Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ERO.TO ·

Ero Copper Files Technical Report for the NX Gold Mine

Resource Estimates Technical Reports (NI 43-101)

TSX: ERO

Ero Copper Corp

625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada

JANUARY 21, 2019 NR:19-2

Ero Copper Files Technical Report for the NX Gold Mine

Vancouver, British Columbia – Ero Copper Corp. ( “Ero” or the “Company”) (TSX: ERO)

announces that it has filed a t echnical report for its 97.6% owned NX Gold Mine (“NX Gold”),

located in Mato Grosso State, Brazil. Highlights of NX Gold’s initial technical report include:

• The high-grade nature of the mine with initial mineral reserve grade of 11.40 grams per

tonne (“gpt”) gold and initial mineral resource grade of 16.01 gpt gold;

• Low operating costs (average C1 cash costs of US$594 per ounce of gold produced); and,

• A large mineral licence package (31,716 hectares) allowing for an aggressive self-funded

exploration program currently comprised of five exploration drill rigs (one additional drill

rig scheduled to arrive during Q1 2019) to rapidly increase mineral resources and reserves.

“Building on the strong production result from NX Gold in 2018 that produced nearly 40,000

ounces of gold, t his report serves as a baseline from which to continue to grow the mining

operation. With 5 drill rigs currently operating on the property, undertaking programs focused on

increasing the mineral resource and mineral reserve base and extending the mine’s life, we believe

that there is considerable value remaining to be unlocked. Additionally, the planned exploration

programs underway are expected to be fully funded by the mine’s internally generated cash flow.

We see similar opportunities at NX Gold as we have found at our MCSA operations in Bahia,

including a large under-explored land package, an under-utilized mill currently operating at one-

third of its installed capacity, opportunity to further increase throughput with minimal capital

expenditure and high grades that support low operating costs and high margins.” commented

David Strang, President & CEO of Ero Copper.

The Company intends to provide an update on the ongoing exploration activities at NX Gold in its

regular quarterly exploration updates, as well as provide an updated technical report including new

mineral resource and reserve estimates during the third quarter of 2019. In addition, NX Gold will

no longer be classified as an asset held for sale for reporting purposes, and going forward, will be

consolidated into Ero’s financial results along with MCSA.

TSX: ERO

Ero Copper Corp

625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada

The NX Gold mineral reserve and resource estimate is shown in the table below:

Classification Tonnage

(000 tonnes)

Grade

(gpt Au)

Au Contained

(000 ounces)

Reserves

Probable, Brás Vein 63.4 11.40 23.3

Probable, Buracão Vein 2.4 12.30 1.9

Total Probable 65.8 11.40 25.2

Resources (including Reserves)

Indicated, Brás Vein 80.9 15.04 39.1

Indicated, Buracão Vein 4.8 30.39 4.7

Total Indicated 85.7 16.01 44.1

Inferred 41.3 19.13 25.4

Mineral Reserve & Resource Notes:

1. Effective date of August 31, 2018.

2. Presented mineral resources inclusive of mineral reserves. All figures have been rounded to the relative

accuracy of the estimates. Summed amounts may not add due to rounding.

3. Mineral resource gold cut-off grade of 1.40 gpt gold. Mineral resources have been estimated using ordinary

kriging inside 10m by 10m by 2 m block sizes (with sub-blocks of 2.5m by 2.5m by 0.5m) . The mineral

resource estimates were prepared in accordance with the Canadian Institute of Mining , Metallurgy and

Petroleum (“CIM”) Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM

Council on May 10, 2014 (the “CIM Standards”), and the CIM Estimation of Mineral Resources and Mineral

Reserves Best Practice Guidelines, adopted by CIM Council on November 23, 2003 (the ‘CIM Guidelines”),

using geostatistical and/or classical methods, plus economic and mining parameters appropriate to the

deposit.

4. Mineral reserve estimates were prepared in accordance with the CIM Standards and the CIM Guidelines,

using geostatistical and/or classical methods, plus economic and mining parameters appropriate for the

deposit. Mineral reserves are based on a long-term gold price of US$1,250 per ounce (“oz”), and a USD:BRL

foreign exchange rate of 3.20. Mineral Reserves are the economic portion of the Indicated Mineral Resources.

Mineral Reserve estimates include mining dilution at 5% grading 0.5g/t Au and 7% grading 0.5g/t Au for the

Brás and Buracão Veins, respectively. Assumes mining recovery of 95%. Practical mining shapes

(wireframes) were designed using geological wireframes / mineral resource block models as a guide.

Mineral resources which are not mineral reserves do not have demonstrated economic viability.

TSX: ERO

Ero Copper Corp

625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada

The technical report was prepared in accordance with the Canadian Securities Administrator’s National

Instrument 43-101 – Standards of Disclosure for Mineral Projects, and can be found on the Company’s

website (www.erocopper.com) and on SEDAR (www.sedar.com).

Non-IFRS Measures

The Company utilizes certain non-IFRS measures, including C1 cash cost of gold produced, which

are not measures recognized under IFRS. The Company believes that these measures, together

with measures determined in accordance with IFRS, provide investors with an improved ability to

evaluate the underlying performance of the Company. Non- IFRS measures do not have any

standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar

measures employed by other companies. The data is intended to provide additional information

and should not be considered in isolation or as a substitute for measures of performance prepared

in accordance with IFRS.

C1 cash cost of gold produced (per oz) is the sum of production costs, net of capital expenditure

development costs and by -product credits, divided by the gold ounces produced. C1 cash costs

reported by the Company include treatment, refining charges, and other offsite costs. Silver b y-

product credits are calculated based on actual silver metal sales (net of treatment costs) during the

period divided by the total ounces of gold produced during the period. C1 cash cost of gold

produced per ounce is a non-IFRS measure used by the Company to manage and evaluate operating

performance of the Company’s operating mining unit, and is widely reported in the mining

industry as benchmarks for performance, but does not have a standardized meaning and is

disclosed in addition to IFRS measures.

QUALITY ASSURANCE / QUALITY CONTROL

Database QA/QC Validation

In order to validate the current mineral resource estimate, GE21 Consultoria Mineral Ltda.

(“GE21”) selected a series of QA/QC samples , including blanks, duplicate and standard control

samples from those performed by NX Gold. The set of samples was taken from the current mineral

resource estimate zone as well as adjacent areas. In the opinion of GE21, blank, standard and

duplicate sample analysis w as found to be within the acceptance limits for the c lassification of

mineral resources. No sample or database biases were detected. This work was supplemented by

drill hole database validation performed using the Geovia Surpac software database tool which

looks to validate final depth, overlapping results and drill hole collar information. No

inconsistencies or errors were found in the drill database review.

TSX: ERO

Ero Copper Corp

625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada

QA/QC Program

Drill core is logged, photographed and split in half using a diamond core saw at NX Gold’s secure

core logging and storage facilities. Half of the drill core is retained on site and the other half-core

is used for analysis, with samples collected on a minimum of 0.2 meters and a maximum of 2.0

meters with an average length of 0.5 meters. Sampling commences at least 1.0 meter before the

start of the mineralized zone and continues at least 1.0 meters beyond the limit of the mineralized

zone. All sample preparation is performed in NX Gold’s secure on-site laboratory. Gold content

is determined using fire assay. All recent sample results have been monitored through a QA/QC

program that includes the insertion of certified standards, blanks, and pulp and reject duplicate

samples at a rate of 1 standard, 1 blank, a nd 1 duplicate pulp sample per every 20 samples for a

blended rate of approximately 5%.

Qualified Persons and the NI 43-101 Technical Report

Sr. Porfirio Cabaleiro Rodriguez, MAIG, has reviewed and approved the scientific and technical

information contained in this news release. Mr. Rodriguez is independent of the Company and is

a Qualified Person as defined by NI 43-101.

For additional scientific and technical information please refer to the NI 43 -101 compliant

technical report entitled “Mineral Resource and Mineral Reserve Estimate of the NX Gold Mine,

Nova Xavantina” prepared by Porfírio Cabaleiro Rodriguez, MAIG, Leonardo Apparicio da Silva,

MAIG and Leonardo de Moraes Soares, MAIG all of GE21, who are independent qualified persons

under NI 43- 101, available on on SEDAR ( www.sedar.com) and on the Company’s website

(www.erocopper.com).

TSX: ERO

Ero Copper Corp

625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada

ABOUT ERO COPPER CORP

Ero Copper Corp, headquartered in Vancouver, B.C., is focused on copper production growth from

the Vale do Curaçá Property, located in Bahia, Brazil. The Company’s primary asset is a 99. 6%

interest in the Brazilian copper mining company, MC SA, 100% owner of the Vale do Curaçá

Property with over 39 years of operating history in the region. The Company curr ently mines

copper ore from the Pilar underground mine, the Surubim open pit mine, the R22W open pit mine

and its newly constructed Vermel hos underground mine. In addition to the Vale do Curaçá

Property, Ero owns, directly and indirectly (through MCSA), 100% of the Boa Esperanҫa

development project, an IOCG -type copper project located in Pará, Brazil and 97.6% of the NX

Gold Mine, an operat ing gold and silver mine located in Mato Grosso, Brazil . Additional

information on the Company and its operations, including Technical Reports on the Vale do

Curaçá, Boa Esperanҫa and NX Gold properties, can be found on the Company’s website

(www.erocopper.com) and on SEDAR (www.sedar.com).

TSX: ERO

Ero Copper Corp

625 Howe Street | Suite 1050 | Vancouver | BC | V6C 2T6 | Canada

ERO COPPER CORP.

Signed: “David Strang” For further information contact:

David Strang, President & CEO Makko DeFilippo, Vice President, Corporate Development

(604) 429-9244

[email protected]

CAUTION REGARDING FORWARD LOOKING INFORMATION AND STATEMENTS This Press Release contains “forward -looking information” within the

meaning of applicable Canadian securities laws. Forward-looking information includes statements that use forward-looking terminology such as “may”,

“could”, “would”, “will”, “should”, “intend”, “target”, “plan”, “expect”, “budget”, “estimate”, “forecast”, “schedule”, “anti cipate”, “believe”, “continue”,

“potential”, “view” or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Such forward -looking

information includes, without limitation, statements with respect to the potential to unlock additional value of the NX Gold Mine, estimation and potential

for increasing the mineral reserves and mineral resources of the NX Gold Mine, potential increases to the mine life, projected mill capacity and utilization

as well as opportunities to further increase mill capacity (and associated capital costs), all plans for future exploration, including funding requirements

for such programs, and the anticipated timing of future exploration updates including an updated technical report.

Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of manag ement in

light of management’s experience and perception of trends, current conditions and expected developments, as well a s other factors that management

believes to be relevant and reasonable in the circumstances, as of the date of this Press Release including, without limitati on, assumptions about:

favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production,

development and exploration of the Company’s properties and assets; future prices of copper and other metal prices; the timing and results of exploration

and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the Vale do Curaçá Property and the Boa

Esperanҫa Property being as described in the technical reports for these properties; production costs; the accuracy of budgeted exploration and

development costs and expenditures; the price of other commodities such as fuel; future currency exchange rates and interest rates; operating

conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; p olitical and regulatory stability; the

receipt of governmental, regulatory and third party approvals, licenses and permits on favourable terms; obtaining required renewals for existing

approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital

goods markets; availability of equipment; positive relations with local groups and the Company’s ability to meet its obligati ons under its agreements

with such groups; and satisfying the terms and conditions of the Company’s current loan arrangements. While the Company considers these assumptions

to be reasonable, the assumptions are inherently subject to significant business, social, economic, political, regulatory, competitive and other risks and

uncertainties, contingencies and other factors that could cause actual actions, events, conditions, results, performance or achievements to be materially

different from those projected in the forward-looking information. Many assumptions are based on factors and events that are not within the control of

the Company and there is no assurance they will prove to be correct.

Furthermore, such forward-looking information involves a variety of known and unknown risks, uncertainties and othe r factors which may cause the

actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions,

activities, results, performance or achievements expressed or implied by such forward -looking information. Such risks include, without limitation the

risk factors listed under the heading “Risk Factors” in the Annual Information Form of the Company for the year ended December 31, 2017, dated March

28, 2018.

Although the Company has attempted to identify important factors that could cause actual actions, events, conditions, results, performance or

achievements to differ materially from those described in forward-looking information, there may be other factors that cause actions, events, conditions,

results, performance or achievements to differ from those anticipated, estimated or intended.

The Company cautions that the foregoing lists of important assumptions and factors are not exhaustive. Other events or circum stances could cause

actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking information contained herein.

There can be no assurance that forward -looking information will prove to be accurate, as actual res ults and future events could differ materially from

those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information.

Forward-looking information contained herein is made as of the date of this news release and the Company disclaims any obligation to update or revise

any forward-looking information, whether as a result of new information, future events or results or otherwise, except as and to the extent required by

applicable securities laws.

CAUTIONARY NOTES REGARDI NG MINERAL RESOURCE AND RESERVE ESTIMATE S In accordance with applicable Canadian securities regulatory

requirements, all mineral reserve and mineral resource estimates of the Company disclosed or incorporated by reference in this news release have been

prepared in accordance with NI 43-101 and are classified in accordance with the CIM Standards.

Mineral resources which are not mineral reserves do not have demonstrated economic viability. Pursuant to the CIM Standards, mineral resources have

a higher degree of uncertainty than mineral reserves as to their existence as well as their economic and legal feasibility. Inferred mineral resources,

when compared with Measured or Indicated mineral resources, have the least certainty as to the ir existence, and it cannot be assumed that all or any

part of an Inferred mineral resource will be upgraded to an Indicated or Measured mineral resource as a result of continued exploration. Pursuant to NI

43-101, Inferred mineral resources may not form the basis of any economic analysis. Accordingly, readers are cautioned not to assume that all or any

part of a mineral resource exists, will ever be converted into a mineral reserve, or is or will ever be economically or legally mineable or recovered.