Ero Copper intersects 27.4 meters grading 8.39% copper including 17.7 meters grading 10.76% copper in near-surface extension of Vermelhos East Zone discovery
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
DECEMBER 11, 2018 NR:18-17
Ero Copper intersects 27.4 meters grading 8.39% copper including 17.7 meters grading
10.76% copper in near-surface extension of Vermelhos East Zone discovery
Vancouver, British Columbia – Ero Copper Corp. (the “Company”) (TSX: ERO) is pleased to
provide a quarterly update on the ongoing exploration drill programs at its Pilar, Vermelhos and
Surubim mineral districts, all part of its 99.6% owned Vale do Curaçá Property located in Bahia
State, Brazil. Significant exploration results are highlighted below:
• Near-surface extensions of the recently announced Vermelhos East Zone highlighted by
holes:
o FVS-311 that intersected 27.4 meters grading 8.39% copper including 17.7 meters
grading 10.76% copper from 81.2 meters downhole;
o FVS-269 that intersected 26.3 meters grading 3.63% copper including 15.7 meters
grading 4.93% copper from 3.1 meters downhole; and,
o FVS-292 that intersected 16.5 meters grading 4.22% copper including 9.0 meters
grading 6.10% copper from 64.2 meters downhole.
These high-grade results are part of a group of 7 holes drilled within 100 meters of surface,
that when combined with analysis following the discovery of the Vermelhos East Zone,
including the results of the 11 holes outlined in this press release, confirm the Vermelhos
East Zone is not a discrete zone, but rather a semi-continuous mineralized structure
extending from the Vermelhos Mine (UG1 mining area) in a north-northeast direction to
the Vermelhos West deposit – a combined strike length of approximately 1.1 kilometers.
To date, the Vermelhos East Zone has been delineated from surface to a depth of
approximately 400 meters and remains open along strike and to depth. Further drill testing
to determine continuity of t he high-grade portions of the Vermelhos East Zone is a top
priority of the Company’s ongoing exploration efforts in the Vermelhos District.
• Within the Vermelhos Mine’s main orebodies, drill results continue to expand known areas
of high-grade mineralization in and around the mine’s recently completed infrastructure.
Results during the period are highlighted by holes:
o FVS-257 that intersected 38.2 meters grading 7.29% copper including 23.1 meters
grading 11.16% copper and 10.1 meters grading 4.59% copper;
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
o FVS-328 that intersected 38.2 meters grading 6.79% copper including 19.4 meters
grading 8.38% copper; and,
o FVS-331 that intersected 31.5 meters grading 8.72% copper and 8.5 meters grading
5.48% copper.
These results reflect significant increases in previously modeled thicknesses of the main
Vermelhos orebodies in the immediate areas surrounding these new intercepts. In addition,
the results are the product of the Company’s systematic, ongoing, borehole electromagnetic
(“EM”) program that is identifying EM targets within and adjacent to the main Vermelhos
deposit with positive results. The Company intends to expand the use of the borehole EM
to its other operations and regional exploration program to compliment the results from its
recently completed airborne geophysical survey.
This update encompasses exploration drill results received for the Company’s exploration
programs from August through to the end of November 2018. Expansions and e xtensions as
referenced herein reflect mineralization not captured in the Company’s mineral resource and
mineral reserve models used in the recently announced National Instrument 43-101, Standards of
Disclosure for Mineral Projects (“NI 43-101”) compliant mineral resource and reserve update (as
further detailed in the Company’s press release dated September 5, 2018). Currently, 19 drill rigs
are operating on the property.
VERMELHOS DISTRICT
The Vermelhos District is located approximately 80 kilometers to the north of the Pilar Mine and
Caraíba Mill complex and includes the newly constructed high -grade Vermelhos Mine. Drilling
is focused on expansion and new discovery initiatives (including the Vermelhos East Zone) within
and immediately adjacent to the Vermelhos Mine . Five drill rigs are currently operating within
the District.
Vermelhos East Zone Extension
The Vermelhos East Zone discovery ( see press release dated September 25, 2018 for
announcement of the Vermelhos East Zone discovery) is located approximately 100 meters to the
east of mineralization comprising the main Vermelhos orebodies and lies on the eastern side of an
intrusive body. The zone of mineralization, to date, has been delineated from surface copper oxide
mineralization to an interpreted depth of approximately 400 meters below surface. Recent drill
results, combined with data compilation work performed subsequent to the initial discovery ,
supports a new interpretation of the Vermelhos East Zone as a semi-continuous mineralized trend
extending from the UG1 mining area of the Vermelhos Mine to the Vermelhos West deposit – a
combined strike length of approximately 1.1 kilometers. The interpretation is based on the
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
compilation of 250 drill hole intercepts (including oxide drilling performed by the Company and
historical drilling incorporated into the current mineral resource estimate of the Vermelhos West
deposit). Additional test work is underway to further delineate the continuity of recently identified
high-grade mineralization within the overall mineralized trend.
During the period, r esults from 1 1 drill holes were received that highli ght extensions of the
Vermelhos East Zone, as shown in the following table. P lease see Figures 1 and 2 for collar
locations and Figure 3 for a north-south long section highlighting the 1.1 kilometer mineralized
trend of the Vermelhos East Zone.
Hole ID From (m) To (m) Length (m) Cu (%)
FVS-269* 3.1 29.4 26.3 3.63
including 12.7 28.3 15.7 4.93
FVS-278 121.4 127.4 6.0 1.15
FVS-284 50.1 58.9 8.8 1.18
FVS-285 327.6 331.2 3.6 1.43
and 336.8 339.8 3.0 1.45
FVS-286* 6.2 12.2 6.0 1.06
FVS-292 64.2 80.7 16.5 4.22
including 70.2 79.2 9.0 6.10
FVS-293 38.8 44.8 6.0 2.07
including 38.8 41.8 3.0 3.01
FVS-300 408.1 426.4 18.3 1.49
including 411.1 416.1 5.0 3.03
FVS-301 16.7 25.3 8.6 2.37
including 20.7 24.3 3.6 3.97
FVS-311 81.2 108.5 27.4 8.39
including 84.2 101.9 17.7 10.76
FVS-324 400.6 404.0 3.3 1.11
Drill holes were drilled from surface. Holes not included are either pending assay results, have been included in a
different section of this press release for clarity of discussing drill results or were previously included in a prior press
release. The length of intercept may not represent the true width of mineralization. Values may not add up due to
rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter. (*) indicates drill holes
with near-surface copper intercepts containing oxide mineralization.
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
Vermelhos Main Orebody Expansions
Exploration drilling within the main Vermelho s orebodies continues to target expansions and
extensions of the mineral resource, with a focus during the period on drilling several EM anomalies
identified during the Company’s systematic and ongoing bore hole EM program. Drilling during
the period continued to expand and extend the mineral resource and mineral reserve models of the
Vermelhos Mine as defined in the current NI 43-101 Technical Report.
Expansions within the Sombrero orebody of the Vermelhos Mine are highlighted by hole FVS -
256 that intersected 35.1 meters grading 2.70% copper including 12.3 meters grading 6.30%
copper and 8.2 meters grading 1.96% copper, hole FVS -257 that intersected 38.2 meters grading
7.29% copper including 23.1 meters grading 11.16% copper and 10.1 meters grading 4.59%
copper including 2.0 meters grading 18.07% coppe r. The mineralized thicknesses of these
intercepts are significant as they represent an approximate 40% increase in the modeled
thicknesses of the orebody in the immediate areas surrounding these holes within the current
mineral resource and reserve estimate.
Additionally, expansions of the Toboggan orebody of the Vermelhos Mine are highlighted by hole
FVS-328 that intersected 38.2 meters grading 6.79% copper including 19.4 meters grading 8.38%
copper and hole FVS -331 that intersected 31.5 meters grading 8.72% copper and 8.5 meters
grading 5.48% copper. The mineralized thicknesses of these intercepts are significant as they
represent an approximate 80% increase in the modeled thicknesses of the orebody in the immediate
areas surrounding these holes contained within the current mineral resource and reserve estimate.
During the period, results from 11 drill holes were received that highlight expansions of the main
Vermelhos orebodies, as shown in the following table. Please see Figure 1 for drill collar locations.
Hole ID From (m) To (m) Length (m) Cu (%)
FVS-256 115.4 150.5 35.1 2.70
including 130.4 142.7 12.3 6.30
and 156.5 164.6 8.2 1.96
FVS-257 147.6 185.8 38.2 7.29
including 149.6 172.8 23.1 11.16
and 193.2 203.3 10.1 4.59
including 198.6 200.6 2.0 18.07
FVS-260 177.7 189.3 11.6 1.12
FVS-283 176.9 209.9 32.9 2.77
including 185.3 187.4 2.1 12.43
FVS-285 172.6 186.8 14.1 1.32
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
Hole ID From (m) To (m) Length (m) Cu (%)
and 220.1 231.2 11.2 2.40
FVS-289 112.0 116.3 4.4 1.00
FVS-290 216.7 239.2 22.6 0.89
including 237.2 239.2 2.0 3.53
FVS-315 NSI NSI NSI NSI
FVS-322 93.5 95.9 2.5 2.34
and 118.4 123.7 5.3 1.94
and 191.2 195.2 4.0 0.88
FVS-328 184.8 222.9 38.2 6.79
including 185.8 205.1 19.4 8.38
FVS-331 179.1 210.6 31.5 8.72
and 215.6 224.1 8.5 5.48
NSI indicates no significant intercept, based on cut-off grade of 0.68% copper. Drill holes were drilled from surface.
Holes not included are either pending assay results, have been included in a different section of this press release for
clarity of discussing drill results or were previously included in a prior press release. The length of intercept may not
represent the true width of mineralization. Values may not add up due to rounding. From, to and mineralized intercepts
are rounded to the nearest tenth of a meter.
The main orebodies remain open to the north, south and to depth and one of the five drill rigs
operating at Vermelhos will continue to evaluate their extensions. The remaining four drill rigs
will continue to test the continuity of the Vermelhos East Zone over its 1.1 kilometer strike length.
Vermelhos Mine - Nickel and Palladium
Test work is underway to quantify the significance of recent occurrences of high-grade nickel and
palladium within the main Vermelhos orebodies at depth and their relationship to the known
copper mineral resource s. While, to date, average nickel grades in the orebodies , based on
approximately 1,300 drill core samples, are approximately 0.25% nickel, with a maximum assay
result of 5.09% nickel, recent grab samples taken from a development heading containing massive
pentlandite measuring approximately 1 meter by 1 meter at level +285 of the Sombrero orebody
returned assay values up to 21.7% nickel . While these grab samples are not representative and
should not be relied upon, the discovery of high grade, massive pentlandite within the deposit is
an unexpected positive development.
Additionally, over 500 samples of core have been recently analyzed for platinum group metal
(“PGM”) content. The results were anomalous for palladium with an average assay result of 0.19
grams per tonne palladium, and a maximum of 1.19 grams per tonne palladium. There is a strong
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
observed relationship between high-grade copper mineralization and palladium content based on
the samples analyzed to date.
In the New Year, a portion of the ongoing drill program at Vermelhos will focus on drilling deeper
holes below the Vermelhos main orebodies to test targets at depth and allow the Company to
conduct deeper downhole EM surveys to further evaluate the potential for additional copper, nickel
and PGM mineralization at Vermelhos.
PILAR DISTRICT
The Pilar District encompasses the area surrounding the Pilar underground mine, Caraíba M ill
complex and the past producing open pit Pilar and R22 M ines. Ten drill rigs are currently
operating within the District.
During the period, expansion and extensional drilling continued to focus on the West Limb and
Deepening Extension zone. Three underground and one surface drill rig are currently evaluating
the extent of the West Limb while four underground core rigs are operating in the Deepening
Extension zone (see the Company’s press release dated May 17, 2018 for the announcement of the
West Limb discovery) . One additional surface rig and one additional underground drill rig are
currently targeting other areas of the mine.
West Limb
Exploration drilling at the West Limb is focused on infill, extension and twin- hole drilling of the
previously announced West Limb discovery. Drilling has predominately focused on the area
beneath the past producing R22 open pit mine and extensions along strike to the north, highlighted
by hole FC5229 that intersected 61.5 meters grading 1.91% copper , 6.7 meters grading 0.95%
copper, 8.6 meters grading 1.20% copper and 4.0 meters grading 1.37% copper . Underground
drill rigs have recently commenced drill programs to test the southern extent of mineralization
within the West Limb.
During the period, results from 9 drill holes were received that highlight extensional drilling of the
West Limb, as shown in the following table. Please see Figure 4 for collar locations and Figure 5
for a cross section of the West Limb drill results.
Hole ID From (m) To (m) Length (m) Cu (%)
FC5041 419.2 467.2 48.0 1.31
FC5224 282.8 302.7 19.9 2.66
including 290.3 296.5 6.1 4.93
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
Hole ID From (m) To (m) Length (m) Cu (%)
FC5225 303.9 308.1 4.2 0.74
FC5226 264.2 271.0 6.8 4.71
and 275.0 285.0 10.0 1.27
FC5227 373.4 401.2 27.8 1.61
including 394.2 400.2 6.0 2.66
FC5228 239.1 249.9 10.9 1.62
including 243.0 249.9 6.9 1.83
and 257.9 259.9 2.0 2.41
and 270.9 279.3 8.4 1.60
FC5229 286.3 347.8 61.5 1.91
and 375.5 382.3 6.7 0.95
and 437.6 446.3 8.6 1.20
and 465.4 469.4 4.0 1.37
FC5230 325.8 331.8 6.0 0.91
and 336.8 342.8 6.0 0.93
and 364.5 372.7 8.2 1.63
FC5138 369.2 372.2 3.0 1.25
and 386.3 406.0 19.8 1.22
including 400.2 405.2 5.0 1.77
Drill holes were drilled from surface. Holes not included are either pending assay results, have been included in a
different section of this press release for clarity of discussing drill results or were previously included in a prior press
release. The length of intercept may not represent the true width of mineralization. Values may not add up due to
rounding. From, to and mineralized intercepts are rounded to the nearest tenth of a meter.
The Deepening Extension
The Deepening Extension drilling is currently targeting mineralization on the East Limb of the
Pilar Mine between level -725 and level -1040 approximately 1,200 meters to 1,500 meters below
surface and approximately 100 meters laterally from the current level of the primary ramp
(completed to level -881). During the period, results for 18 holes were received that continue to
demonstrate extensions of the modeled mineralization within the zone. The results are highlighted
by extensions beyond what was previously believed to be the southern limit of the Deepening
Extension zone in hole FC38151 that intersected 5.6 meters grading 5.36% copper as well as hole
FC38153 that intersected 8.3 meters grading 2.59% copper and 17.0 meters grading 2.05% copper.
These results indicate that the Deepening Extension remains open to the south.
TSX: ERO
Ero Copper Corp
625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada
In addition, hole FC44204, that intersected 6.0 meters grading 7.91% copper including 3.0 meters
grading 11.03% copper, was drilled approximately 330 meters north of the aforementioned holes
and approximately 225 meters south of the previously announced “Deep Discovery” holes ( see
press release dated June 6, 2018) . This hole encountered higher grade mineralization similar to
copper grades encountered previously within the Deepening Extension to the north (reference
previously announced hole FC4884 that intersected 18.0 meters grading 6.28% copper and
previously announced hole FC4986 that intersected 6.9 meters grading 5.82% copper and 15.4
meters grading 3.71% copper). High-grade copper intercepts have now occurred over a combined
north-south strike length of approximately 550 meters within the Deepening Extension zone.
Additional follow-up drilling to determine continuity of high- grade mineralization in this area is
currently underway.
During the period, r esults from 1 8 drill holes were received that highli ght extensions of the
Deepening Extension zone, as shown in the following table. Please see Figures 6 for a north-south
long section of the Deepening Extension zone and Figure 7 for collar locations.
Hole ID From (m) To (m) Length (m) Cu (%)
FC38146 150.6 158.6 8.0 1.07
FC38147 NSI NSI NSI NSI
FC38148 NSI NSI NSI NSI
FC38150 210.0 216.4 6.4 1.14
FC38151 136.1 141.7 5.6 5.36
FC38152 183.3 186.8 3.5 0.99
FC38153 274.6 282.9 8.3 2.59
and 294.1 311.2 17.0 2.05
FC38154 110.0 115.7 5.7 1.02
FC42239 NSI NSI NSI NSI
FC42241 NSI NSI NSI NSI
FC42243 339.2 343.2 4.0 0.97
FC42252 274.4 283.6 9.2 1.37
FC44200 255.0 260.1 5.0 1.97
including 256.9 260.8 3.9 2.41
FC44201 154.9 169.4 14.5 2.04
FC44204 200.4 206.4 6.0 7.91
including 202.4 205.4 3.0 11.03
FC44214 334.2 343.2 9.0 2.39
including 334.2 338.2 4.0 4.07
FC44222 379.3 383.3 4.0 1.79