Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FAN.V ·

FIRST ATLANTIC NICKEL REPORTS HIGHEST AWARUITE (NICKEL-IRON- COBALT ALLOY) DTR GRADES AND RECOVERY TO DATE FROM EXPANSION DRILLING AT PIPESTONE XL NICKEL ALLOY PROJECT Hole AN-25-10 Delivers Highest DTR Nickel Grade and Magnetic Concentrate Performance at RPM

Metallurgy & Processing

FIRST ATLANTIC NICKEL REPORTS HIGHEST AWARUITE (NICKEL-IRON-

COBALT ALLOY) DTR GRADES AND RECOVERY TO DATE FROM EXPANSION

DRILLING AT PIPESTONE XL NICKEL ALLOY PROJECT

Hole AN-25-10 Delivers Highest DTR Nickel Grade and Magnetic Concentrate Performance at RPM

Zone; Company Plans to Announce Additional Drilling Around Hole 10 with Optimized Drilling

Designed to Continue Eastward Expansion Toward Chrome Pond

GRAND FALLS-WINDSOR, Newfoundland and Labrador – (GlobeNewsWire – Dec 2, 2025) – First

Atlantic Nickel Corp. (TSXV: FAN) (OTCQB: FANCF) (FSE: P21) ("First Atlantic" or the "Company") is

pleased to announce Davis Tube Recovery (“DTR”) metallurgical results from Phase 2X drill holes AN-

25-09 and AN -25-10 at the RPM Zone within its Pipestone XL Nickel Alloy Project in central

Newfoundland. Hole AN -25-10 has returned the highest magnetically recoverable nickel grades and

recovery to date at the RPM Zone, averaging 0.15% DTR Ni over 228 meters from 0.22% total nickel,

with 68.62% magnetic recovery. This is calculated from 1.44% nickel in magnetic concentrate with a

10.48% mass pull. The hole, positioned 200 meters east of the Company's previous best result (AN-24-

04: 0.14% DTR Ni over 366 meters), confirms that eastward expansion drilling toward Chrome Pond

continues to deliver above average results. The hole ended in mineralization at 233 meters after

encountering a clay-filled fault zone, and the Company plans to announce additional drilling around Hole

AN-25-10, with optimized drilling designed to penetrate deeper and continue the eastward expansion.

Hole AN-25-10 intersected the highest-grade intervals to date at the RPM Zone, including 0.17% DTR

Ni from 8 meters to 59 meters (51 meters) and 0.16% DTR Ni from 215 meters to 236 meters (21

meters), with up to 2.08% nickel in magnetic concentrate and 99.8% nickel recovery reported from whole

rock assay grades which averaged 0.22% nickel over the entire hole. The Company's current

metallurgical program is based on magnetic separation prior to flotation, leveraging awaruite's unique

magnetic properties. The average 10.48% mass pull further demonstrates that magnetic separation can

reduce the starting rock volume by approximately 90%, concentrating the recoverable nickel into just

10% of the starting mass prior to flotation. The high 68.62% magnetic nickel recovery achieved in Hole

AN-25-10 highlights the favourable performance that awaruite nickel can achieve relative to common

bulk-tonnage nickel sulfide mineralization.

Unlike conventional nickel sulfide minerals such as pentlandite (Fe,Ni) ₉S₈, which contain sulfur, a non-

metallic chemical element that must be removed through secondary processes such as smelting or

roasting prior to the refining stages required to produce nickel sulphate (NiSO4) for EV battery precursor

cathode active materials (pCAM), awaruite (Ni ₃Fe) is a naturally occurring nickel -iron-cobalt alloy that

already exists in a reduced metallic state containing approximately 77% nickel. Composed entirely of

metal elements, awaruite requires no reduction or chemical processing, offering a mine-direct-to-refinery

pathway that bypasses the bottleneck of limited North American smelting capacity, with the potential to

unlock large-scale domestic nickel production for the battery supply chain. The metallurgical program

continues to advance, with mineralogy, recovery, and concentrate testing ongoing. In addition to cobalt

as a byproduct, disseminated chromium occurs with awaruite in all RPM Zone drill holes, and the

Company has expanded its metallurgical program to include chromium as an area of interest for

potential byproduct recovery. The metallurgical program is designed to create a marketable direct-to-

refinery awaruite concentrate containing nickel and cobalt, and the Company is now also evaluating the

potential for a high-grade chromium concentrate. Updates on recovery, separation, and preliminary

concentrate products for nickel, chromium, and cobalt are anticipated in early 2026.

Please call 844-592-6337 or email [email protected] to connect with Rob Guzman, First Atlantic

Nickel's Investor Relations, for questions or more information.

KEY HIGHLIGHTS:

1. Best DTR Nickel Results to Date: Hole AN-25-10 returned 0.15% DTR Ni over 228 meters, the

highest average magnetically recoverable nickel grade to date at the RPM Zone, calculated from

1.44% Ni in magnetic concentrate with a 10.48% mass pull. This represents a 25% increase

over the RPM Zone average of 0.12% DTR Ni (calculated from 1.29% Ni concentrate and 9.25%

mass pull).

2. Highest-Grade Intervals - Open at Depth: Hole AN-25-10 returned 0.17% DTR Ni from 8 to 59

meters (51 m), and 0.16% DTR Ni from 215 to 236 meters (21 m), both the best interval grades

to date. The drill hole stopped in mineralization at 233 meters due to a clay-filled fault zone with

abundant magnetite. Follow-up drilling from new collar locations will test deeper near Hole AN -

25-10.

3. Eastward Drilling Delivers Best Results: Hole AN -25-10, positioned 200 meters east of the

previous best hole (AN-24-04: 0.14% DTR Ni over 366 meters), exceeded that benchmark. The

eastward trend toward Chrome Pond, where historic sampling returned up to 62.2% Cr ₂O₃ -

continues to yield the highest DTR Ni grades on the property.

4. High Nickel Recovery from Awaruite: Hole AN-25-10 achieved 68.62% magnetic nickel

recovery, the best average recovery to date at the RPM Zone. Awaruite (Ni ₃Fe) contains

approximately 77% nickel, or 2-3x the grade of common nickel sulfide minerals, enabling simpler

magnetic concentration with less complicated flotation and supporting higher end-concentrate

grades.

5. Additional Drilling Planned: The Company plans to announce additional drilling around Hole

AN-25-10. Optimized drilling is designed to test deeper and continue expansion eastward. The

eastern extension toward Chrome Pond remains open and is a high priority target.

6. Chromium Co-Product Potential: Chromium occurs with awaruite nickel in all RPM Zone drill

holes, averaging 0.29% Cr and 0.15% DTR chromium. Mineralogy studies are underway to

identify chromium mineral content and assess recovery and concentration potential for a

chromium by-product concentrate.

7. Metallurgical Program Expanding: Mineralogy, recovery, and concentrate testing are ongoing.

Chromite has been identified as the chromium-bearing mineral, and the Company is evaluating

recovery methods and processing options. Updates on recovery, separation, and preliminary

nickel, chromium, and cobalt concentrate products are anticipated in early 2026.

HOLE AN-25-10 DELIVERS BEST RESULTS TO DATE ON EASTERN EXTENSION

Table 01: Pipestone XL Nickel Alloy Project - Summary of Assay Results and DTR Metallurgical Test

Results for Drill Hole AN-25-10 (RPM Zone)

Hole ID

From

(m) To (m)

Interval

(m)

Mass Pull

(%)

Nickel -

Magnetic

Concentrate

Grade

Ni ( %)

Nickel - Total

Grade

Ni (%)

DTR Nickel

Grade -

Magnetically

Recovered Ni (%)

Total

Nickel

Recovery

(%)

Chromium -

Magnetic

Concentrate

Grade

Cr (%)

Chromium

Total

Grade

Cr (%)

DTR

Chromium

Grade -

Magnetically

Recovered

Cr (%)

Cobalt -

Magnetic

Concentrate

Grade

Co (%)

AN-25-10 8 236 228 10.48 1.44 0.22 0.15 68.62 1.54 0.29 0.16 0.05

including 8 59 51 9.47 1.76 0.21 0.17 79.80 1.55 0.29 0.15 0.06

215 236 21 9.21 1.72 0.22 0.16 71.74 1.70 0.29 0.16 0.06

Including "Up To" 15.20 2.08 0.26 0.19 99.80 2.85 0.46 0.33 0.07

Hole AN-25-10 was positioned 200 meters east of Hole AN -24-04, the Company's previous best drill

hole (0.14% DTR Ni over 366 meters), to test the continuation of high-grade mineralization toward

Chrome Pond. The hole returned 0.15% DTR Ni over 228 meters from 0.22% total nickel, with 68.62%

magnetic recovery. This was calculated from 1.44% nickel in magnetic concentrate with a 10.48% mass

pull, exceeding the RPM Zone averages of 1.29% Ni in concentrate and a 9.25% mass pull. This result

represents a 25% increase over the average DTR Ni grade of 0.12% across all previously reported RPM

Zone drill holes.

Hole AN-25-10 intersected the highest-grade intervals to date at the RPM Zone, including 0.17% DTR

Ni from 8 to 59 meters (51 meters) and 0.16% DTR Ni from 215 to 236 meters (21 meters). These

results confirm that the eastern extension of Line Section S1 hosts the best magnetically recoverable

nickel grades reported to date, supported by visual observations of disseminated, large-grain awaruite

mineralization throughout the entire drilled interval.

Drilling was halted at 233 meters after the hole encountered a clay-filled fault zone that caused complete

loss of water circulation and excessive torque on the drill rods. Drill cuttings contained abundant

magnetite that could not be washed from the borehole, preventing further advancement without risking

equipment damage or the drill becoming irretrievably stuck downhole. Although the fault zone required

suspension of drilling, the abundance of magnetite in the drill cuttings is encouraging, as awaruite

commonly forms alongside magnetite during serpentinization. The hole ended in mineralization grading

0.16% DTR Ni over the final 21 meters, confirming continuation of the system at depth. Given the

significance of these results, the Company plans to announce additional drilling around Hole AN-25-10,

with optimized drilling designed to penetrate deeper and continue eastward expansion toward Chrome

Pond.

Figure 01: Cross-sectional view of the RPM Zone Hole AN-24-02 to AN-24-04 and AN-25-10, showing

the distribution of magnetic concentrate and DTR nickel values. Hole AN-25-10 averages 1.44% nickel

and 1.54% chromium in continuous metallurgical DTR magnetic concentrate, with an average 10.48%

Mass Pull and 0.15% DTR nickel over 228 meters.

Table 02: Drill Hole Collar Location Information

Hole ID Easting (UTM) Northing (UTM) Elevation (m) Azimuth (°) Dip (°) Depth (m)

AN-25-09 567517 5358377 219 270 -60 480

AN-25-10 567520 5357575 241 90 -60 233

Figure 02: Drill core from Hole AN-25-10 at 9 meters, showing disseminated awaruite (nickel-iron alloy)

in serpentinized peridotite (top); photomicrographs show awaruite grains up to ~500 microns in size

(bottom).

Figure 03: Drill core from Hole AN -25-10 at 146 meters, showing disseminated awaruite (nickel -iron

alloy) in serpentinized peridotite (top); photomicrographs show awaruite grains up to ~450 microns in

size (bottom).

Figure 04: Drill core from Hole AN -25-10 at 233 meters, showing disseminated awaruite (nickel -iron

alloy) in serpentinized peridotite (top); photomicrographs show awaruite grains up to ~350 microns in

size (bottom).

Hole AN-25-09, located 800 meters north of the discovery drilling on Section S1, was drilled from the

same collar location as Hole AN-25-08 but oriented in the opposite direction. This hole tested westward

toward Pipestone Pond on Section S3 and intersected continuous mineralization over its entire 480-

meter length, returning 0.09% DTR Ni from 0.95% nickel in magnetic concentrate from 42 to 417 meters,

is greater than the 0.06% DTR Ni cutoff grade calculated at the Baptiste awaruite nickel deposit in British

Columbia1.

The westward orientation of AN-25-09, drilled prior to refined structural interpretation, was not optimally

oriented to test the true width of the awaruite-bearing body. Despite this, the hole provided valuable

geological information confirming the westwar d-dipping system, consistent with results from Hole AN -

25-07, which was also drilled westward on Section S2. The successful DTR results from eastward-

oriented holes, compared with the sub-optimal westward orientation of AN-25-07 and AN-25-09, confirm

that eastward-oriented drilling is essential to test the true width of the mineralized body and continues

to deliver the best grades on the property.

Table 03: Pipestone XL Nickel Alloy Project - Summary of Assay Results and DTR Metallurgical Test

Results for Drill Hole AN-25-09 (RPM Zone)

Hole ID

From

(m) To (m)

Interval

(m)

Mass Pull

(%)

Nickel -

Magnetic

Concentrate

Grade

Ni ( %)

Nickel - Total

Grade

Ni (%)

DTR Nickel

Grade -

Magnetically

Recovered Ni (%)

Total

Nickel

Recovery

(%)

Chromium -

Magnetic

Concentrate

Grade

Cr (%)

Chromium

Total

Grade

Cr (%)

DTR

Chromium

Grade -

Magnetically

Recovered

Cr (%)

Cobalt -

Magnetic

Concentrate

Grade

Co (%)

AN-25-09 9 483 474 9.00 0.93 0.23 0.08 36.07 1.61 0.28 0.14 0.06

including 42 417 375 9.03 0.95 0.23 0.09 37.16 1.57 0.26 0.14 0.06

including "Up To" 12.00 1.20 0.26 0.11 45.79 3.94 1.23 0.34 0.08

1 https://fpxnickel.com/news/fpx-nickel-delivers-pfs-for-baptiste-nickel-project-with-after-tax-npv-of-us2-01-billion-and-

18-6-irr/