Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ERD.TO ·

Erdene Intersects 30 Metres of 1.25% Copper IN Khuvyn Khar Porphyry System

Drill Results

TSX: ERD | OTC:ERDCF | MSE: ERDN

www.erdene.com [email protected]

ERDENE INTERSECTS 30 METRES OF 1.25% COPPER

IN KHUVYN KHAR PORPHYRY SYSTEM

Highlights:

• Intersected 65 metres averaging 0.63% copper (“Cu”) and 2.9 g/t silver (“Ag”)

mineralization, including 30 metres averaging 1.25% Cu and 6.1 g/t Ag

• Mineralized zone extends from 238 meters downhole, ending in mineralization at

450 metres, characterized by moderate to intense potassic alteration with

associated copper mineralization

• Hole is three kilometres from the Zuun Mod molybdenum-copper deposit and

interpreted to be part of the same porphyry system

• Located on a wholly owned mining license 35 kilometres east of the Bayan Khundii

Gold Mine in southwest Mongolia, approximately 200 kilometres from China

• Further exploration planned in 2026 to test the potential of the Khuvyn Khar copper

porphyry system at depth

Press Release

Halifax, Nova Scotia

2026.01.14

Erdene Resource Development Corporation (TSX: ERD | OTC: ERDCF | MSE: ERDN)

(“Erdene” or the “Company”) is pleased to announce results from drilling at its wholly

owned Khuvyn Khar copper-silver prospect, located three kilometres northwest of the

Zuun Mod (“ZM”) deposit and 35 kilometres east of the Bayan Khundii Gold Mine, in the

Khundii Minerals District in southwestern Mongolia (See Figures 1 and 2).

Quotes from the Company

Peter Akerley, Erdene’s President and CEO stated, “Today’s drill results confirm a

substantial copper component to the Khuvyn Khar porphyry system beyond the

molybdenum-copper deposit defined at the nearby Zuun Mod project. This copper

mineralized zone is characteristic of the upper levels of a copper porphyry system.”

Mr. Akerley continued, “Khuvyn Khar and Zuun Mod are located approximately 200

kilometers from China, the world’s largest copper and molybdenum consumer. The

Khuvyn Khar license lies within a region in Mongolia that has seen significant recent

infrastructure investments, supporting development of large-scale projects in the Khundii

Minerals District.”

Mr. Akerley concluded, “With the Bayan Khundii gold mine in production, we are now

expanding our exploration efforts in the Khundii Minerals District. Advanced geophysical

surveys and drilling are planned for 2026 to follow up on today’s exciting results from

Khuvyn Khar. Concurrently exploration is underway to expand gold resources near the

Bayan Khundii mine operated in a strategic alliance with Mongolian Mining Corporation

(“MMC”).”

TSX: ERD | OTC:ERDCF | MSE: ERDN

www.erdene.com [email protected]

Khuvyn Khar & Zuun Mod Drill Program – Q4 2025

A 3,362-metre, 24-hole drill program was recently completed on the wholly-owned

Khuvyn Khar license, which hosts the Khuvyn Khar copper porphyry system, including

the Zuun Mod molybdenum-copper deposit.

The program included 18 holes testing the upper 150 metres of the Zuun Mod deposit,

and one hole extension, seeking to improve confidence and continuity of ore grade

molybdenum (“Mo”) mineralization. A further three scout holes were drilled to follow-up

on a new gold zone on the license, 3.8 kilometres west of the Zuun Mod deposit, and two

holes were drilled to test copper porphyry targets, including ZMD-162. With the exception

of ZMD-162, reporting of assay results is pending. Results for the Zuun Mod deposit

drilling will be incorporated into a preliminary economic assessment, scheduled to be

delivered in mid-2026.

Today’s release highlights exploration hole ZMD-162 in the Khuvyn Khar (“KK”) copper

target, three kilometres northwest of the Zuun Mod deposit (See Figure 3). ZMD-162

follows up on a high-grade copper intersection, ZMD-121, which intersected 34 meters of

1.3% copper and 9.2 g/t silver starting at 308 metres, completed in December 2010.

Khuvyn Khar exhibits the characteristics of a copper (“Cu”) porphyry system including

alteration assemblages, vein types and Cu-Mo ratios. The Zuun Mod Cu-Mo deposit is

interpreted as a molybdenum rich zone within this large copper porphyry system.

Exploration to date on the copper-rich portion of the system has intersected anomalous

copper mineralization over an expansive area, characterized by the following:

• The KK copper porphyry system covers approximately 20 square kilometers

• The system is fertile for copper, molybdenum and silver mineralization (possibly

gold, as demonstrated by anomalous gold miner alization identified along the

periphery of the surface alteration zone);

• The interpreted level of erosion of the KK porphyry system, an important factor in

older porphyry systems like KK, is such that the core of the system is expected to

be preserved:

• High-grade copper mineralization has been intersected, including in ZMD-162, as

reported in this release and ZMD-121;

• Large areas of the system remain untested by drilling and no part of the Khuvyn

Khar copper prospect has been tested below 500 metres depth (See Figures 3

and 4);

• Average drilling depth at the Zuun Mod Mo-Cu deposit is 370 metres with a single

hole in the molybdenum deposit extended to 852 metres depth, which ended in

mineralization; (ZMD-57) (See Figure 4);

• Mineralized porphyry systems can extend vertically for kilometres, including at the

Oyu Tolgoi deposit, located in Mongolia, 670 kilometres to the east, where

mineralization extends beyond 2,000 metres and is open at depth (See Figure 4).

With a renewed focus on developing resources outside Bayan Khundii, now that the

Bayan Khundii Gold Mine is in operation, the Company is planning to undertake

TSX: ERD | OTC:ERDCF | MSE: ERDN

www.erdene.com [email protected]

aggressive exploration in 2026 to test the potential of the Khuvyn Khar copper porphyry

system at depth (See Figures 3 and 4).

Khuvyn Khar Drilling Results

The northern portion of the Khuvyn Khar copper porphyry complex hosts a large area of

disseminated copper mineralization associated with a multi-kilometre-scale zone

(approximately 20 square kilometre footprint) of hydrothermal altered intrusive units and

breccias. Multiple copper-mineralized zones have been previously intersected in wide-

spaced drilling. Copper mineralized intervals include hydrothermally altered intrusive

breccias with potassic altered and mineralized fragments suggesting a deeper source of

the mineralization. The highest-grade copper mineralization previously reported was in

hole ZMD-121 that intersected 34 metres of 1.3% copper and 9.24 g/t silver from 308 to

342 metres, vertical depth.

Drill hole ZMD-162 was designed to expand on the mineralization intersection in ZMD-

121, completed in late 2010. ZMD-162 was collared 125 metres from ZMD-121 and drilled

on a southwest azimuth, toward ZMD-121, and intersected the reported mineralized

interval at 286 metres (269 metres vertical depth), returning 65 metres of 0.63% copper

and 2.9 g/t silver mineralization, including a higher grade zone of 30 metres averaging

1.25% Cu and 6.1 g/t Ag. The altered and mineralized zone extends from 238 meters

downhole to the end of the hole at 450 metres, characterized by moderate to intense

potassic alteration with associated chalcopyrite (Cu) and pyrite mineralization. Zones of

highest copper and silver mineralization are within quartz potassium-feldspar granite with

sulphide content of 5 to 40%.

Summary of Significant Assay Results

Hole ID From To Interval1 Cu % Ag g/t

ZMD-162 286 351 65 0.63 2.9

Including 298 328 30 1.25 6.1

1Reported intervals in this release are downhole apparent widths. Continued exploration is required to confirm anisotropy of

mineralization and true thicknesses

The copper and silver mineralization intersected in ZMD-121 and ZMD-162 is associated

within intrusive rocks exhibiting magmatic textures commonly found in the upper portions

(cupola zone) of a porphyry system. The presence of these cupola textures and

associated copper mineralization indicates a well mineralized hydrothermal system exists

at Khuvyn Khar at a level of erosion that indicates the center of the mineralized porphyry

system should be preserved and not eroded away. It is common for mineralization in

large porphyry systems, that develop over millions of years, to extend over 100s and even

1000s of metres of depth and over large areas. For example, the mineralization in the

Oyu Tolgoi deposit, located in southern Mongolia, 670 kilometres to the east, extends

over a strike distance of over 12 kilometres and from surface to over 2000 metres depth.

TSX: ERD | OTC:ERDCF | MSE: ERDN

www.erdene.com [email protected]

About the Zuun Mod Molybdenum-Copper Project

The Zuun Mod Molybdenum-Copper Project is in Bayankhongor Province, Mongolia, 180

kilometres northwest of a major mining district and the border with China, the world’s

largest copper and molybdenum consumer and steel producer. The 100% owned 6,041-

hectare mining license, underpinning the Project, was issued in 2011 and is valid for up

to an additional 60 years. The Project is located approximately 35 kilometres east of

Erdene’s Bayan Khundii Gold Project.

Erdene undertook a multi-year exploration program outlining the Zuun Mod molybdenum-

copper deposit, within the large Khuvyn Khar copper porphyry complex and identified

multiple copper and molybdenum prospects, within the outer rim of the 16-kilometre

circumference porphyry complex. Given the Company’s focus on its gold projects in

recent years, only modest exploration and technical studies have been conducted over

the Khuvyn Khar license since 2011.

In October 2025, Erdene released an updated resource statement for the Zuun Mod Mo-

Cu deposit. The updated mineral resource includes Measured and Indicated resources

of 271.1 million tonnes (“Mt”) grading 0.056% Mo and 0.064% Cu (0.073% Moly

Equivalence (“MoEq”)) for 439.2 million pounds (“Mlbs”) MoEq. As well as an Inferred

resource of 269.1 Mt grading 0.051% Mo and 0.059% Cu (0.070% MoEq) for 416.3 Mlbs

MoEq. The cut-off grade for the resource is 0.035% Mo and constrained to a conceptual

pit based on US$22/lb Mo. The MoEq was calculated using the following formula: MoEq%

= Mo % + Cu % * 0.27504 and assumes 83% Mo and 81% Cu metallurgical recoveries.

Please refer to the Company’s October 10, 2025 press release for further details.

Qualified Person

Peter Dalton, P.Geo. (Nova Scotia), Senior Geologist for Erdene, is the Qualified Person

as that term is defined in National Instrument 43-101 and has reviewed and approved the

technical information contained in this news release. All samples have been assayed at

SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal checks by SGS

Laboratory, the Company incorporates a QA/QC sample protocol utilizing prepared

standards and blanks. All samples undergo combined multi -element ICP-OES

(Inductively coupled plasma optical emission spectroscopy).

Erdene’s drill core sampling protocol consisted of collection of samples in 1 to 2 metre

intervals over the entire length of the drill hole, excluding minor post-mineral lithologies

and dykes as required. Sample intervals were based on meterage, not geological controls,

or mineralization. All drill core was cut in half with a diamond saw, with half of the core

placed in sample bags and the remaining half securely retained in core boxes at Erdene’s

Bayan Khundii exploration camp. All samples were organized into batches of 30 including

a commercially prepared standard, blank and either a field duplicate, consisting of two

quarter-core intervals, or a laboratory duplicate. Sample batches were periodically

shipped directly to SGS in Ulaanbaatar.

Reported intervals are apparent thicknesses, i.e., downhole widths. The Zuun Mod drill

hole (reported in this release) was dipping at 70 degrees. Additional study is required to

TSX: ERD | OTC:ERDCF | MSE: ERDN

www.erdene.com [email protected]

confirm true widths. Reported grades for intervals are weighted averages based on

length of sampling intervals. No top cut has been applied.

About Erdene

Erdene Resource Development Corp. is a Canada-based resource company producing

gold at the high-grade, low-cost Bayan Khundii Gold Mine in underexplored and highly

prospective Mongolia. The Company has interests in a portfolio of precious and base

metal projects in close proximity to the Bayan Khundii Gold Mine in the Khundii Minerals

District, which provides a robust organic growth pipeline. Erdene Resource Development

Corp. is listed on the Toronto (“ERD”) and the Mongolian stock (“ERDN”) exchanges and

OTCQX Market (“ERDCF”). Further information is available at www.erdene.com.

Important information may be disseminated exclusively via the website; investors should

consult the site to access this information.

Forward-Looking Statements

Certain information regarding Erdene contained herein may constitute forward-looking

statements within the meaning of applicable securities laws. Forward-looking statements

may include estimates, plans, expectations, opinions, forecasts, projections, guidance, or

other statements that are not statements of fact. Although Erdene believes that the

expectations reflected in such forward-looking statements are reasonable, it can give no

assurance that such expectations will prove to have been correct. Erdene cautions that

actual performance will be affected by several factors, most of which are beyond its

control, and that future events and results may vary substantially from what Erdene

currently foresees. Factors that could cause actual results to differ materially from those

in forward-looking statements include the ability to obtain required third party approvals,

market prices, exploitation, and exploration results, continued availability of capital and

financing and general economic, market or business cond itions. The forward-looking

statements are expressly qualified in their entirety by this cautionary statement. The

information contained herein is stated as of the current date and is subject to change after

that date. The Company does not assume the oblig ation to revise or update these

forward-looking statements, except as may be required under applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE

CONTENTS OF THIS RELEASE

Erdene Contact Information

Peter C. Akerley, President and CEO, or

Robert Jenkins, CFO

Phone: (902) 423-6419

Email: [email protected]

Twitter: https://twitter.com/ErdeneRes

Facebook: https://www.facebook.com/ErdeneResource

LinkedIn: https://www.linkedin.com/company/erdene-resource-development-corp-/

FOCUSED ON THE UNDER-EXPLORED TRANS ALTAI TERRANE IN

SOUTHWESTERN MONGOLIA

20 km

Landsat 8 True Colour Shallow, High-Grade, Gold and Polymetallic Deposits and Prospects

Significant opportunity to extend mine-life:

Three other deposits delineated within vicinity and +20 additional prospects

Exploration License

Mining License

Prospect

Deposit

Au

Cu

Mo

Bayan Khundii Gold Mine

Discovered:2015

High-grade, open-pit gold project;

>600koz >2.5g/t Au resource

Ulaan SE Gold Discovery

Discovered:2021

Blind-top discovery

Discovered:2012

Gold polymetallic deposit

>500koz Au resource @ ~ 2g/t

Altan Nar Gold DepositN

KHUNDII MINERALS DISTRICT – MULTIPLE HIGH-QUALITY DEPOSITS AND PROSPECTS

Four Gold Discoveries, Molybdenum-Copper Deposit and +20 High Priority Targets

50% INTEREST +ROYALTY

100%INTEREST

Zuun Mod Molybdenum & Copper Deposit

Largest advanced, undeveloped molybdenum-

copper project in Asia; >600Mlbs molybdenum

Dark Horse Gold Deposit

Discovered: 2021

High-grade, near surface discovery

62koz @ 2.8g/t Au resource

Copper Porphyry System

Khuvyn Khar

Khuvyn Khar Copper discovery

0.63% Copper over 65 metres

(ZMD-162)

2 km

Copper in soil anomaly

Zuun Mod Deposit Tonnage Mo Grade Cu Grade MoEq Contained Mo Contained Cu MoEq

Classification (Mt) (%) (%) (%) (Mlbs) (Mlbs) (Mlbs)

Measured 45.8 0.057 0.062 0.074 57.7 62.2 74.8

Indicated 225.3 0.056 0.065 0.073 275.9 322.0 364.4

M&I 271.1 0.056 0.064 0.073 333.5 384.2 439.2

Inferred 269.1 0.051 0.059 0.070 300.0 350.7 416.3

Zuun Mod Deposit Mo-Cu

Copper in Soil (ppm)

50

>400

KHUVYN KHAR PORPHYRY SYSTEM: 20km² CIRCULAR COPPER ANOMALY

Multi-phase Metal Complex: Molybdenum -Copper and Copper-Silver

N