Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

ETR.CN ·

Etruscus Mobilizes FOR Drilling as “Bulls-Eye” Targets ARE Outlined at ROCK & Roll Project

Exploration Programs

ETRUSCUS MOBILIZES FOR DRILLING AS “BULLS-EYE”

TARGETS ARE OUTLINED AT ROCK & ROLL PROJECT

August 23, 2019

Vancouver, BC: Etruscus Resources Corp. (CSE: ETR) (the “Company” or “Etruscus”) is

pleased to announce that crews are mobilizing for the start of its Phase 1 drill program at the

Rock & Roll Project in Northwest B.C.’s Eskay Camp . This follows confirmation of a number of

relatively shallow geophysical targets considered highly prospective for additional volcanogenic

massive sulphide (VMS) discoveries.

Highlights:

• 2,500 metres of Phase 1 drilling is targeting additional silver-gold-copper-zinc-rich VMS-

style mineralization near the Black Dog deposit which was discovered three decades

ago but has never been systematically followed up on until now;

• The most recent airborne electromagnetic (EM) survey for the area has been

reinterpreted resulting in new encouraging results; and

• Geophysics, geochemistry and structural geology have combined to support the

interpretation that the large southern bloc k of the Rock & Roll Project, at a low elevation

7 km northwest of the past producing Snip high -grade gold mine, has the potential to

host multiple VMS-style deposits.

Dr. Jules Lajoie, who for the past 2 years has successfully selected massive sulphide drill

targets at Garibaldi Resources ’ Nickel Mountain from downhole geophysics, has outlined

several high priority near -surface conductors over a triangle -shaped area covering

approximately 3 sq. km adjacent to the historic Black Dog deposit.

Physical property analysis of some historic Black Dog drill core and other rock samples

collected from the property over the summer, showed that massive sulphide samples are orders

of magnitude more conductive than graphite bearing samples. This puts more weight on the

previously discounted airborne EM targets thought to be caused by graphite and suggests that

they may instead be caused by massive sulphides.

An improved understanding of the structural controls on mineralization at the Rock & Roll

Project, and a fir st-ever biogeochemical survey of the area yielding numerous coincident

multielement anomalies , some correlating to targeted geophysical anomalies, further support

Dr. Lajoie’s geophysical interpretations that can only be confirmed through drilling.

Gordon Lam, Etruscus President and CEO, commented: “I am extremely pleased with the many

months of hard work by our technical team, specifically the geophysic al reinterpretation by Dr.

Jules Lajoie. The conclusion changes over 30 years of geological thinking and gives us great

confidence as drillers now take aim at some exception al targets at shallow depths mostly

between 100 meters and 200 meters. Our first broad target area at Rock & Roll is south of the

Iskut River. Notably, the VMS system is believed to continue to the north, beyond the Iskut

River, where targets are being finalized.”

Qualified Person

Technical aspects of this news release have been reviewed and approved by Lindsay Bottomer,

P.Geo., FAusIMM who is a Qualified Person as defined under National Instrument 43-101.

About Etruscus

Etruscus Resources Corp. is a Vancouver -based exploration company focused on the

development of its 100%-owned Rock & Roll and Sugar Properties comprising 26,464 hectares

near the past producing Snip mine in Northwes t B.C.’s pr olific Eskay Camp. Etruscus trades

under the symbol ETR on the Canadian Securities Exchange and currently has 19,394,001

shares issued and outstanding.

On behalf of the Board of Directors:

/s/ “Gordon Lam”

Chief Executive Officer, President and Director

For further information:

Tel: 604-336-9088

Email: [email protected]

Web: www.etruscusresources.com

CAUTION REGARDING FORWARD-LOOKING STATEMENTS

This Press Release may contain statements which constitute ‘forward -looking’ statements , including

statements regarding the plans, intentions, beliefs and current expectations of the Company, its directors, or

its officers with respect to the future business activities and operating performance of the Company. The

words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and similar

expressions, as they relate to the Company, or its management, are intended to identify such forward -

looking statements. Investors are cautioned that any such forward-looking statements are not guarantees of

future business activities or performance and involve risks and uncertainties, and that the Company’s future

business activities may differ materially from those in the forward-looking statements as a result of various

factors. Such risks, uncertainties and factors are described in t he periodic filings with the Canadian

securities regulatory authorities, including quarterly and annual Management’s Discussion and Analysis,

which may be viewed on SEDAR at www.sedar.com. Should one or more of these risks or uncertainties

materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results

may vary materially from those described herein as intended, planned, anticipated, believed, es timated or

expected. Although the Company has attempted to identify important risks, uncertainties and factors which

could cause actual results to differ materially, there may be others that cause results not to be as intended,

planned, anticipated, believed, estimated or expected. The Company does not intend, and does not assume

any obligation, to update these forward-looking statements.

Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the CSE)

accepts responsibility for the adequacy or accuracy of this release.