EVNI.V ·

EV Nickel Defines Resource Estimate at CarLang's A Zone, 1.25m Indicated and 1.16m Inferred Tonnes of Contained Nickel- A Zone Represents First 20% of the Full CarLang

Corporate Updates

EV Nickel Defines Resource Estimate at

CarLang's A Zone, 1.25m Indicated and

1.16m Inferred Tonnes of Contained Nickel-

A Zone Represents First 20% of the Full

CarLang

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR TO US WIRE

SERVICES

• Defined a resource which puts it into the league of the largest undeveloped nickel

deposits in the world1

• A Zone Resources total 1.0B tonnes, averaging 0.24% Ni and 0.0107 ppm Co (0.12%

NiEq cut-off), split between:

o Higher Grade Core with 290M tonnes at 0.27% Ni Indicated and 203M tonnes at

0.27% Ni Inferred.

o Lower Grade with 219M tonnes at 0.22% Ni Indicated and 294M tonnes at 0.21%

Ni Inferred.

• The contained nickel defined in the CarLang A Zone is roughly equivalent to the nickel in

~34M Electric Vehicles.

• CarLang A Zone represents just 20% of the full 10 km-long CarLang Area Trend.

• Analysis continues to review the Integrated Carbon Capture and Storage potential for

CarLang.

• EV Nickel management will host a live digital event this Friday, March 3rd at 11 am ET,

to discuss the Maiden Resource Estimate for the CarLang A Zone. The event will be

accessible through https://my.6ix.com/uo6AqxjD

TORONTO, ON / February 28, 2023 / EV NICKEL INC. (TSXV:EVNI) ("EVNi" or the

"Company") today announced a maiden mineral resource estimate for the "A Zone", part of its

large-scale nickel target in the northeast of its Shaw Dome Project, referred to as the Carman-

Langmuir or, "CarLang Area" (the "Property") (Figure 1). A Technical Report in support of the

Mineral Resource Estimate will be filed on SEDAR (www.sedar.com) within 45 days. The

Mineral Resource Estimate is effective as of February 27, 2023.

After acquiring the Property in April 2022 (see News Release dated April 4, 2022), EVNi

launched a diamond drilling program (28 holes totalling 8,295 m) to complete a maiden mineral

resource estimate in accordance with National Instrument 43-101 ("NI 43-101") which shows

Indicated Resources of 1.25M tonnes or 2.8B pounds of contained nickel and Inferred Resources

of 1.16M tonnes or 2.6B pounds of contained nickel (Table 1).

"Defining this enormous Maiden Mineral Resource for our Large Scale A Zone is a major

milestone for EV Nickel," said Sean Samson, President & CEO. "The A Zone is just the

beginning of the CarLang Area because we know the host units have been identified over

approximately 5 times the strike length. So if we consider the full potential of the CarLang

Trend- this is the type of generational opportunity, which is near surface and in an excellent

location, that the world needs for a supply of Clean Nickel™ to help fuel the energy transition."

1. The independent Qualified Person for the Mineral Resource Estimate, as defined by NI

43-101, is Simon Mortimer (FAIG #4083), of Atticus Geoscience Consulting. The

effective date of the Mineral Resource Estimate is February 27, 2023.

2. These Mineral Resources are not Mineral Reserves as they do not have demonstrated

economic viability. The quantity and grade of reported Inferred Resources in this Mineral

Resource Estimate are uncertain in nature and there has been insufficient exploration to

define these Inferred Resources as Indicated or Measured. However, it is reasonably

expected that the majority of Inferred Mineral Resources could be upgraded to Indicated

Mineral Resources with continued exploration.

3. Mineralised domains were based on lithological contacts and a cut-off grade of 0.25% Ni

was used to define the high-grade domain. This threshold was determined through

analysis of the distribution of nickel grade within the drill core lithologies.

4. Geological and block models for the Mineral Resource Estimate used data from a total of

28 surface drill holes. The drill hole database was validated prior to resource estimation

and QA/QC checks were made using industry-standard control charts for blanks, core

duplicates and commercial certified reference material inserted into assay batches by EV

Nickel.

5. Estimates have been rounded to two significant figures.

6. The mineral resource estimates have been constrained by conceptual pit envelopes using

the following optimization parameters. Metal prices used (US$) were $8.00/lb for nickel,

and $23/lb for cobalt. An overall pit slope of 45 degrees was used. Mining and processing

costs (US$) were based on benchmarking from similar deposit types in the area, utilising

a mining cost of 3.5$/t, a processing cost of 4.5$/t, a G&A cost of 2.5$/t, and a selling

cost of 0.8$/lb.

7. The Mineral Resource Estimate was prepared following the CIM Estimation of Mineral

Resources & Mineral Reserves Best Practice Guidelines (November 29, 2019).

8. The geological model as applied to the Mineral Resource Estimate comprises of a

mineralized domain hosted by variably serpentinized ultramafic rocks with a domain of

relatively higher-grade material within the core of the unit. Individual wireframes were

created for each domain.

9. The block model was prepared using Micromine 2020. A 20 m x 20 m x 15 m block

model was created and samples were composited at 7.5 m intervals. Grade estimation

from drill hole data was carried out for Ni, Co, Fe, S, using Ordinary and Dual Kriging

interpolation method.

10. Grade estimation was validated by comparison of input and output statistics (Nearest

Neighbour and Inverse Distance Squared methods), swath plot analysis, and by visual

inspection of the assay data, block model, and grade shells in cross-sections.

11. Density estimation was carried out for the mineralized domains using the Ordinary

Kriging interpolation method, on the basis of 941 specific gravity measurements

collected during the core logging process, using the same block model parameters of the

grade estimation. As a reference, the average estimated density value within the higher-

grade is 2.68 g/cm3 (t/m3), while low-grade domains of the resource model yielded

averages of 2.77 g/cm3 (t/m3).

For context- equivalent number of EVs in the Resource's Contained Nickel

It is estimated that the average electric vehicle battery requires ~145 pounds of nickel

(Bloomberg New Energy Finance ("BNEF") estimate, for 100kWh battery2) and based on this,

the Contained Nickel in this Maiden Resource represents the equivalent nickel which would be

used in roughly 34M electric vehicles. For comparison, BNEF forecasts that roughly 21M

electric vehicles will be sold globally in 2025 (BNEF's Economic Transition Scenario, which

assumes no new policies and regulations are enacted, is primarily driven by techno-economic

trends and market forces).

Potential for the Full CarLang area- extends over 10 km along strike

The Company believes the CarLang Area has a massive amount of potential mineralization,

hosted in nearly continuous units of dunite and peridotite. The CarLang's potential for hosting

similar mineralization extends well beyond the A Zone and this is supported by publicly

available historical analysis and exploration results. Outcrop and grab sample analysis (see

Figure 2), in addition to historical drilling (see Figure 3) confirm that the CarLang Area contains

more than a 10km long trend within EVNi's Property boundaries. Specific geological boundaries

are defined by government geology map interpretations of outcrop exposure and geophysical

surveys which estimate the potential dimensions of the dunite/peridotite units (used in Figures 2

& 3).

In combination, the publicly available historical analysis supports the thesis that the host units

on the EVNi-controlled portion of the CarLang is likely more than 5 times larger than the drill

defined A Zone.

Integrated Carbon Capture and Storage potential for CarLang

The mineralization of the CarLang Area is hosted in ultramafic rock, which naturally absorbs and

sequesters CO2. The potential to actively capture and sequester carbon is a key part of EVNi's

interest in this Large -Scale mineralization and the Company believes i t will be a key part of its

Clean Nickel ™ Strategy.

EVNi is now working with leading consultants on various streams of research and development,

primarily coordinated through The EPCM Group, a global engineering firm based out of Oakville,

Ontario. Regarding the Carbon Capture and Storage, EPCM is now working with Arca (based in

Vancouver, BC, formerly known as "Carbin Minerals"), global leaders in the space. Arca was co-

founded by Professor Greg Dipple and other geoscientists from the University of British Columbia,

Arca has developed technologies that accelerate a natural geochemical process called carbon

mineralization and have received recognition for their innovation including investment -

highlighted in 2022 by wining a $1 million milestone award from XPrize and the Musk

Foundation.

EV Nickel believes that the CarLang Area hosts Clean Nickel ™ that can help fuel the energy

transition but recognizes it will need to aggressively innovate to make this a reality. Part of this

innovation is to gain a full un derstanding of the Carbon Capture and Storage potential and

integrating the full benefit with any future CarLang nickel production.

Drill Data Detail

EV Nickel's Phase 3 Drill Program targeted the Large Scale potential of the CarLang A Zone and

was completed in the Summer of 2022. The preliminary resource estimate consists of a total of 28

holes and 8,295 m (see Tables 2 & 3 and Figure 4). The CarLang A Zone is defined across a strike

length of 1.6 km, a width of between 350 to 550 metres. Both higher grade and lower grade nickel

mineralization extends below 250 metres vertical depth with a number of holes bottoming in both

the higher grade and lower grade mineralization.

Table 2 -Shaw Dome Project's CarLang A Zone Drill Holes- Assay Results

Table 3 -Shaw Dome Project's CarLang A Zone Drill Holes- Locations and Depths