the Company’s press release

dated February 13, 2024. The Company completed 5,826 meters, 21 diamond drill holes targeting

untested mineralization to the south-east of Dyke 1, the Company's maiden inferred resource of

1,074,567 tons at a grade of 0.91% Li 2O, with a cut-off of 0.3%, as outlined in the Company’s

filed Regulation SK -1300 Technical Report Summary (2023) and NI -43-101 Technical Report

(2018).

Drilling results have demonstrated the continuity of lithium mineralization along Dyke 1 ,

targeting new, untested areas proximal to the dyke, as well as infill areas along strike and at depth.

In the west, the body is comprised of multiple near surface lithium-bearing pegmatites that range

up to an apparent 17.9 m thickness; Multiple 50-meter step-outs, perpendicular to the strike of

Dyke 1, were used to assess lateral continuity as well as the presence of at depth, extending Dyke

1 from a previous 265-meter strike length to greater than 400 meters. Spodumene was confirmed

in drill core in several of the 50 metre step out extensions, providing promising potential for new

resource calculation.

“We are pleased to announce the conclusion of a successful drill program on our Zoro Property,

which we believe is likely to reflect a continuity of mineralized lithium along Dyke 1,” said Jason

Barnard, President & CEO of Foremost Lithium. “As global lithium trends continue to straighten,

we look forward to the final assay results, which provide the potential for us to pursue additional

resource expansion on the Zoro property.”

The Company reported initial assay results (see press release dated April 08, 2024) on the first

two holes confirming lithium mineralization spanning a cumulative length of 25.92 metres

including 1.09% Li2O across 10 metres on drill hole FL24-010 and 1.52% Li2O in drill hole FL24-

009 across 5.02 meters. A total of 973 drill core samples have been collected for assay and

shipped to SGS Laboratories in Burnaby for detailed analysis. All remaining assays are still

pending and are anticipated to be reviewed and completed in approximately 4 to 6 weeks.

Drilling Details*

Hole ID Prospect Easting

(m)

Northing

(m)

Elevation

(m)

Azimuth

(deg.)

Dip

(deg.)

Depth

(m)

FL24-001 Dyke 8 459503 6080341 291 68 55 125

FL24-002 Dyke 8 459487 6080307 290 68 65 176

FL24-003 Dyke 8 459496 6080388 291 77 55 125

FL24-004 Dyke 8 459494 6080256 291 100 65 149

FL24-005 Dyke 8 459435 6080198 295 93 45 119

FL24-006 Dyke 8 459440 6080115 296 102 45 125

FL24-007 Dyke 1 458332 6079101 280 74 45 248

FL24-008 Dyke 1 458274 6079080 280 73 55 395

FL24-009 Dyke 1 458369 6078943 287 77 55 308

FL24-010 Dyke 1 458369 6078943 287 77 45 287

FL24-011 Dyke 1 458383 6078886 286 76 45 300

FL24-012 Dyke 1 458383 6078886 286 74 55 311

FL24-013 Dyke 1 458323 6078872 288 76 60 449

FL24-014 Dyke 1 458398 6078833 286 75 45 299

FL24-015 Dyke 1 458332 6078826 288 75 55 425

FL24-016 Dyke 1 458349 6078773 287 75 45 395

FL24-017 Dyke 1 458407 6078788 286 75 45 350

FL24-018 Dyke 1 458461 6078856 286 75 45 200

FL24-019 Dyke 1 458322 6078872 288 70 52 350

FL24-020 Dyke 1 458276 6079080 273 95 52 350

FL24-021 Dyke 1 458322 6078873 288 68 52 350

*Data Verification / Quality Assurance and Quality Control

Due to the vertical orientation and variable nature of mineralization at the Company’s Dyke 1

deposit, the reported drill intersection lengths, derived from linear measurements along the drill

core, may not accurately represent the true width of the mineralized zones. Best practice drilling

techniques and geological interpretation were utilized to intersect mineralization in an

orientation that approximates the true width as closely as feasible.

Figure 1: Location of diamond drill holes from the Winter 2024 drill campaign superimposed on magnetic Root-To-

Pole (RPT) geophysical data.

Dyke 1 – Future Potential

The body is still open in all directions indicating potential for continued resource expansion and

subsequent future drill program s. Foremost will be reporting the results of all assays on a

subsequent news release.

Qualified Person

Technical information in this news release has been reviewed and approved by Matthew Carter,

P.Geo., who is a Qualified Person as identified by Canadian National Instrument 43 -101-

Standards of Disclosure for Mineral Projects and as defined by the Securitie s and Exchange

Commission’s Regulation S-K 1300 rules for resource deposit disclosure.

Item 6 Reliance on subsection 7.1(2) or (3) of National Instrument 51-102

N/A

Item 7 Omitted Information

N/A

Item 8 Executive Officer

The following executive officer of the Company is knowledgeable about this report and

the material change disclosed herein:

Jason Barnard, President and CEO

Foremost Lithium Resource & Technology Ltd.

(604) 330-8067

Item 9 Date of Report

May 23, 2024