Excellon Reports Fourth Quarter and Annual 2022 Financial Results and Provides Corporate Update

Financials

www.excellonresources.com

EXCELLON REPORTS FOURTH QUARTER AND ANNUAL 2022 FINANCIAL RESULTS

AND PROVIDES CORPORATE UPDATE

Toronto, Ontario – April 3 , 2023 – Excellon Resources Inc. (TSX:EXN, OTCQB:EXNRF and FRA:E4X2)

(“Excellon” or the “Company”) is pleased to report financial results for the three- and twelve-month periods

ended December 31, 2022.

2022 Financial and Operational Highlights (compared to 2021)

• Identified remnants, pillars and stopes which extended Platosa production into October 2022.

• Safely wound down operations at Platosa and Miguel Auza in Q4 2022, and transitioned to care-and-

maintenance.

• Settled termination benefits with over 70% of the unionized and 80% of the non -unionized workforce

in Mexico. The remaining non-unionized employees have been retained for care -and-maintenance

activities and potential transfer to the La Negra Mine.

• Drilled six diamond drill holes totaling 2,145 metres at Kilgore, with assay results pending for five of the

six drill holes. For further details see the Company’s news release dated December 6, 2022.

• Q4 2022 and 2022 results were impacted by the wind-down of production in Q4 2022.

• AgEq production of 1,517,940 oz (2021 – 2,017,639 oz), including:

o Silver production of 891,185 oz (2021 – 1,222,991 oz)

o Lead production of 4.6 million lb (2021 – 7.6 million lb)

o Zinc production of 5.4 million lb (2021 – 9.0 million lb)

• AgEq ounces payable sold of 1,370,132 AgEq ozs (2021 – 1,810,199 ozs)

• Production cost per tonne decreased of $261 per tonne (2021 – $291 per tonne)

• Total cash cost net of by-products per silver ounce payable of $11.80 (2021 – $13.01)

• AISC per silver ounce payable of $18.31 (2021 – $24.78)

• The Company will be reversing the US$22 million provision for litigation f rom its March 31, 2023

consolidated balance sheet as a result of the Mexican Bankruptcy Court declaring one of its care-and-

maintenance subsidiaries bankrupt effective March 28, 2023 . For further details see the Company’s

concurrently announced separate news release.

Financial Results

Financial results for the periods indicated below were as follows:

(‘000s of USD, except amounts per share and per ounce) Q4 2022 Q4 2021 2022 2021

Revenue

(1)

2,564 9,306 25,824 37,955

Production costs (2,055) (7,089) (18,055) (25,472)

Mine closure related costs (375) (1,584) (907) (735)

Depletion and amortization (1,127) (1,928) (7,497) (7,300)

Cost of sales (3,557) (10,601) (26,459) (33,507)

Gross (loss) profit (993) (1,295) (635) 4,448

General and administrative including care-and-maintenance (1,940) (1,255) (5,721) (6,689)

Exploration and holding expense (1,277) (1,783) (5,576) (7,194)

Other income (expense) 325 89 1,111 (758)

Provision for litigation - (5) - (22,282)

- 2 -

(‘000s of USD, except amounts per share and per ounce) Q4 2022 Q4 2021 2022 2021

Impairment losses (3,344) (15,788) (3,344) (16,540)

Net finance expense (1,208) (1,242) (4,294) (3,680)

Income tax expense (185) (167) (379) (5,078)

Net loss (8,622) (21,446) (18,838) (57,773)

Adjusted net loss (2) (4,903) (4,069) (14,591) (14,311)

Loss per share – basic and diluted (0.23) (0.65) (0.54) (1.77)

Adjusted loss per share – basic and diluted (2) (0.13) (0.12) (0.42) (0.44)

Cash flow from operations (3) (1,386) (217) (1,167) 1,652

Production cost per tonne (4) 261 314 261 291

Cash cost per silver ounce payable net of by-products ($/Ag oz) 16.28 15.61 11.80 13.01

AISC per silver ounce payable ($/Ag oz) (5) 30.19 24.82 18.31 24.78

Realized prices: (6)

Silver – ($US/oz) 18.99 23.30 21.13 25.12

Lead – ($US/lb) 0.88 1.06 0.96 1.00

Zinc – ($US/lb) 1.36 1.53 1.64 1.37

(1) Revenues are net of treatment and refining charges (“TC/RCs”).

(2) Adjusted loss and adjusted loss per share exclude: for 2021 , $22.3 million related to the Provision for litigation, the related $0.8 million

impairment loss and $3.1 million deferred -tax asset derecognition expenses and for Q4 2021, impairment losses of $15.8 million and $1.6

million related to future mine closure accruals. For 2022, $0.5 million write-down of materials and supplies and for Q4 2022 , impairment

losses of $3.3 million and $0.4 million related to the write-down of materials and supplies.

(3) Cash flow from operations before changes in working capital.

(4) Production cost per tonne includes mining and milling costs, excluding depletion and amortization, materials and supplies write-down, and

inventory adjustments.

(5) AISC per silver ounce payable excludes administrative and share-based payment costs attributable to the Company’s non-producing projects

and includes underground drilling costs.

(6) Average realized price is calculated on current period sale deliveries and does not include the impact of prior period provisional

adjustments in the period.

This news release should be read in conjunction with the Company’s consolidated financial statements for

the years ended December 31 , 2022 and 2021 (“Financial Statements ”), and associated management

discussion and analysis (“ MD&A”) which are available on the Company’s website at

www.excellonresources.com and under the Company’s profile on SEDAR (www.sedar.com).

All financial information is prepared in accordance with IFRS, and all dollar amounts are expressed in U.S.

dollars unless otherwise specified. The discussion of financial results in this news release includes references

to “cash flow from operations before changes in working capital items”, “production cost per tonne”, “cash

cost per silver ounce payable”, and “AISC per silver ounce payable”, which are non -IFRS performance

measures. The Compan y presents these measures to provide additional information regarding the

Company’s financial results and performance. Please refer to the Company’s MD&A, for a reconciliation of

these measures to reported IFRS results.

Operating Results

Operating performance for the periods indicated below was as follows:

Q4 Q4

2022(2) 2021 2022(2) 2021

Tonnes Mined: 3,047 20,954 63,279 85,530

Tonnes Milled: 4,965 21,309 65,784 86,021

- 3 -

Q4 Q4

2022(2) 2021 2022(2) 2021

Grades:

Silver (g/t) 512 438 464 494

Lead (%) 4.31 4.65 4.27 5.01

Zinc (%) 3.62 5.50 4.51 6.03

Recoveries:

Silver (%) 93.2 90.5 90.9 89.5

Lead (%) 75.3 78.5 75.2 80.0

Zinc (%) 77.1 83.7 81.6 79.0

Metal Production: (1)

Silver – (oz) 76,219 271,525 891,185 1,222,991

Lead – (lb) 355,536 1,717,525 4,641,708 7,612,332

Zinc – (lb) 304,975 2,167,840 5,358,103 9,014,028

Silver equivalent (“AgEq”) (oz) (3) 114,536 492,013 1,517,940 2,017,639

Payable:

Silver – (oz) 75,728 287,953 827,618 1,141,281

Lead – (lb) 328,871 1,762,293 4,291,803 7,073,488

Zinc – (lb) 449,325 1,697,098 4,477,550 7,101,992

AgEq (oz) (3) 123,147 479,566 1,370,132 1,810,199

(1) Period deliveries remain subject to assay and price adjustments on final settlement with concentrate purchaser. Data has been adjusted to

reflect final assay and price adjustments for prior-period deliveries settled during the period.

(2) The production results for the year ended December 31, 2022 were impacted by the wind down of production at Platosa in early Q4 2022.

(3) AgEq ounces established using average realized metal prices during the respective period applied to the recovered metal content of the

concentrates to calculate the revenue contribution of base metal sales during the period.

In early Q4 2022, production cease d at the Platosa Mine and Miguel Auza mill and the sites were

transitioned into care-and-maintenance.

For further details on operating results for the three and twelve-month periods ended December 31, 2022,

refer to the Company’s Financial Statements and MD&A for the same period.

Corporate Update

On January 9, 2023, the Company announced it had entered into a definitive acquisition agreement to

acquire the permitted, past -producing La Negra Mine in Mexico. The Company is continuing to take steps

necessary to advance the acquisition and discussions with potential investors in the equity offering

proposed to be completed in connection with the acquisition. The required meeting of Excellon

shareholders to approve the issuances of Excellon common shares contemplated by the acquisition

(including pursuan t to the closing equity offering and restructuring of the Company’s outstanding

debentures) and, in turn, completion of the acquisition, are now expected to occur no later than end of June

(as opposed to the previously announced April target date s), subject to the successful completion of the

proposed equity offering and receipt of conditional listing approval of the Toronto Stock Exchange in respect

of the acquisition and related matters. The Company is in discussions with the seller regarding the proposed

timeline for the shareholder meeting and completion of the acquisition. The Company continues to strongly

believe in the forward-looking value proposition of the La Negra acquisition to Excellon and its shareholders

and remains optimistic that the a cquisition and related transactions (including the closing equity offering)

can be successfully completed in due course.

In addition, the Company is considering various other potential financing, corporate development and

strategic opportunities that may include acquisitions, divestitures, mergers or spin-offs of the Company’s or

third parties’ assets, as applicable, to compliment the Company’s go-forward strategy.

- 4 -

About Excellon

Excellon’s vision is to realize opportunities for the benefit of our employees, communities and shareholders,

through the acquisition of advanced development or producing assets with further potential to gain from

an experienced operational management team . The Company is advancing a portfolio of gold, silver and

base metals assets including Kilgore, an advanced gold exploration project in Idaho; and Silver City, a high -

grade epithermal silver district in Saxony, Germany with 750 years of mining history an d no modern

exploration. The Company has also entered into an agreement to acquire La Negra, a past-producing Ag-Zn-

Cu-Pb mine with exploration potential, located in Querétaro State, Mexico.

Additional details on Excellon’s properties are available at www.excellonresources.com.

For Further Information, Please Contact:

Excellon Resources Inc.

Shawn Howarth, President & Chief Executive Officer

Daniel Hall, Chief Financial Officer

[email protected]

www.excellonresources.com

CAUTIONARY STATEMENTS ON FORWARD-LOOKING STATEMENTS AND OTHER MATTERS

Forward-Looking Statements

All statements, other than statements of historical fact, contained or incorporated by reference in this news release

constitute “forward -looking statements” and “forward looking information” (collectively, “ forward-looking

statements”) within the meaning of applicable Canadian and United States securities legislation. Generally, these

forward-looking statements can be identified by the use of forward-looking terminology such as: “acquire”, “accrual”,

“advance”, “anticipates”, “alternatives”, “believe”, “closure”, “conditional”, “considering”, “contemplate d”,

“contingencies”, “continu ing”, “could”, “demonstrated”, “development”, “due course”, “evaluate”, “expected”,

“exploration”, “estimate”, “focus”, “forward-looking”, “further”, “future”, “goals”, “go-forward”, “indicated”, “initial”,

“later”, “launch”, “may”, “modelling”, “near”, “occur”, “opportunities”, “optimistic”, “option”, “pending”, “pipeline”,

“pivot”, “planning”, “position”, “potential”, “program”, “project”, “proposed”, “proposition”, “prospects”, “provide”,

“provision”, “review”, “reversing”, “risk”, “should”, “strateg y”, “study”, “subject to”, “target”, “testing”, “timeline”,

“uncertainties”, “viability”, “vision”, “will” and “would”, or variations of such words, and similar such words, expressions

or statements that certain actions, events or results can, could, may, should, wi ll (or not) be achieved, occur, provide,

result or support in the future or which, by their nature, refer to future events. In some cases, forward -looking

information may be stated in the present tense, such as in respect of current matters that may be co ntinuing, or that

may have a future impact or effect. Forward -looking statements include statements regarding potential financing,

corporate development, strategic and other opportunities; strategic alternatives (including any form, aspect, value or

other impacts thereof); advancing a portfolio of assets; the La Negra acquisition and its related transactions including

the proposed equity offering (including discussions with potential investors) (collectively, the “La Negra Transactions”)

and completion thereof (including timing thereof and discussions related to such timelines ) and benefits thereof

(including value proposition, quantum and use of proceeds of any equity offering); restart of mining operations and/or

commercial production at La Negra mineral property closure (including accruals,, costs and provisions, and timing

thereof); the bankruptcy of one of the Company’s Mexican subsidiaries in care-and-maintenance (including reversal of

provisions and/or the other liabilities relating to such subsidiary); and any benefits or any other implications of any of

the foregoing. Although the Company believes that such statements are reasonable, it can give no assurance that such

expectations will prove to be correct, and any forward-looking statements by the Company are not guarantees of future

actions, results or performance. Forward -looking statements are based on assumptions, estimates, expectations and

opinions, which are considered reasonable and represent best judgment based on available facts, as of the date such

statements are made. If such assumptions, estimates, expectations and opinions prove to be incorrect, actual and

future results may be materially different than expressed or implied in the forward-looking statements. The estimates,

- 5 -

expectations and opinions referenced or contained in this news release which may prove to be incorrect, are subject to

a number of assumptions which include those set forth or referenced herein as well as Management’s Discussion &

Analysis of Financial Results for year ended December 31, 2022 (together with the accompanying financial statements

for the same period, the “2022 Financial Disclosure”); the Company’s Annual Information Form dated March 31, 2023

(the “AIF”); the current technical reports for the Company’s projects and the La Negra Mine (collectively, the “Technical

Reports”); the Company’s news releases announcing the pending La Negra acquisition on January 9, 2023 and the

bankruptcy of its Mexican subsidiary dated April 3, 2023 (collectively, the “ Referenced News Releases ”), and the

Company’s other applicable public disclosure (collectively, “ Company Disclosure”), all available under the Company’s

profile on SEDAR (www.sedar.com) and/or on its website at www.excellonresources.com. Forward-looking statements

are inherently subject to known and unknown risks, uncertainties, contingencies and other factors which may cause the

actual results or performance of the Company to be materially different from any future results or performance

expressed or implied by the forward -looking statements. Such risks, uncertainties, contingencies and oth er factors

include, among others, the timing, completion or non -completion of the La Negra Transactions, including due to the

parties failing to receive, in a timely manner and on satisfactory terms, commitments in respect of the proposed equity

financing (or alternative financing), and the necessary securityholder, Toronto Stock Exchange and other approvals or

the inability of the parties to satisfy or waive in a timely manner the other conditions to the closing, conditions precedent

or covenants, as applicable, of the La Negra Transactions and the inability to complete such transactions; inability to

achieve the benefits, synergies or value proposition anticipated from the La Negra Transactions; variations in mineral

resources, mineral production, grades or recovery rates; the accuracy of the results, conclusions and recommendations

of summarized in the Technical Reports; delays in obtaining financing or in the completion of development or

construction activities; uninsured risks production, construction and technological risks related to Excellon and La

Negra; capital requirements and operating risks associated with the operations or an expansion of the operations of

Excellon including La Negra; dilution due to the La Negra Transactions and any other future equity financing;

fluctuations in silver, lead, zinc, copper, gold and other precious metal prices and currency exchange rates; uncertainty

relating to future production and cash resources; inability to successfully restart La Negra or other projects within the

timelines and at the cost anticipated; adverse changes to market, political and general economic conditions or laws,

rules and regulations applicable to Excellon and La Negra; the possibility of project cost overruns or unanticipated costs

and expenses; accidents, labour disputes, community and stakeholder protests and other risks of the mining industry;

risk of an undiscovered defect in title or other adverse claim; as well as the “Risk Factors” in the AIF, and the risks,

uncertainties, contingencies and other factors identified in the 2022 Financial Disclosure, the Technical Reports, the

Referenced News Releases and other applicable Company Disclosure. The foregoing list of risks, uncert ainties,

contingencies and other factors is not exhaustive; readers should consult the more complete discussion of the

Company’s business, financial condition and prospects that is provided in the AIF and the other aforementioned

Company Disclosure. Altho ugh Excellon has attempted to identify important factors that could cause plans, actions,

events or results to differ materially from those described in forward -looking statements in this news release and the

other Company Disclosure referenced herein, there may be other factors that cause plans, actions, events or results not

to be as anticipated, estimated or intended. There is no assurance that such statements will prove to be accurate as

actual plans, results and future events could differ materially from those anticipated in such statements or information.

Accordingly, readers should not place undue reliance on forward -looking statements in this news release, nor in the

documents incorporated by reference herein. Readers are cautioned not to place undue reliance on forward -looking

statements. The forward -looking statements referenced or contained in this news release are expressly qualified by

these Cautionar y Statements as well as the Cautionary Statements in the 2022 Financial Disclosure, the AIF, the

Technical Reports, the Referenced News Releases and other applicable Company Disclosure. Forward -looking

statements contained herein are made as of the date of this news release (or as otherwise expressly specified) and the

Company disclaims any obligation to update any forward-looking statements, whether as a result of new information,

future events or results or otherwise, except as required by applicable laws.

Mineral Resources

Until mineral deposits are actually mined and processed, mineral resources must be considered as estimates only.

Mineral resource estimates that are not classified as mineral reserves do not have demonstrated economic viability.

The estimation of mineral resources is inherently uncertain, involves subjective judgement about many relevant factors

and may be materially affected by, among other things, environmental, permitting, legal, title, taxation, socio-political,

marketing, or other relevant risks, uncertainties, contingencies and other factors described in the foregoing Cautionary

- 6 -

Statements on Forward-Looking Statements. The quantity and grade of reported “inferred” mineral resource estimates

are uncertain in nature and there has b een insufficient exploration to define “inferred” mineral resource estimates as

an “indicated” or “measured” mineral resource and it is uncertain if further exploration will result in upgrading

“inferred” mineral resource estimates to an “indicated” or “measured” mineral resource category. The accuracy of any

mineral resource estimates is a function of the quantity and quality of available data, and of the assumptions made

and judgments used in engineering and geological interpretation, which may prove to b e unreliable and depend, to a

certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate.

The quantity and grade of “inferred” mineral resource estimates are uncertain in nature and there has been insufficient

exploration to define “inferred” mineral resource estimates as an “indicated” or “measured” mineral resource and it is

uncertain if further exploration will result in upgrading “inferred” mineral resource estimates to an “indicated” or

“measured” mineral resource category. Mineral resource estimates may have to be re -estimated based on, among

other things: (i) fluctuations in mineral prices; (ii) results of drilling and development; (iii) results of geological and

structural modeling including stope design; (iv) metallurgical testing and other testing; (v) proposed mining operations

including dilution; and (vi) the possible failure to receive and/or maintain required permits, licenses and other

approvals. It cannot be assumed that all or a ny part of a “inferred”, “indicated” or “measured” mineral resource

estimate will ever be upgraded to a higher category including a mineral reserve.

Mineral resource estimates disclosed by the Company were estimated and reported in accordance with National

Instrument 43 -101 of the Canadian Securities Administrators (“ NI 43 -101”) using Canadian Institute of Mining,

Metallurgy and Petroleum (“ CIM”) Definition Standards for Mineral Resources and Mineral Reserves (the “ CIM

Standards”), which govern the public disclosure of scientific and technical information concerning mineral projects by

Canadian issuers such as Excellon , and applying the CIM’s Mineral Resources and Mineral Reserves Best Practices

guidelines (as applicable) . For additional discussion o f the Company’s mineral resource estimates at the Company’s

projects and La Negra, as well as an overall more detailed discussion of such projects, the reader should refer to the AIF

and the applicable Technical Reports.

U.S. Readers

The terms “mineral resource”, “measured mineral resource”, “indicated mineral resource” and “inferred mineral

resource” as disclosed by the Company are Canadian mining terms defined in the CIM Standards (collectively, the “CIM

Definitions”) in accordance with NI 43 -101. NI 43-101 establishes standards for all public disclosure that a Canadian

issuer makes of scientific and technical information concerning mineral projects. These Canadian standards differ from

the requirements of the SEC applicable to United States do mestic and certain foreign reporting companies under

Subpart 1300 of Regulation S -K (“S-K 1300”). Accordingly, information describing mineral resource estimates for the

Company’s projects and La Negra, may not be comparable to similar information publicly reported in accordance with

the applicable requirements of the SEC, and so there can be no assurance that any mineral resource estimate for the

Company’s projects or La Negra would be the same had the estimates been prepared per the SEC’s reporting and

disclosure requirements under applicable United States federal securities laws, and the rules and regulations

thereunder, including but not limited to S -K 1300. Further, there is no assurance that any mineral resource or mineral

reserve estimate that the Comp any may report under NI 43 -101 would be the same had the Company prepared such

estimates under S-K 1300.

Preliminary Economic Assessments (or PEAs)

A PEA, including the La Negra PEA, is only a conceptual study of the potential viability of the subject proj ect’s mineral

resource estimates, and the economic and technical viability of the project and its estimated mineral resources has not

been demonstrated. A PEA is preliminary in nature and provides only an initial, high-level review of the subject project’s

potential and design options; there is no certainty that a PEA will be realized. The conceptual LOM plan and economic

model in a PEA include numerous assumptions and mineral resource estimates including inferred mineral resource

estimates. Inferred mineral resource estimates are considered to be too speculative geologically to have any economic

considerations applied to such estimates. Under NI 43 -101, estimates of inferred mineral resources may not form the

basis of feasibility studies, pre -feasibility studies or other economic studies, except in prescribed cases, such as in a

preliminary economic assessment under certain circumstances. There is no guarantee that inferred mineral resource

estimates will be converted to indicated or measured mineral resourc es, or that indicated or measured mineral

resources can be converted to mineral reserves. Mineral resources that are not mineral reserves do not have

- 7 -

demonstrated economic viability, and as such there is no guarantee the economics described in any PEA, including the

La Negra PEA, will be achieved. Mineral resource estimates may be materially affected by environmental, permitting,

legal, title, taxation, socio -political, marketing, or other relevant risks, uncertainties and other factors, as more

particularly described in the foregoing other Cautionary Statements of this MD&A.

Qualified Persons

Mr. Paul Keller, P. Eng., Chief Operating Officer of the Company and a Qualified Person as defined in NI 43‐101 (a “QP”),

reviewed, verified and approved the scientific and technical information relating to operations and production results

contained in this news release. Mr. Jorge Ortega, M.Sc., P.Geo., Vice President Exploration of the Company and a QP,

reviewed, verified and approved the scientific and technical information relating to geological interpretation and results

contained in this news release.