Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EVER.V ·

Evergold Drills a New Sulphide Vein System at the DEM Au-Cu-Ag Prospect, Central B.C., Assays Pending

Drill Results

Evergold Drills a New Sulphide Vein System at the DEM Au-Cu-Ag Prospect,

Central B.C., Assays Pending

TORONTO, Nov. 21, 2023 -- Evergold Corp. (TSX-V: EVER, WKN: A2PTHZ) (“Evergold” or the “Company”) is pleased to

report that first-ever drilling at the Company’s road-accessible DEM prospect, located in central B.C., has concluded on time,

under budget and on target for a total of 947 metres drilled in three holes from two pads located 350 metres apart. Two holes

(DEM23-01 & 02) were drilled due east from the first pad, and a single hole (DEM23-03) was drilled due west from the second

(see Figure 1 plan and Figure 2 section views). Each of the three holes intercepted variably calcareous fine-grained

sedimentary rocks cut locally by metre-scale porphyritic dykes, with the host rocks, and locally the dykes, strongly infused

over core lengths of up to 20 metres by cross-cutting sulphide-bearing veinlets and veins, locally of semi-massive to massive

character, along with associated disseminated sulphides. These intervals are also encompassed by broader halos of lower-

intensity disseminated and sulphide-bearing veinlets and veins. Sulphide minerals observed in core include abundant

disseminated and vein-hosted arsenopyrite, pyrite, and pyrrhotite, with lesser but significant sphalerite, galena, chalcopyrite,

and molybdenite. Sulphosalts are also commonly observed. Core cutting and sampling is underway, with assaying to follow.

Laboratory results are anticipated for early in the new year.

“Caution is in order until we receive assay results,” said Kevin Keough, President & CEO. “That said, we are very happy with

what we’ve seen in core from this very limited first-ever drill program on a new grassroots prospect. Recall that our target at

DEM was a buried porphyry intrusion and associated vein systems, the latter of which we clearly have drilled in all three holes,

and starting at surface in the first two. The array of sulphide minerals present, particularly the abundant arsenopyrite, and the

broad system intercepts in all three holes from two widely separated pads, suggests a potentially large, well-endowed system.

Moreover, the results have demonstrated that the geochemical and geophysical anomalies can be relied upon for targeting the

drilling. We therefore anticipate that, should laboratory assay results come back strong, we will be able to systematically build

upon this program with follow-up efforts next year.”

About the DEM Project

The 10,451 hectare DEM property, located in moderate terrain only 40 kms northwest of Fort St. James in central B.C., lies

toward the south end of the Nation Lakes porphyry camp and within the Quesnel Terrane, the latter of which hosts large

deposits and long-life mines including the nearby Mount Milligan (50 kms to the northeast of DEM), and Lorraine deposits,

and, farther south, Mt. Polley, Afton, Copper Mountain, Brenda, and the Highland Valley deposits (Figure 3). Located central

to the DEM property is the “DEM Halo” prospect, a roughly 4km 2 target area defined by alteration and mineralogy suggestive

of the presence of a porphyry system, by a multi-element soil geochemical signature, including highs to 2.1 ppm Au, 160 ppm

Ag, >10,000 ppm As, and 651 ppm Cu, by compelling high-relief magnetic and IP-chargeability anomalies, and by the

presence of nearby regional scale structures. Extensive logging in the area and forest service roads provide drive-on access

directly to the DEM prospect. All of these factors, when combined, are suggestive of excellent discovery potential for a copper-

gold-silver porphyry and related vein systems. Further details on the DEM prospect may be found on the Company’s website

at www.evergoldcorp.ca/projects/dem-property/ and in a NI 43-101 technical report entitled “ Technical Report on the DEM

Property” dated August 30, 2023, posted thereon and on the Company’s issuer profile at SEDAR+.

Quality Assurance and Quality Control

Charles J. Greig, M.Sc., P.Geo., the Company’s Chief Exploration Officer and a Qualified Person as defined by NI 43-101, has

reviewed and approved the technical information in this news release.

Figure 1: Plan View: Drilling on Topography and Total Field Magnetics

Figure 2: Section Views: Drilling on Induced Polarization Chargeability

Figure 3: DEM Property Location in Province-Wide Geological Context

About Evergold

Evergold Corp. is a TSX-V listed mineral exploration company with projects in B.C. and Nevada. The Evergold team has a

track record of success in the junior mining space, most recently the establishment of GT Gold Corp. in 2016 and the

discovery of the Saddle South epithermal vein and Saddle North porphyry copper-gold deposits near Iskut B.C., sold to

Newmont in 2021 for a fully diluted value of $456 million, representing a 1,136% (12.4 X) return on exploration outlays of $36.9

million.

For additional information, please contact:

Kevin M. Keough

President and CEO

Tel: (613) 622-1916

[email protected]

www.evergoldcorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain “forward-looking statements” which are not comprised of historical facts. Forward- looking

statements include estimates and statements that describe the Company’s future plans, objectives or goals, including words

to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may

be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since

forward-looking statements are based on assumptions and address future events and conditions, by their very nature they

involve inherent risks and uncertainties. Although these statements are based on information currently available to the

Company, the Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties

and other factors involved with forward-looking information could cause actual events, results, performance, prospects and

opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could

cause actual results to differ materially from such forward-looking information include, but are not limited to failure to identify

mineral resources, delays in obtaining or failures to obtain required governmental, environmental or other project approvals,

political risks, inability to fulfill the duty to accommodate First Nations, uncertainties relating to the availability and costs of

financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity

prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other

risks involved in the mineral exploration and development industry, and those risks set out in the Company’s public

documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-

looking information in this news release are reasonable, undue reliance should not be placed on such information, which only

applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time

frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information,

whether as a result of new information, future events or otherwise, other than as required by law.