Ero Copper third quarter production and financial results continue to position the Company for growth
November 10, 2021
Ero Copper third quarter production and financial results continue to
position the Company for growth
(all amounts in US dollars, unless otherwise noted)
Vancouver, British Columbia – Ero Copper Corp. (TSX: ERO, NYSE: ERO) (“Ero” or the
“Company”) is pleased to announce its financial results for t he three and nine months ended September
30, 2021. Management will host a conference call tomorrow, Thursday, November 11, 2021 , at 12:30
p.m. Eastern time to discuss the results. Dial-in details for the call can be found near the end of this press
release.
HIGHLIGHTS
• Copper production of 10,057 tonnes at the MCSA Mining Complex at C1 cash costs (*) of $0.94
per pound of copper produced during the quarter;
• Gold production of 9,426 ounces at the NX Gold Mine at C1 cash costs (*) of $538 per ounce of
gold produced and All-in Sustaining Costs ("AISC")(*) of $741 per ounce of gold produced;
• Strong quarterly adjusted EBITDA (*) of $72.9 million and adjusted net income attributable to
owners of the Company(*) of $45.7 million ($0.49 per share on a diluted basis);
• Record quarterly cash flows from operations of $150.7 million driven by strong operating
performance and a $100.0 million upfront payment related to the August 2021 closing of the
$110 million streaming agreement with Royal Gold (as defined below) in relation to gold
production from the NX Gold Mine (the "NX Gold Stream");
• Announced results o f optimized Feasibility Study for the Boa Esperança Project, doubling life-
of-mine copper production compared to the 2017 Study (as defined below);
• Repaid $100.0 million of principal on the $150.0 million senior secured revolving credit facility,
resulting in available liquidity at quarter-end of $219.1 million, including $92.6 million of cash
and cash equivalents, $26.4 million in short-term investments, and $100.0 million of undrawn
availability under the senior secured revolving credit facility; and,
• Tracking towards the high-end of the Company's reaffirmed 2021 production guidance ranges;
lowering full-year AISC guidance for the NX Gold Mine to $650 to $725 per ounce of gold
produced and updating 2021 capital expenditure guidance for the MCSA Mining Complex to
reflect the acceleration of capital expenditures associated with key projects into Q4 2021 as well
as the impact of inflationary pressures on capitalized development.
TSX: ERO
NYSE: ERO
1 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
Commenting on the results, David Strang, CEO, stated, “The third quarter was instrumental in
positioning our Company to execute on our growth strategy. We delivered on three important milestones
during the quarter including the completion of an optimized Feasibility Study on the Boa Esperança
Project, the closing of the previously announced $110 million NX Gold Stream, and the conclusion of
mill maintenance at the MCSA Mining Complex in preparation for expanded operations. With the
construction of the new external shaft at the Pilar Mine initiated on schedule in September and the
planned commencement of early construction activities at the Boa Esperança Project expected to begin
in Q2 2022 (subject to approval by the Company's Board of Directors), our team is working to double
production while maintaining strong margins over the coming years.
"In preparation of these growth timelines, we have brought forward the second phase of our cooling
project and made down payments for long-lead items related to the new external shaft for the Pilar
Mine. While we, like the rest of the mining industry, are seeing global inflationary pressures impacting
both operating and capital development costs, it remains to be seen whether this cost pressure is
transitory or structural in nature. As a result of the acceleration of growth project capital and
incorporating increases in development costs, we are updating our capital expenditure guidance for the
full-year at the MCSA Mining Complex by approximately $20 million.
"With respect to the Deepening Extension Project, construction of the first phase of the shaft and other
early civil works have commenced. Concurrently, we are finalizing the optimization efforts on the
project including plans to increase the shaft's diameter. As a result of incorporating exceptional year-to-
date drill results from the Deepening Extension and new drilling in the upper levels of the mine, our
team has begun working on a longer-term initiative to potentially increased overall production volumes
from the Pilar Mine.
"We have an exceptional asset portfolio and our team has worked hard to achieve peer-leading cost
performance through optimization and innovation, principles that we are applying to the Deepening
Extension and Boa Esperança Projects. While we expect the macro operating environment to remain
dynamic, we are staking our success on the core values that have consistently delivered shareholder
value: executing upon high-return and low-capital intensity projects.”
*Earnings before interest, taxes, depreciation and amortization (“EBITDA”), Adjusted EBITDA,
Adjusted net income attributable to owners of the Company, Adjusted net income per share attributable
to owners of the Company, C1 cash cost per pound of copper produced, C1 cash cost per ounce of gold
produced and All-in Sustaining Costs (“AISC”) per ounce of gold produced are non-IFRS measures –
see the Notes section of this press release for additional information. C1 cash cost per pound of copper
produced are net of by-product credits from metal produced at the MCSA Mining Complex. AISC per
ounce of gold produced are net of by-product credits from metal produced at the NX Gold Mine.
TSX: ERO
NYSE: ERO
2 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
OPERATIONS & EXPLORATION HIGHLIGHTS
• Mining & Milling Operations – on track to achieve high-end of full-year production guidance
◦ The MCSA Mining Complex processed 572,666 tonnes of ore grading 1.90% copper,
producing 10,057 tonnes of copper in concentrate during the quarter after metallurgical
recoveries of 92.4%; YTD 2021 copper production totaled 33,593 tonnes based on
approximately 1.7 million tonnes processed at copper grades of 2.11% and metallurgical
recoveries of 92.3%.
◦ The second and final phase of scheduled mill maintenance at the MCSA Mining Complex
was completed at the end of Q3 2021, positioning the Company for higher mill throughput
in Q4 2021.
◦ The NX Gold Mine processed 42,874 tonnes grading 7.37 grams per tonne, producing 9,426
ounces of gold after metallurgical recoveries of 92.7% and 6,575 ounces of silver produced
as by-product; YTD 2021 tonnes processed totaled 124,422 at an average grade of 7.67
grams per tonne, producing 29,254 ounces of gold after metallurgical recoveries of 95.4%
and 19,172 ounces of silver produced as by-product.
◦ Construction of the NX Gold Mine's paste-fill plant concluded in Q3 2021, and
commissioning is currently underway. Integration into the operations is anticipated before
year-end with implementation expected to improve overhand cut and fill mining operations
and enhance pillar recovery throughout the mine.
• Exploration Activities – strong exploration results expected to drive positive year-end mineral
reserve and resource update
◦ Q3 2021 exploration activities continued to generate exceptional results both in-mine and
near-mine at the MCSA Mining Complex and the NX Gold Mine, positioning the Company
for a positive year-end mineral reserve and resource update.
◦ Ongoing exploration efforts are focused on aggressively advancing target zones and new
mineral systems within each of the Company's core exploration programs in an effort to
meaningfully augment near- to long-term production at both the MCSA Mining Complex
and the NX Gold Mine.
◦ Please refer to the Company's press release dated October 14, 2021 for the latest results
from the Company's ongoing exploration programs.
TSX: ERO
NYSE: ERO
3 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
• Organic Growth Projects
◦ Site clearing, early civil works and initial construction for the new external shaft supporting
the Deepening Extension Project commenced in September 2021. Concurrent engineering
and design efforts are focused on optimizing the 2020 shaft design and evaluating the
potential for increased production volumes from the Pilar Mine longer-term.
◦ On September 28, 2021, the Company announced results for the optimized Feasibility Study
on its Boa Esperança Project. Early construction works are expected to commence in Q2
2022, subject to approval by the Company's Board of Directors. Select highlights include:
– 41.8% after-tax internal rate of return and $380 million after-tax net present value
(8%) based on Consensus Copper Prices(1) and a 5.00 BRL:USD exchange rate;
– Doubled life-of-mine ("LOM") copper production to approximately 326,000 tonnes
from 163,000 tonnes in the 2017 Study(2) with increased mine life of twelve years;
– Average LOM copper production increased to over 27,000 tonnes per annum, with
the first five years of production averaging approximately 35,000 tonnes per annum;
and
– Low capital-intensity of approximately $8,400 per tonne of average annual copper
production for the first 5 years of the Project, resulting in rapid payback of 1.4 years
at Consensus Copper Prices.
• Corporate Highlights
◦ In August 2021, the Company closed the $110 million NX Gold Stream, unlocking
significant value from the NX Gold Mine and highlighting the exploration potential of the
broader NX Gold land package. Additional detail is provided later in this press release.
◦ The Company used cash on hand, bolstered by $100.0 million in upfront cash consideration
received upon the closing of the NX Gold Stream, to repay $100.0 million of principal on its
$150.0 million senior secured revolving credit facility. At September 30, 2021, the
Company had $50.0 million drawn under its $150.0 million senior secured revolving credit
facility.
(1) Consensus Copper Prices based on the average analyst copper price estimates from 26 financial institutions as of August
31, 2021, or the effective date of the mineral resource and mineral reserve estimates for the Boa Esperança Project as
disclosed in the press release dated September 28, 2021, resulting in $3.80 per pound in 2024, $3.95 per pound in 2025 and
$3.40 per pound in 2026 and thereafter. Using Consensus Copper Prices, the average LOM copper price is $3.51 per
pound. Using a flat $3.50 per pound copper price over the LOM, the Boa Esperança Project generates a 38.0% after-tax
internal rate of return and a $361 million after-tax net present value (8%), assuming a 5.00 BRL:USD exchange rate.
(2) The "2017 Study" is defined as the technical report entitled "Feasibility Study Technical Report for the Boa Esperança
Copper Project, Pará State, Brazil”, dated September 7, 2017 with an effective date of June 1, 2017, prepared by Rubens
Mendonça, MAusIMM of SRK Consultores do Brasil Ltda. (“SRK”) as at the date of the report and Carlos Barbosa, MAIG
and Girogio di Tomi, MAusIMM, both of SRK Brazil, and each a “qualified person” and “independent” of the Company
within the meanings of National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101").
TSX: ERO
NYSE: ERO
4 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
OPERATING AND FINANCIAL HIGHLIGHTS
3 months
ended
Sep. 30, 2021
3 months
ended
June 30, 2021
9 months
ended
Sep. 30, 2021
3 months
ended
Sep. 30, 2020
9 months
ended
Sep. 30, 2020
Operating Highlights
Copper (MCSA Operations)
Ore Processed (tonnes) 572,666 553,992 1,724,252 553,148 1,788,178
Grade (% Cu) 1.90 2.13 2.11 2.18 2.03
Cu Production (tonnes) 10,057 10,898 33,593 10,961 32,796
Cu Production (000 lbs) 22,170 24,026 74,059 24,164 72,302
Cu Sold in Concentrate (tonnes) 10,762 10,093 33,324 11,530 32,549
Cu Sold in Concentrate (000 lbs) 23,727 22,253 73,468 25,420 25,420
C1 cash cost of Cu produced (per lb)(1) $ 0.94 $ 0.72 $ 0.70 $ 0.63 $ 0.66
Gold (NX Gold Operations)
Au Production (oz) 9,426 10,377 29,254 9,436 26,041
C1 cash cost of Au Produced (per oz)(1) $ 538 $ 499 $ 508 $ 421 $ 478
AISC of Au produced (per oz)(1) $ 741 $ 660 $ 681 $ 579 $ 636
Financial Highlights
($ in millions, except per share amounts)
Revenues $ 111.8 $ 120.7 $ 355.0 $ 94.3 $ 232.8
Gross profit 68.0 83.7 234.5 59.6 129.8
EBITDA(1) 48.5 112.0 215.7 52.1 24.9
Adjusted EBITDA(1) 72.9 85.5 245.1 62.5 138.4
Cash flow from operations 150.7 85.1 297.9 44.4 124.2
Net income (loss) 26.4 84.0 142.4 31.4 (13.8)
Net income (loss) attributable to owners of the
Company 26.1 83.4 141.2 31.1 (14.2)
Per share (basic) 0.29 0.95 1.60 0.36 (0.16)
Per share (diluted) 0.28 0.89 1.52 0.34 (0.16)
Adjusted net income attributable to owners of the
Company(1) 45.7 53.7 155.7 36.7 77.8
Per share (basic) 0.52 0.61 1.76 0.42 0.90
Per share (diluted) 0.49 0.58 1.67 0.40 0.85
Cash, cash equivalents, and short-term
investments 119.1 137.7 119.1 54.3 54.3
Working capital (deficit)(1) 81.4 118.9 81.4 (9.4) (9.4)
Net debt(1) (63.7) 19.2 (63.7) 118.4 118.4
(1) EBITDA, Adjusted EBITDA, Adjusted net income (loss) attributable to owners of the Company, Adjusted net income
(loss) per share attributable to owners of the Company, Net Debt, Working Capital, C1 cash cost of copper produced (per
lb), C1 cash cost of gold produced (per ounce) and AISC of gold produced (per ounce) are non-IFRS measures – see the
Notes section of this press release for a discussion on non-IFRS Measures.
TSX: ERO
NYSE: ERO
5 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
ADJUSTED EBITDA & NET INCOME (LOSS) RECONCILIATION
($ in thousands)
3 months ended
Sep. 30, 2021
Adjusted EBITDA $ 72,860
Adjustments:
Unrealized foreign exchange loss on USD denominated balances in MCSA (5,883)
Unrealized foreign exchange loss on derivative contracts (12,350)
Realized foreign exchange loss on derivative contracts (4,381)
Share based compensation and other 931
NX Gold stream transaction fees (1,219)
Incremental costs in response to COVID-19 pandemic (1,485)
EBITDA $ 48,473
Adjusted net income attributable to owners of the Company $ 45,708
Adjustments for non-cash items (attributable to owners of the Company):
Unrealized foreign exchange loss on USD denominated debt in MCSA (4,618)
Unrealized foreign exchange loss on derivative contracts, net of tax (10,417)
Unrealized gain on interest rate derivative 147
Share based compensation (2,041)
NX Gold stream transaction fees (1,219)
Incremental costs in response to COVID-19 pandemic (1,479)
Reported net income attributable to owners of the Company $ 26,081
NX GOLD STREAM
During the quarter, the Company closed the NX Gold Stream with RGLD Gold AG, a wholly owned
subsidiary of Royal Gold Inc. (collectively, “Royal Gold”), and received an upfront cash payment of
$100 million for the purchase of 25% of gold produced until 93,000 ounces of gold have been delivered,
decreasing to 10% of gold produced over the remaining life of mine. Royal Gold will make ongoing
payments equal to 20% of the prevailing spot gold price for each ounce of gold delivered until 49,000
ounces of gold have been received, after which it will pay 40% of the prevailing spot gold price for each
ounce of gold delivered. Additional payment obligations of Royal Gold include:
• Up to US$5 million payable, available through the end of 2024, based upon the number of
ounces of gold added to the Measured and Indicated mineral resource categories as compared to
the mineral resources as of the effective date of the NX Gold Stream at a rate of US$20 per
ounce;
• Up to US$5 million payable, available from 2022 through the end of 2024, based upon
completion of planned meters of drilling within the exploration concessions of the NX Gold
Mine at a rate of US$100 per meter; and,
• US$5 per ounce of gold delivered under the NX Gold Stream payable to the Company as
contribution towards ongoing ESG initiatives within the area of influence of the mine.
Please refer to the Company’s press releases dated June 30, 2021 and August 6, 2021 for additional
information on the NX Gold Stream.
TSX: ERO
NYSE: ERO
6 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
2021 PRODUCTION OUTLOOK(*)
The Company is well-positioned to achieve the high-end of its reaffirmed 2021 production guidance
ranges of:
• 42,000 to 45,000 tonnes of copper in concentrate at the MCSA Mining Complex
• 34,500 to 37,500 ounces of gold at the NX Gold Mine
During Q3 2021, the Company completed the second and final phase of preventative mill maintenance
at the MCSA Mining Complex in preparation for expanded operations and higher mill throughput
volumes, including from Surubim open pit mine where pre-stripping activity continued during the
quarter. Initial production from the Surubim open pit, including the processing of ore stockpiled during
pre-stripping, is expected to drive higher mill throughput volumes and lower average processed copper
grades during Q4 2021.
The Company expects to achieve the high-end of its full-year production guidance at the NX Gold Mine
despite lower planned grades in Q4 2021 due to mine sequencing within the Santo Antonio Vein.
2021 COST GUIDANCE(*)
The Company is on track to achieve its reaffirmed 2021 C1 cash cost guidance ranges, which assume a
USD:BRL foreign exchange rate of 5.00, a gold price of $ 1,750 per ounce and a silver price of $ 20.00
per ounce. The Company has lowered its 2021 AISC guidance range for the NX Gold Mine to reflect
lower sustaining capital expenditures year-to-date.
2021 Guidance
MCSA Mining Complex C1 Cash Cost Guidance (US$/lb)(1) $0.75 - $0.85
NX Gold Mine C1 Cash Cost Guidance (US$/oz)(1) $500 - $600
NX Gold Mine All-in Sustaining Cost (AISC) Guidance (US$/oz)(1) $650 - $725
(1) C1 Cash Costs and AISC are a non-IFRS measure - see the Notes section of this press release for additional information.
2021 CAPITAL EXPENDITURE GUIDANCE(*)
The Company is reaffirming its full-year capital expenditure guidance for the NX Gold Mine and
updating its 2021 capital expenditure guidance for MCSA Mining Complex to reflect the acceleration
of: (i) the Phase 2 cooling project at the MCSA Mining Complex, (ii) long-lead item purchases related to
the new external shaft of the Pilar Mine and (iii) early civil and road construction activities at the Boa
Esperança project into Q4 2021. Capitalized development costs at the MCSA Mining Complex have also
been updated to reflect inflationary pressures impacting consumables used in development activities.
The capital expenditure guidance assumes a USD:BRL foreign exchange rate of 5.00 and has been
presented below in USD millions.
TSX: ERO
NYSE: ERO
7 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
MCSA Operations 2021 Guidance
Pilar Mine and Caraíba Mill Complex (excluding Deepening Extension Project) $55.0 - $60.0
Deepening Extension Project 26.0 - 28.5
Vermelhos Mine & District 8.0 - 10.0
Surubim Open Pit Mine 6.0 - 8.0
Boa Esperanҫa Project 7.0 - 9.0
Capital Expenditure Guidance $102.0 - $115.5
Curaçá Valley Exploration $30.0 - $35.0
NX Gold Mine 2021 Guidance
Capital Expenditure Guidance $13.0 - $15.0
Exploration 8.0- 10.0
Total, NX Gold Mine $21.0 - $25.0
(*) Guidance is based on certain estimates and assumptions, including but not limited to, mineral reserve estimates, grade and
continuity of interpreted geological formations and metallurgical performance. Please refer to the Company’s SEDAR
filings, including the Annual Information Form for the year ended December 31, 2020 and dated March 16, 2021 (the
“AIF”), for complete risk factors.
TSX: ERO
NYSE: ERO
8 Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada