Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ESK.V ·

Eskay Mining Corp. Establishes Rapid Turnaround Analytical Laboratory in Stewart, BC to Accelerate Gold Discovery using detectORE™ Technology

Corporate Updates

1

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

NEWS RELEASE

FOR IMMEDIATE RELEASE: April 28, 2026

Eskay Mining Corp. Establishes Rapid Turnaround Analytical Laboratory in Stewart, BC to Accelerate

Gold Discovery using detectORE™ Technology

TORONTO, ON / ACCESS Newswire /April 28, 2026 / Eskay Mining Corp. (“Eskay Mining” or the

“Company”) (TSXV:ESK) (OTC PINK:ESKYF) (Frankfurt:KN7) (WKN:A0YDPM) is pleased to

announce that it is establishing a new, dedicated rapid turnaround analytical laboratory in Stewart, British

Columbia. This facility is specifically designed to conduct detectORE™ gold analysis on drill core samples

from the Company’s extensive 459 square kilometer land holding in the heart of British Columbia’s Golden

Triangle.

The establishment of this laboratory in Stewart directly addresses a primary challenge for exploration in

northern British Columbia: the bottleneck imposed by the short operational summer field season. Historically,

gold exploration in this region has been compromised by long turnaround times at conventional commercial

laboratories, which often exceed several weeks or months. Such delays frequently result in the exploration

season concluding before critical assay data can be used to refine targets or adjust drilling priorities.

Eskay’s drill core will be flown out of the field on a daily basis to its road-accessible camp, and then conveyed

by road to Stewart, where it will be logged and cut for sampling. By utilizing the detectORE™ system

developed by Portable PPB Pty Ltd and applied to drill core cuttings, Eskay will be able to receive gold

analyses within 48 hours of the core having been cut. This "game-changing" time compression will allow the

Company’s geologic team to engage in fast, results-based decision-making, keeping the drill rig on gold-

yielding targets while the season is still active.

The detectORE™ system is a geochemical technology that enables the detection of low-level (ppb) and high-

level gold concentrations in a field laboratory. The process involves:

 Leaching: Gold is leached from drill core cutting sludge samples using the proprietary GLIX-24™

reagent system.

 Collection and Measurement: The leached gold is adsorbed onto a specialized collector device and

then measured using a calibrated portable X-ray fluorescence (pXRF) analyzer, which, separate to the

detectORE process, is also used to analyse for a suite of other elements, including copper and zinc.

 Reporting: Gold results are reported in detectORE™ Units (dU), which serve as a semi-quantitative

measure of gold in the sample. A detectORE unit represents the leached and collected gold in micro

grams per kg of sample, which is effectively parts per billion. This is proportional to the sample’s

absolute gold level. Validation studies by other industry players have shown a strong linear correlation

2

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

(up to 0.98 Pearson correlation coefficient) between detectORE™ dU results and certified Fire Assay

values for drill core samples.

All laboratory equipment is currently being commissioned in Vancouver under the management of Mr. Stephen

Cook, formerly chief geochemist with Teck Resources. Mr. Cook will be responsible for the transfer of the

laboratory to Stewart, and for its quality control throughout the exploration season.

“The establishment of this lab in Stewart is a strategic milestone for Eskay Mining,” stated Mac Balkam, CEO

of Eskay. “By bringing detectORE™ technology directly to the doorstep of our projects, we are effectively

extending our functional exploration window. We no longer have to fly blind for weeks at a time; we can now

use ‘gold to find gold’ in real time, ensuring our capital is used as efficiently as possible during the critical

summer months. This is a first for British Columbia, and we are proud of it”.

By adopting this technology, Eskay Mining Corp. joins a growing number of exploration companies in other

parts of the world which are successfully utilizing detectORE™ to accelerate discovery. Kalo Gold Corp. has

integrated the system into its routine operations at its Vatu Aurum Project in Fiji for the rapid on-site screening

of rock, trench, and drill core samples. In Namibia, Ongwe Minerals Inc. recently employed the technology to

identify a new 2km long bedrock gold anomaly at its Belmont prospect. Additionally, Ariana Resources has

utilized detectORE™ to enhance its exploration workflows and decision-making processes in Zimbabwe.

While detectORE™ data provides essential vectoring and target refinement, the Company will continue to use

certified Fire Assay results from accredited commercial laboratories as the basis for all reportable drill results

under National Instrument 43-101.

Qualified Person

Clinton Smyth, P. Geo., Chief Geologist for the Company, a qualified person as defined by National Instrument

43-101, has reviewed and approved the technical contents of this news release.

About Eskay Mining Corp:

Eskay Mining Corp (TSX-V:ESK) is a TSX Venture Exchange listed company, headquartered in Toronto,

Ontario. Eskay is an exploration company focused on the exploration and development of precious and base

metals along the Eskay rift in a highly prolific region of northwest British Columbia known as the “Golden

Triangle,” 70km northwest of Stewart, BC. The Company currently holds mineral tenures in this area comprised

of 177 claims (52,600 hectares).

All material information on the Company may be found on its website at www.eskaymining.com and on

SEDAR+ at www.sedarplus.com.

For further information, please contact:

3

82 Richmond Street East

Toronto, ON M5C 1P1

T: 416 907 4605

E: [email protected]

W: eskaymining.com

Mac Balkam

President & Chief Executive Officer

T: 416 907 4605

E: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements: This Press Release contains forward-looking statements that involve risks and

uncertainties, which may cause actual results to differ materially from the statements made. When used in this

document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”,

“expect” and similar expressions are intended to identify forward-looking statements. Such statements reflect our

current views with respect to future events and are subject to risks and uncertainties. Many factors could cause

our actual results to differ materially from the statements made, including those factors discussed in filings made

by us with the Canadian securities regulatory authorities. Should one or more of these risks and uncertainties,

such as actual results of current exploration programs, the general risks associated with the mining industry, the

price of gold and other metals, currency and interest rate fluctuations, increased competition and general

economic and market factors, occur or should assumptions underlying the forward looking statements prove

incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, or

expected. We do not intend and do not assume any obligation to update these forward-looking statements, except

as required by law. Shareholders are cautioned not to put undue reliance on such forward-looking statements.

SOURCE: Eskay Mining Corp.