Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FAN.V ·

First Atlantic Nickel Expands Rpm Zone to 750 Meters IN Width with Second Phase 2 Drill Hole: AN-25-07 Intersects 495 Meters of Visible Awaruite Mineralization

Drill Results

FIRST ATLANTIC NICKEL EXPANDS RPM ZONE TO 750 METERS IN WIDTH WITH SECOND PHASE 2

DRILL HOLE: AN-25-07 INTERSECTS 495 METERS OF VISIBLE AWARUITE MINERALIZATION

Grand Falls-Windsor, Newfoundland – (Globenewswire - September 10, 2025) - First Atlantic Nickel Corp.

(TSXV: FAN) (OTCQB: FANCF) (FSE: P21) ("First Atlantic" or the "Company") is pleased to report a

significant expansion of visible awaruite nickel -alloy mineralization at the RPM Zone, part of its 100% owned,

district-scale, 30 kilometer -long Atlantic Nickel Project in Newfoundland (the "Atlantic Nickel Project" or the

"Project"). RPM Drill hole AN-25-07, the second hole of the Phase 2 program, intersected 495 meters of visibly

disseminated awaruite and has expanded the mineralized section located 400 meters north of the RPM discovery

holes up to 750 meters in width. This represents a ~50% increase from the 500-meter width established in Phase

1, confirming the robust lateral extent of awaruite mineralization at RPM. With holes AN -25-08 and AN -25-09

now completed on Line S3, Phase 2 drilling has tested 800 meters of north-south strike length and continues to

demonstrate the scale potential of the RPM Zone as the Company advances toward defining over 1 kilometer of

continuous awaruite mineralization. Concurrent with drilling, Phase 2 prospecting across the 30-kilometer

Pipestone Ophiolite Complex has collected numerous surface rock samples containing visible awaruite for assay

and davis tube metallurgical testing. Additional updates on the Phase 2 program are anticipated within the

coming weeks.

The sulfur-free nature of awaruite (Ni3Fe), a naturally occurring nickel-iron-cobalt alloy already in metallic form,

eliminates the need for secondary processes such as smelting, roasting or acid leaching that are typical of sulfide

or laterite nickel ores. Unlike sulfides, which are not natural alloys, awaruite avoids the challenge of sourcing

smelter capacity - a bottleneck in North America's nickel supply chain. With an average nickel grade of

approximately 76%, awaruite significantly exceeds the ~25% 1 nickel grade characteristic of pentlandite.

Awaruite's strong magnetic properties enable concentration through magnetic separation, as demonstrated by

Davis Tube Recovery (DTR) testing at First Atlantic's RPM Zone drill core. Awaruite eliminates the elect ricity

requirements, emissions, and environmental impacts associated with conventional smelting, roasting or acid

leaching processes of common nickel minerals. Moreover, awaruite's sulfur-free composition removes the risks

of acid mine drainage (AMD) and related permitting challenges commonly posed by sulfide minerals. 2 pose. As

noted by the United States Geological Survey (USGS) in 2012: "The development of awaruite deposits in other

parts of Canada may help alleviate any prolonged shortage of nickel concentrate. Awaruite, a natural iron-nickel

alloy, is much easier to concentrate than pentlandite, the principal sulfide of nickel."

HIGHLIGHTS:

● AN-25-07 Expands RPM Zone to 750 Meters in Width: The second hole of the Phase 2 drill program

confirms a drilled width up to 750 meters wide of mineralization, with visibly disseminated awaruite grains

observed throughout a 495-meter intersection.

● 400-Meter Step-Out Success: AN-25-07 was drilled on Line S2, a 400-meter step-out north from Line

S1, demonstrating strong continuity of awaruite mineralization along strike.

1 https://fpxnickel.com/projects-overview/what-is-awaruite/

2 https://focs.ca/wp-content/uploads/2012/07/Acid-Mine-Drainage-FNEHIN.pdf

● RPM Zone Now Measures 750 Meters Wide x 400 Meters Long: Every hole drilled at the RPM Zone

has intersected large grain visibly disseminated awaruite, with mineralization now traced to depths of up

to 495 meters downhole.

● Phase 2 Expansion Targeting 1 km+ Strike Length: Holes AN -25-08 and AN -25-09, drilled on Line

S3, have extended the tested north-south strike length to 800 meters. The Phase 2 program is designed

to test beyond 1 kilometer.

● Consistent Metallurgical Performance: To date, drilling at the RPM Zone has returned magnetically

recoverable nickel averaging 1.38% in magnetic concentrate, with a mass pull of 9.08%. This results in

an average DTR nickel grade of 0.12% and overall recovery of 51.59% from an average starting grade

of 0.24% over 1,763 meters of continuously sampled core.

● Multiple Updates Expected: The Company anticipates providing additional updates on Phase 2 drilling

and other project developments in the coming weeks.

For further information, questions, or investor inquiries, please call Rob Guzman at First Atlantic Nickel by

phone at +1 844 592 6337 or via email at [email protected].

"We congratulate our geological team on the breakthrough discovery at the RPM Zone" stated Adrian Smith,

CEO of First Atlantic Nickel. "Prior operators conducting exploration at the Pipestone Ophiolite Complex missed

the awaruite mineralization in the southern parts of the property, where our team's systematic approach and

unique experience recognized both the geological controls and the distinction between surface expressions and

underlying mineralization. Thanks to Newfoundland's streamlined permitting pr ocess, we have advanced from

discovery to Phase 2 drilling significantly faster than would have been possible in many other jurisdictions. Our

geological team's expertise has been instrumental in understanding this 30-kilometer awaruite system - a rare

nickel alloy that offers the potential to provide a nickel source while eliminating the energy consumption,

environmental impacts, and capacity constraints associated with conventional smelting, roasting and acid

leaching processes of nickel sulfide or laterite ores."

AN-25-07 Drill Hole Details

Drill hole AN-25-07 was collared on Line S2, approximately 400 meters north of the Phase 1 discovery holes on

Line S1 (see Figures 4 and 5). The hole successfully intersected 495 meters of serpentinized peridotite hosting

visibly disseminated awaruite (nic kel-iron alloy) mineralization. Microscope analysis and geological logging

confirmed the presence of awaruite grains throughout the intersection, with grain sizes and distribution patterns

visually consistent with those observed in previous RPM drilling. T he hole ended in mineralization, suggesting

potential for additional extensions further to the west and to depth.

The systematic placement of AN -25-07 on section Line S2 was designed to test the northern and western

continuity of the mineralized system identified in Phase 1. The successful intersection not only confirms this

continuity but significantly expands the drilled width of the mineralized zone to more than 750 meters, an increase

of approximately 50% relative to the 500-meter width established in Phase 1. This substantial width, combined

with the consistent presence of visible awaruite, highlights the potential for a significant volume of bulk -tonnage

style nickel mineralization at the RPM Zone.

Figure 1: Drill core photograph of hole AN -25-07 at 97 meters showing disseminated awar uite nickel -alloy

mineralization (top), with microscope images of awaruite grains up to 647 microns (bottom). Awaruite, a rare,

highly magnetic, and ductile nickel-alloy can be seen disseminated within serpentinized ultramafic rocks present

over significant areas on the Atlantic Nickel Project.

Figure 2: Drill core photograph from hole AN -25-07 at 245 meters showing disseminated awar uite nickel-alloy

mineralization (top), with microscope images of awaruite grains up to 311 microns in size (bottom). Awaruite, a

rare, highly magnetic, and ductile nickel -alloy can be seen disseminated within serpentinized ultramafic rocks

present over significant areas on the Atlantic Nickel Project.

Figure 3: Drill core photograph of hole AN -25-07 at 354 meters showing disseminated awar uite nickel -alloy

mineralization (top), with microscope images of awaruite grains up to 236 microns (bottom). Awaruite, a rare,

highly magnetic, and ductile nickel-alloy can be seen disseminated within serpentinized ultramafic rocks present

over significant areas on the Atlantic Nickel Project.

Figure 4: Cross section image showing the location of AN -25-07, with results pending, extending the zone of

visibly disseminated nickel-alloy mineralization westwards.

Figure 5: RPM Zone drill map showing Phase 2 drilling, with a summary of drilling results to date. Drill holes AN-

25-07, AN-25-08, and AN-25-09 currently being processed, with updates anticipated shortly.

Figure 6: Phase 2 drill cores at the Atlantic Nickel Project.

RPM Zone Overview

The RPM Zone has rapidly emerged as a breakthrough discovery within First Atlantic's 30-kilometer Atlantic

Nickel Project. Located 10 kilometers south of the Super Gulp Zone and 26 kilometers south of the historic

Atlantic Lake Zone, RPM represents a signi ficant discovery of awaruite mineralization within this district-scale

ultramafic belt. Metallurgical test work, including Davis Tube Recovery (DTR), has averaged 1.38% nickel in

magnetic concentrate across all holes completed to date, indicating that the mineralization is amenable to simple

magnetic separation processing.

The expanding footprint of the RPM Zone now measures approximately 750 meters in width by 400 meters in

length and remains open in all directions. The consistency of both visual mineralization and metallurgical

recovery suggests the potential for a large-s cale, bulk-tonnage awaruite nickel target that could be processed

without conventional smelting, aligning with the Company's vision of establishing a clean, onshore North

American nickel supply chain.

Phase 2 Drilling Update

Phase 2 drilling is expanding the mineralized footprint of the RPM Zone. Hole AN-25-07 has proven 750 meters

in width identified with visible awaruite mineralization. With holes AN -25-08 and AN-25-09 now completed, the

RPM Zone has been drilled more than 800 meters in north-south strike length.