Euro Sun Announces Positive Results for Preliminary Economic Assessment for the Initial Phase of Development at the Rovina Valley Gold-Copper Project

Economic Studies

Euro Sun Announces Positive Results for Preliminary Economic Assessment

for the Initial Phase of Development at the Rovina Valley Gold-Copper Project

TORONTO, Feb. 20, 2019 -- Euro Sun Mining Inc. (TSX: ESM) (“Euro Sun” or the “Company”) is pleased to announce the

results of the Preliminary Economic Assessment (“PEA”) for the exploitation of the COLNIC open pit; the initial phase of

development of its Rovina Valley gold and copper project (the “Rovina Valley Project”). The Company is applying a staged,

multi phase development approach for the Rovina Valley Project. The Rovina Valley Project consists of the COLNIC and

ROVINA gold-copper deposits amenable to open-pit development and the CIRESATA gold-copper deposit suitable for

underground development. The PEA considers the COLNIC mineral deposit only but does include the processing facilities

which will also be used in treating both ROVINA and CIRESATA deposits. Sequencing for the ROVINA open pit and

CIRESATA underground mine will be undertaken in a separate study at a later date. The Company is also pleased to provide

an updated mineral resource estimate for the Rovina Valley Project incorporating current metal prices and operating

parameters. All amounts are in US dollars unless otherwise indicated.  

PEA HIGHLIGHTS

• Average annual gold equivalent production of 139,000 ounces

• COLNIC production of 1,675,000 Gold Equivalent ounces (1,301,000 ounces Au) over 12 years

• Avg. AISC of $752/oz (net of copper credit)

• Processing rate of 20,000 tonnes per day incorporating flotation and dry stack tailings deposition

• Pre-Tax NPV 5% of $218.1 million with an IRR of 15.4% and Post-Tax NPV 5% of $168.8 million with an IRR of

13.5% at $1,325/oz gold and $3.10/lb copper

• Initial capital costs of $339.7 million (total CAPEX of $352 million)

• Average metallurgical recoveries of 82% for gold and 89% copper without utilizing cyanide

Scott Moore, Euro Sun’s CEO states, “The 2019 PEA highlights a positive economic project for our initial phase of

development at the Rovina Valley Project. Colnic is an at surface open pit deposit containing only 28.6% of the total measured

and indicated resources at the Rovina Valley Project. Colnic will form the foundation of a multi-decade operation with the

expectation of bringing the Rovina pit on-line using pre-installed infrastructure followed by the Ciresata deposit.”

Table 1: Preliminary Economic Assessment Highlights

Base Case Assumptions

Gold price (base case) $1,325/oz

Copper price (base case) $3.10/lb

Gold recovery 82%

Copper recovery 89%

Mine Life (Colnic Only) 12 years

Mining rate 20,000 tonnes per day

Mine Parameter  

Average annual gold equivalent production 139,000 ounces

Average annual gold production 108,000 ounces

Average annual copper production 13.3 million pounds

Average gold grade g/t 0.58

Average copper grade % 0.10

Colnic LOM Strip ratio (waste to ore) 1.9:1

Capital Costs  

Pre-strip capital $33.5 million

Initial capital $306.2 million

Total Initial Capital $339.7 million

Sustaining Capital $12.2 million

Total CAPEX $352 million

Operating Costs

All-in sustaining costs $752/ ounce AuEq

Mining costs $2.25 /tonne moved

Milling costs $7.03 /tonne milled

G&A costs $0.50 /tonne milled

Cash Flow 

Pre-Tax NPV (5% discount rate) $218 million

Pre-Tax IRR 15.4%

Post-Tax NPV (5% discount rate) $169 million

Post-Tax IRR 13.5%

The PEA was prepared by Lycopodium Minerals Canada Limited and AGP Mining Consultants Inc. (“AGP”) The technical

report related to the PEA results will be filed on SEDAR within 45 days, in accordance with National Instrument 43-101 (“NI 43-

101”)

Rovina Valley Project Resource Update 2019

Euro Sun announces its updated NI 43-101 compliant mineral resource estimate ("2019 Resource Estimate") as provided by

independent consultants AGP, on Euro Sun’s 100% owned Rovina Mining License in west-central Romania. The 2019

Resource Estimate includes the COLNIC, ROVINA and CIRESATA gold-rich copper porphyry deposits, collectively referred to

as the Rovina Valley Project. All three deposits are in close proximity and mill feed will be treated at a central facility. COLNIC

and ROVINA are amenable to open-pit mining and CIRESATA to bulk underground mining.

The 2019 Resource Estimate is an update to the 2012 NI 43-101 compliant Resource Estimate (completed by AGP) (the

“2012 Resource Estimate”) to primarily reflect higher operating costs, new metallurgical recoveries (see ESM Press Release

dated 19 September, 2018), and higher metal prices on resource constraining Lerchs-Grossman open pits using appropriate

cut-off grades. The geologic model and interpolated block model from the 2012 Resource Estimate are not changed in this

current estimate (see the 2012 Resource Estimate filed on SEDAR on 31 August, 2012). Mineral resources were estimated in

conformance with the CIM Mineral Resource and Mineral Reserve definitions referred to in NI 43-101 and are considered to

have reasonable prospects for economic extraction.

The updated resource estimate is shown below. The technical report related to the mineral resource estimate shown below will

be filed on SEDAR at www.SEDAR.com within 45 days.

Table 2: Rovina Valley Project 2019 Mineral Resource Estimate at base case cut-off grades (as of February 19, 2019)

Resource Category Tonnage

(MM t)

Au

(g/t)

Cu

(%)

Gold

(MM oz)

Copper

(MM lbs)

Au Eq*

g/t

Au Eq*

(MM oz)

Measured

Rovina (open-pit) 32.1 0.36 0.29 0.37 208.5 0.53 0.83

Colnic (open-pit) 29.2 0.65 0.12 0.61 74.3 0.82 0.77

Ciresata (underground) 28.5 0.88 0.16 0.81 102.2 1.13 1.03

Total Measured 90.0 0.62 0.19 1.78 305.1 0.91 2.63

Indicated

Rovina (open-pit) 74.2 0.27 0.22 0.64 364.6 0.60 1.44

Colnic (open-pit) 106.5 0.47 0.10 1.62 227.5 0.62 2.12

Ciresata (underground) 125.9 0.74 0.15 3.01 413.4 0.97 3.92

Total Indicated 307.2 0.53 0.15 5.26 1,005.5 0.76 7.47

Total Measured & Indicated 396.0 0.55 0.16 7.05 1,390.6 0.79 10.11

• *Au eq. determined by using a long-term gold price of US$1,500 per ounce and a copper price of US$ 3.30/lb.

Metallurgical recoveries are not taken into account for Au eq.

• Base case cut-off grade used in the table are 0.35 g/t Au eq. for the Colnic deposit and 0.25% Cu eq for the Rovina

deposit, both of which are amenable to open-pit mining and 0.65 g/t Au eq. for the Ciresata deposit which is amenable

to underground bulk mining.

• For the Rovina and Colnic porphyries, the resources are pit-shell constrained using Lerchs-Grossmann algorithm pit

optimizer and market metal values of $1,500/oz Au price and $3.30/lb Cu price, with net prices after smelter payables,

concentrate transport, smelter charges, and royalty of US$1,384/oz Au and US$2.61/lb Cu for Colnic and US$1,286/oz

Au and US$2.59/Ib Cu for Rovina.  Flotation metallurgical recoveries used are: Colnic 81.5% gold, 88.5% copper and

Rovina 73.2% gold, 94.7% copper.

• Rounding of tonnes as required by reporting guidelines may result in apparent differences between tonnes, grade and

contained metal content.

• These mineral resources are not mineral reserves as they do not have demonstrated economic viability

At both the ROVINA and COLNIC deposits, there are higher-grade portions of each deposit that outcrop at surface. These

areas represent higher grade porphyry core mineralization that can allow cut-off grade optimization in mining scenarios. As an

example, the higher-grade mineralization at COLNIC contains measured plus indicated resources at >0.70 g/t Au eq of 46

million tonnes at 0.75 g/t Au and 0.12% Cu. At the ROVINA deposit, the higher-grade mineralization contains measured plus

indicated resource at >0.50% Cu eq of 30 million tonnes at 0.48 g/t Au and 0.34% Cu. CIRESATA has a continuous zone of

high-grade gold and copper mineralization in the core of the deposit that persists at depth that is suitable for extraction with an

underground bulk-mining method. At CIRESATA, the measured plus indicated resource of this core at >1.0 g/t Au eq contains

58 million tonnes at 1.04 g/t Au and 0.18% Cu.

Qualified Persons

The mineral resources and PEA results stated in this press release have been reviewed and approved by Mr. Pierre Desautels,

P.Geo., and Mr. Gordon Zurowski, P.Eng, both Principal Partners of AGP, who are independent Qualified Person as defined

by National Instrument 43-101. Mr. Desautels was responsible for the mineral resource estimate and Mr. Zurowski was

responsible for the mining aspects of the mineral resource estimate and PEA study. Mr. Desautels and Mr. Zurowski

confirmed that they have reviewed the information in this press release as it relates to the mineral resource estimate.

Mr. Randy Ruff, P.Geo, an employee of Euro Sun and a qualified persons as defined by NI 43-101 has also reviewed and

approved the contents of this press release relating to the mineral resource estimation.

About Euro Sun Mining Inc.

Euro Sun is a Toronto Stock Exchange listed mining company focused on the exploration and development of its 100%-owned

Rovina Valley Gold and Copper Project located in west-central Romania. The property hosts 10.11 million gold equivalent

ounces (7.05 million ounces of gold grading 0.55 g/t and 1,390 million pounds of copper grading 0.16%).

Further information:

For further information about Euro Sun Mining, or the contents of this press release, please contact Investor Relations at

[email protected] or +1 416.309.4299.

Caution regarding forward-looking information:

This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation.

Forward-looking information includes, without limitation, statements regarding the PEA and the 2019 Resource Estimate and

the summary information extracted therefrom. Forward-looking information is subject to known and unknown risks,

uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the

Company to be materially different from those expressed or implied by such forward-looking information, including risks

inherent in the mining industry and risks described in the public disclosure of the Company which is available under the profile

of the Company on SEDAR at  www.sedar.com and on the Company's website at www.eurosunmining.com. Although the

Company has attempted to identify important factors that could cause actual results to differ materially from those contained

in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended.

There can be no assurance that such information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking

information. The Company does not undertake to update any forward-looking information, except in accordance with applicable

securities laws.

The TSX does not accept responsibility for the adequacy or accuracy of this news release.