Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ESK.V ·

Eskay Mining Corp. Reports on 2018 Exploration on the SIB Property, Northwest B.C.—Drilling Intercepts Broad Zones of Gold Mineralization - Potential Remains High

Drill Results

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

NEWS RELEASE

FOR IMMEDIATE RELEASE: DECEMBER 7, 2018

Eskay Mining Corp. Reports on 2018 Exploration on the SIB Property, Northwest

B.C.—Drilling Intercepts Broad Zones of Gold Mineralization - Potential Remains

High

Toronto, December 7 , 2018 - Eskay Mining Corp. (“Eskay” or the “Company”)

(TSX-V:ESK) (OTC -PK: ESKYF) (Frankfurt: KN7; WKN: A0YDPM) is pleased to

report the latest assay results and preliminary interpretations from the 2018 SIB

property drill campaign . One highlight is that b road intervals of encouraging

Volcanogenic Massive Sulphide ( VMS) feeder-style mineralization were intercepted in

two holes collared in the hangingwall of the Coulter Creek Thrust Fault (CCTF; figs 1-4).

One of the holes, EK18-160, intersected 61.9 g/t gold and 8.9 g/t silver over 1.0 m

within a 109.25 m interval grading 0.24 g/t gold, 3.6 g/t silver, 0.15% lead and

0.18% zinc, excluding the above-mentioned high-grade zone. Another hole, EK18-158,

located 2.5 km south of EK18 -160, cut several zones of gold mineralization, including

an 11.93 m interval of elevated precious and base metals that included a 1.0 m interval

of 2.81 g/t gold, 2.7 g/t silver, 0.10% lead and 0.11% zinc , and a 73.4 m interval

grading 0.34 g/t gold.

Within the footwall of the CCTF, hole EK18-157 intersected sporadic gold mineralization

over a 48 m wide zone (not fully sampled) which yielded anomalous gold geochemistry

where sampled, and which graded up to 0.61 g/t Au. In this hole, the gold mineralization

is hosted within rhyolite that is indistinguishable texturally and geochemically from that

at the Eskay Creek mine, only 6 km distant to the north. Also of note is that hole EK18-

157 represents the southwestern-most exten t of drilling in the CCTF footwall. This

suggests to the Company that exploration potential beneath Bowser Lake Group cover

rocks in the footwall of the fault does indeed exist in this area , where favourable Eskay

Rift stratigraphy remains untested, open to the south, and is well within reach of

diamond drills. See Table 1 for drill highlights.

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Table 1: 2018 SIB Property Drilling Highlights

Hole Depth

From (m)

Depth To

(m)

Length

(m) Au g/t Ag g/t Zn ppm Pb ppm

EK18-160 142.40 251.65 109.25 0.80 3.6 1833 1490

including 169.06 170.32 1.26 0.14 49.2 48800 36800

201.97 203.10 1.13 1.85 20.0 28400 16650

203.10 204.10 1.00 61.90 8.5 122 89

EK18-158 78.92 90.85 11.93 0.57 1.0 346 157

including 80.92 81.92 1.00 2.81 2.7 1125 1045

EK18-158 425.40 499.00 73.60 0.34 1.0 209 108

EK18-157 614.20 617.20 3.00 0.15 <0.5 90 16

EK18-157 619.20 620.20 1.00 0.61 <0.5 122 19

The 2018 drill campaign, fully funded by SSR Mining Inc. (“SSR Mining”), was designed

to test for precious metals enriched VMS mineralization primarily in the footwall of the

CCTF. The 2018 drill program consisted of 11 holes, including extension s of EK17-150

and -151 drilled in 2017 (See Table 2). Drilling reaffirmed our asse rtion that potential

remains in the both hangingwall and footwall of the CCTF, and it expanded our

understanding of the geometry of Eskay Creek -equivalent stratigraphy in the CCTF

footwall. (See Figure 1). The Company is thankful to SSR Mining for its participation in

exploration at SIB, and it looks forward to continuing that exploration by leveraging the

knowledge and understanding gained in the programs funded by SSR Mining. Eskay is

grateful to be able to maintain its 80 percent ownership share in the property along with

minority partner Kirkland Lake Gold.

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Table 2: 2018 Drill Collar Details

Hole Name

UTM

NAD83

Easting

UTM

NAD83

Northing

Elevation (m) Length (m) Azimuth Dip

EK18-150X* 407563 6274156 960.98 452.30 100 -80

EK18-153* 408130 6274353 1139.06 592.05 293 -65

EK18-151X* 407420 6274024 954.59 375.00 110 -70

EK18-155* 407190 6274071 1005.70 1037.49 113 -53

EK18-154* 408424 6274903 1143.87 696.30 293 -70

EK18-156* 407545 6270945 795.00 1084.20 100 -75

EK18-157 407065 6273338 970.00 677.20 95 -54

EK18-158 408021 6273462 1103.00 939.55 264 -68

EK18-159* 407065 6273338 970.00 1266.30 95 -88

EK18-160 409232 6275687 1173.00 939.00 305 -54

EK18-161* 407065 6273338 970.00 1068.30 95 -70

*No significant results to report

Details of Drilling: Hangingwall of the Coulter Creek Thrust Fault

Four holes were collared and drilled east to west in the hangingwall block of the CCTF

(Figure 1) .Two of the holes (EK18 -158 and EK18 -160), located 2.5 km apart ,

intersected broad zones of semi -massive pyrite, chalcopyrite, galena and sphalerite

veins within silicified volcanic rocks of the Betty Creek formation (See Figures 2 and 3

for cross-sections, and Table 1 above for results).

EK18-160, in the Northern SIB enclave block , returned the highest gold grade s of

discordant, VMS “feeder-style” mineralization ever drilled on the SIB property . Areas

up-stratigraphy have been explored by wide-spaced shallow drilling but remain untested

for up to 200 m up-dip, and for approximately 850 m along strike (total length of the

enclave claim block); this represents an area that is open for further exploration drilling.

EK18-158 encountered several broad zones of anomalous gold mineralization in the

hangingwall of the CCTF, including a 73.6 m wide intercept within silicified intermediate

to felsic volcanic rocks that returned 0.34 g/t gold. EK08-134, located about 150 m north

of EK18-158, encountered similar alteration and mineralization at the same stratigraphic

level and returned 2.19 g/t gold over 20.20 m. We interpret th ese mineralized zones to

represent VMS feeder systems, which remain largely untested in areas up-stratigraphy

and along strike; it represents another highly prospective target.

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Details of Drilling : Footwall of the Coulter Creek Thrust Fault —A New Geologic

Interpretation Yielding Exciting Drill Targets in Eskay -Equivalent Salmon River

Formation Stratigraphy

Six drill holes were collared in the footwall of the CCTF in 2018, and similar to the 10

holes drilled in the same area in the 2017 SIB program, typically drilled blind through as

much as 450 meters of Bowser Lake Group cover rocks. In the geology beneath the

cover, the holes revealed complex relationship s among basaltic pillowed flows and

rhyolite flows and flow-domes of the Salmon River formation . These relationships are in

part manifest as abrupt along-strike thickness changes (e.g., cross-section shown in

Figure 4) that are interpreted to represent significant syn-volcanic tectonism coincident

with active subsea volcanism. S uch apparently active extensional faulting and

microbasin development in a sea-floor environment is considered essential to the

formation and preserv ation of massive sulfide deposits. This is particularly significant

given that the host rocks are essentially indistinguishable geochemically and

lithologically from the distinctive rocks which host the orebodies at the Eskay Creek

mine. Importantly, given our new understanding of the geology, the steeply easterly

dipping lithological contact between basalt and rhyolite , which hosts the orebodies at

the Eskay Creek deposit, remains untested to the south.

The southernmost hole drilled during the 2018 SIB program (EK18-157) intersected a

48 m wide zone (between 614.2 and 662.2 m ) of intermittent intervals containing

elevated gold within silicified tuffaceous and flow -banded rhyolite. It is the Company’s

view that significant exploration potential remains in the CCTF footwall , particularly

southward from the area drilled in 2017 and 2018, from which it is now inferred that the

prospective rhyolite package appears to be thickening . The favourable Eskay

stratigraphy remains open and untested to the south, well within reach of diamond

drilling.

CEO Mac Balkam commented: “The 2017 and 2018 drilling programs led to the

development of a new and well-constrained view of the Eskay rift geology in the footwall

of the CCTF . This work has led to significant refinements in the search for prospective

precious metals-enriched VMS horizons at the rhyolite-basalt contact, which hosts the

truly world class orebod ies mined at Eskay Creek. Drilling has outlined a thickening

rhyolite package stepping south and west, and the prospective Eskay-like stratigraphy,

which bears a remarkable resemblance to that at the Eskay mine, is primed for further

exploration to the south . Due to our improved understanding of the complex geology,

we are in a better position to make a significant discovery on the SIB Property.”

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

In summary, the 2018 drilling season at SIB was a success. It confirmed that the highly

prospective conceptual stratigraphic target existed within the footwall of the CCTF, was

reachable with the diamond drill and was mineralized . In addition, in discovering new

gold mineralization within the hangingwall of the CCTF, the Company has shown that

even the northern part of the SIB property retains its excellent exploration potential.

For further information regarding the SIB property, see the Company’s Press

Releases of October 17, 2016, August 8, 2016, May 9, 2016 and January 22, 2018. For

further information regarding Eskay’s prospects and showings at the Corey property,

see the Company’s corporate presentation entitled “April 2018 Property Review and

Targeting”.

All geochemical samples were delivered directly to ALS Global’s analytical facility in

Terrace, B.C. for preparation, and subsequent precious metal and multi -element

analysis in their North Vancouver laboratory. ALS Global in North Vancouver, British

Columbia, Canada, is a facility certified as ISO 9001:2008 and accredited to ISO / IEC

17025:2005 from the Standards Council of Canada.

Charles J. Greig, P. Geo., a member of the Company’s Advisory Team, is a Qualified

Person under the definition of National Instru ment 43-101. Mr. Greig has reviewed and

approved the technical information in this press release.

About Eskay Mining Corp:

Eskay Mining Corp (TSX -V:ESK) is a TSX Venture Exchange listed company,

headquartered in Toronto, Ontario. Eskay is an exploration c ompany focused on the

exploration and development of precious and base metals along the Eskay rift in a

highly prolific region of northwest British Columbia known as the “Golden Triangle ,”

approximately 70km northwest of Stewart, BC. The Company currently holds mineral

tenures in this area comprised of 177 claims (130,000 acres).

All material information on the Company may be found on its website at

www.eskaymining.com and on SEDAR at www.sedar.com.

For further information, please contact:

Mac Balkam T: 416 907 4020

President & Chief Executive Officer E: [email protected]

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that

term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This Press Release contains forward -looking

statements that involve risks and uncertainties, which may cause actual results to differ

materially from the statements made. When used in this document, the words “may”,

“would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” and

similar expressions are intended to identify forward -looking statements. Such

statements reflect our current views with respect to futu re events and are subject to

risks and uncertainties. Many factors could cause our actual results to differ materially

from the statements made, including those factors discussed in filings made by us with

the Canadian securities regulatory authorities. Sh ould one or more of these risks and

uncertainties, such as actual results of current exploration programs, the general risks

associated with the mining industry, the price of gold and other metals, currency and

interest rate fluctuations, increased competi tion and general economic and market

factors, occur or should assumptions underlying the forward looking statements prove

incorrect, actual results may vary materially from those described herein as intended,

planned, anticipated, or expected. We do not in tend and do not assume any obligation

to update these forward -looking statements, except as required by law. Shareholders

are cautioned not to put undue reliance on such forward-looking statements.

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Figure 1: Plan view Map of 2018 SIB property Drilling, and Exploration Highlights

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Figure 2: Cross-section of EK18-160 and historical holes, with Au results and major lithologies