Resource Estimates

Erdene Announces Resource Estimate for the High-Grade Khundii Gold

Project

Halifax, Nova Scotia – September 18, 2018 - Erdene Resource Development Corp. (TSX:ERD)

("Erdene" or "Company"), is pleased to announce the Mineral Resource estimate for its 100%-

owned Khundii Gold Project in southwest Mongolia, prepared by RPMGlobal in accordance with the

definition standards of National Instrument 43-101 (“NI 43-101”).

The Khundii Gold Project includes the Company’s high-grade Bayan Khundii and Altan Nar

deposits, located 16 kilometres apart. Today’s announcement includes the Maiden Mineral Resource

estimate for the Bayan Khundii deposit and incorporates the significant increase in the NI 43-101

Mineral Resource for the Altan Nar deposit reported by the Company in May 2018. These deposits

are shallow and high-grade, outcropping and located within the newly discovered Khundii Gold

District.

Highlights (see attached figures for reference)

• Khundii Gold Project Total Resource:

− 751,000 ounces gold at an average grade of 2.3 g/t gold, Measured and Indicated; and,

− 291,000 ounces gold at an average grade of 1.8 g/t gold, Inferred.

• At a higher cut-off grade of 1.4 g/t gold, the Khundii Gold Project contains:

− 642,000 ounces gold at an average grade of 3.7 g/t gold, Measured and Indicated,

including, 357,000 ounces gold at an average grade of 5.2 g/t gold at the Bayan Khundii

deposit.

• Including precious and base metals, the Khundii Gold Project includes:

− 886,000 ounces gold equivalent (“AuEq”) at an average grade of 2.7 g/t AuEq, Measured

and Indicated; and

− 382,000 ounces AuEq at an average grade of 2.3 g/t AuEq, Inferred.

• Work has commenced on the Preliminary Economic Assessment for the Khundii Gold Project,

expected to be announced in Q4-2018

“With the results of the maiden Bayan Khundii resource estimate, we have met our initial resource

target for the Khundii Gold Project at grades significantly higher than the global average of

producing open pit gold mines,” said Peter Akerley, Erdene’s President and CEO. “The Bayan

Khundii and Altan Nar deposits provide synergies for our Company and represent a compelling

development opportunity given their high-grades, proximity to surface and favorable metallurgy. We

will incorporate these two resource estimates into a Preliminary Economic Assessment for the

Khundii Gold Project by year-end and expect to submit mining license applications for both deposits

in early 2019. At the same time, we continue our regional exploration program with drilling currently

underway testing multiple targets, designed to expand current resources and discover new deposits in

this newly discovered gold district.”

A supporting NI 43-101 Technical Report will be filed on SEDAR at www.sedar.com within 45 days

of this release.

Overview of Mineral Resource Estimate

Bayan Khundii is located 16 kilometres southeast of Erdene’s Altan Nar high -grade gold-

polymetallic deposit, where the Company announced a significant increase to the mineral resource on

May 10, 2018 (click to read news release). The two resource estimates are considered a single project

(Khundii Gold Project) for future economic and technical development studies, and are discussed

herein as the Khundii Gold Project Resource Estimate (Table 1).

The Bayan Khundii Maiden Mineral Resource Estimate (“Mineral Resource”) was prepared in

accordance with NI 43-101 by RPMGlobal Asia Limited (“RPM”) and is dated effective September

12, 2018. The reported Mineral Resource (Table 2) is based on information provided to RPM by

Erdene and verified where possible by RPM. All statistical analysis and mineral resource estimations

were carried out by RPM. A final NI 43-101 Mineral Resource estimate and Technical Report will be

filed on SEDAR within 45 days. The Mineral Resource incorporates 255 diamond drill holes totaling

42,656 metres, completed between Q4-2015 and Q2-2018. The Mineral Resource is contained

within a near-surface, shallow-dipping and strongly mineralized system (intercepts up to 2,200 g/t

gold as previously reported) that extends over an area of 1.2 kilometres (NE-SW) and 200 to 400

metres (NW-SE). Grade capping for the purposes of the Bayan Khundii deposit resource estimate

averaged 51 g/t gold for high-grade domains (range from 8 g/t to 250 g/t gold) and a maximum of 1.5

g/t gold for the low and medium grade domains.

RPM estimated the Khundii Gold Project Mineral Resource at a number of gold cut-offs, however,

RPM recommends reporting the Bayan Khundii Mineral Resource at a 0.6 g/t gold cut-off and the

Altan Nar Mineral Resource a 0.7 g/t AuEq above a pit and 1.4 g/t AuEq below the same pit shell.

A sensitivity analysis of the grade and tonnage relationships at cut-off grades is shown in the Tables

below.

Table 1. Khundii Gold Project Mineral Resource Estimate, as at September 12, 2018

(Gold and Gold-Equivalent Mineral Resources, at Various Cut-Off Grades)

Cut-off

Grade(1)

Resource

Classification

Quantity

(Mt)

Grade

Au g/t

Gold

Koz

Grade

AuEq g/t

AuEq

Koz

0.2 Measured 4.3 1.4 194 1.4 194

Indicated 19.3 1.1 710 1.4 852

Measured & Indicated 23.6 1.2 904 1.4 1,046

Inferred 16.8 0.8 416 1.0 511

0.4 Measured 2.4 2.3 177 2.3 177

Indicated 12.7 1.6 647 2.0 788

Measured & Indicated 15.1 1.7 824 2.0 965

Inferred 8.6 1.2 342 1.6 436

Recommended(2) Measured 1.4 3.6 161 3.6 161

Indicated 8.7 2.1 590 2.6 725

Measured & Indicated 10.1 2.3 751 2.7 886

Inferred 5.2 1.8 291 2.3 382

1.0 Measured 0.8 5.6 148 5.6 148

Indicated 6.0 2.8 530 3.4 655

Measured & Indicated 6.8 3.1 678 3.7 803

Inferred 3.9 2.1 261 2.9 349

1.4 Measured 0.8 5.9 145 5.9 145

Indicated 4.7 3.3 497 4.1 610

Measured & Indicated 5.5 3.7 642 4.3 755

Inferred 3.4 2.3 250 3.0 333

(1) Cut-off grades for Altan Nar are AuEq and for Bayan Khundii are gold only.

(2) RPMGlobal recommended cut-off grade for Bayan Khundii is 0.6 g/t gold and Altan Nar is 0.7 g/t AuEq above a pit

and 1.4 g/t AuEq below the same pit shell.

* see Table 2 and Table 3 below for notes on individual deposit mineral resource estimates.

Statement of Individual Deposit Mineral Resources

Table 2 provides the Maiden Mineral Resource estimate for the Bayan Khundii deposit. The Maiden

Mineral Resource was estimated at a range of cut-off grades, however, RPMGlobal recommends

reporting at a 0.6 g/t gold cut-off grade.

Table 2. Bayan Khundii Gold Deposit – Maiden Mineral Resource Estimate Summary,

September 12, 2018

Cut-off

Grade (1)

Resource

Classification

Quantity

(Mt)

Grade

Au g/t

Gold

Koz

0.2 Measured 4.3 1.4 195

Indicated 13.5 0.9 384

Measured & Indicated 17.8 1.0 579

Inferred 12.7 0.6 225

0.4 Measured 2.4 2.3 177

Indicated 7.1 1.4 324

Measured & Indicated 9.5 1.6 501

Inferred 4.9 1.0 153

0.6 Measured 1.4 3.6 161

Indicated 3.7 2.3 272

Measured & Indicated 5.1 2.6 433

Inferred 1.8 1.9 105

1.0 Measured 0.8 5.6 148

Indicated 1.8 4.0 224

Measured & Indicated 2.6 4.5 372

Inferred 0.7 3.8 79

1.4 Measured 0.8 5.9 145

Indicated 1.4 4.7 212

Measured & Indicated 2.2 5.2 357

Inferred 0.5 4.4 74

Notes:

1. The Statement of Estimates of Mineral Resources has been compiled under the supervision of Mr. Jeremy Clark who is

a full-time employee of RPM and a Member of the Australian Institute of Geoscientists. Mr. Clark has sufficient

experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he

has undertaken to qualify as a Qualified Person as defined in the CIM Standards of Disclosure.

2. All Mineral Resources figures reported in the table above represent estimates based on drilling completed up to June

27, 2018. Mineral Resource estimates are not precise calculations, being dependen t on the interpretation of limited

information on the location, shape and continuity of the occurrence and on the available sampling results. The totals

contained in the above table have been rounded to reflect the relative uncertainty of the estimate. Rou nding may cause

some computational discrepancies.

3. Mineral Resources are reported on a dry in-situ basis.

4. The Mineral Resources is reported at a 0.6 g/t Au cut-off. Cut-off parameters were selected based on an RPM internal

cut-off calculator, which indicated that a break-even cut-off grade of 0.6 g/t Au, assuming an open cut mining method, a

gold price of USD $1500 per ounce, an open mining cost of USD $6 per tonne and a processing cost of USD $20 per

tonne milled and processing recovery of 95% Au.

5. Mineral Resources referred to above, have not been subject to detailed economic analysis and therefore, have not been

demonstrated to have actual economic viability.

A detailed Mineral Resource estimate for the Altan Nar gold-polymetallic project can be seen below

in Table 3. For further details on the Mineral Resource estimate please see the Company’s May 10,

2018 news release (click here).

Table 3 - Altan Nar Deposit – Mineral Resource Estimate Summary, May 7, 2018

Cut-

off

AuEq

g/t

Resource

Classi-

fication

Quantity

(Mt)

Grade Contained Metal

Au Ag Zn Pb AuEq Au Ag Zn Pb AuEq

g/t g/t g/t g/t g/t Koz Koz Kt Kt Koz

0.4 Indicated 5.6 1.8 13.5 0.6 0.5 2.6 323 2,412 33.2 29.9 464

Inferred 3.7 1.6 7.5 0.7 0.6 2.3 189 901 24.5 22.8 283

0.7 Indicated 5.0 2.0 14.8 0.6 0.6 2.8 318 2,350 31.6 29.0 453

Inferred 3.4 1.7 7.9 0.7 0.7 2.5 186 866 23.7 22.3 277

1.0 Indicated 4.2 2.3 16.6 0.7 0.7 3.2 306 2,212 28.6 27.4 431

Inferred 3.2 1.8 8.2 0.7 0.7 2.7 182 837 22.8 21.5 270

1.4 Indicated 3.3 2.7 18.9 0.8 0.8 3.8 285 2,002 24.9 25.2 398

Inferred 2.9 1.9 8.6 0.8 0.7 2.8 176 795 21.5 20.4 259

Notes:

1. The Mineral Resources have been constrained by topography and a cut -off of 0.7 g/t AuEq above a pit and 1.4 g/t

AuEq below the same pit shell.

2. The Mineral Resource Estimate Summary was compiled under the supervision of Mr. Jeremy Clark who is a full-time

employee of RPM and a Member of the Australian Institute of Geoscientists. Mr. Clark has sufficient experience that is

relevant to the style of mineralization and type of deposit under consideration and to the activity that he has undertaken to

qualify as a Qualified Person as defined in the CIM Standards of Disclosure.

3. All Mineral Resource figures reported in the table above represent estimates as at May 7, 2018. Mineral Resource

estimates are not precise calculations, being dependent on the interpretation of limited information on the location, shape

and continuity of the occurrence and on the available sampling results. The totals contained in the above table have been

rounded to reflect the relative uncertainty of the estimate. Rounding may cause some computational discrepancies.

4. Mineral Resource grades are reported in accordance with the CIM Standards.

5. Mineral Resources reported on a dry in-situ basis.

6. No dilution or ore loss factors have been applied to the reported Resource Estimate.

7. No allowances have been made for recovery losses that may occur should mining eventually result.

8. Gold Equivalent (“AuEq”) calculations assume metal prices of US $1,310 per ounce gold, US $18 per o unce silver,

and US $2,400 per tonne lead and US $3,100 per tonne zinc and processing recoveries as per below.

Background on the Khundii Gold Project

Erdene’s deposits are located in the Edren Terrane, within the Central Asian Orogenic Belt, host to

some of the world’s largest gold and copper-gold deposits. Although epithermal gold and porphyry

copper-gold deposits are well documented across the border in China and along the Belt’s westward

trend, exploration in Mongolia was limited until the mid-1990’s, when the country returned to

democracy and opened its’ doors to foreign exploration. Exploration since that time in southeast

Mongolia led to the discovery of the world-class Oyu Tolgoi gold-copper deposit. Erdene has been

the leader in exploration in Mongolia’s southwest over the past decade and is responsible for the

discovery of the Khundii Gold District. The Khundii Gold District is comprised of multiple high-

grade gold and base metal prospects, two of which are being considered for development: Bayan

Khundii and Altan Nar. In addition, the company discovered and defined a large molybdenum-copper

resource on the 100% owned, Zuun Mod project, 40 kilometres to the east.

Over the past two years, drilling at the Altan Nar and Bayan Khundii projects has revealed very high

gold grades, including intercepts up to 2,200 g/t gold over 1 metre within 14 metres of 158 g/t gold at

Bayan Khundii, and intercepts up to 101 g/t gold over 1 metre within 20 metres of 10.3 g/t gold at

Altan Nar. Outside of these two deposits, which will be the focus of a Preliminary Economic

Assessment study in Q4-2018, the Company continues its regional, district-scale exploration

program. The broader district, although still in its infancy, hosts the full spectrum of arc-related base

and precious metal systems, including copper-gold porphyries, intermediate sulphidation / carbonate

base metal gold deposits, and low sulphidation epithermal gold and gold-silver systems.

Qualified Person and Sample Protocol

The Resource Estimate included in this press release was prepared under the supervision of Jeremy

Clark, RPMGlobal Asia Limited. Mr. Clark is a Qualified Person within the meaning of such term

under NI 43-101; Mr. Clark is a Member of the Australian Institute of Geoscientists (MAIG)

Membership No 3567. Mr. Clark has reviewed this press release and consents to the inclusion in this

release of the matters disclosed based on Resource Estimate documents provide to the Company by

RPM. A NI 43-101 Mineral Resource Estimate and Technical Report for the Bayan Khundii deposit

will be filed on Erdene’s SEDAR page within 45 days of this news release.

Michael MacDonald, P.Geo. (Nova Scotia), Vice President Exploration for Erdene, is the Qualified

Person as that term is defined in National Instrument 43-101 and has reviewed and approved the non-

Resource Estimate technical information contained in this news release on behalf of Erdene. All

samples have been assayed at SGS Laboratory in Ulaanbaatar, Mongolia. In addition to internal

checks by SGS Laboratory, the Company incorporates a QA/QC sample protocol utilizing prepared

standards and blanks.

About Erdene

Erdene Resource Development Corp. is a Canada -based resource company focused on the

acquisition, exploration, and development of precious and base metals in underexplored and highly

prospective Mongolia. The Company has interests in four exploration licenses and a mining license

in Southwest Mongolia, where exploration success has led to the discovery and definition of the

Khundii Gold District. Erdene Resource Development Corp. is listed on the Toronto and Mongolia

stock exchanges. Further information is available at www.erdene.com. Important information may be

disseminated exclusively via the website; investors should consult the site to access this information.

Forward-Looking Statements

Certain information regarding Erdene contained herein may constitute forward-looking statements

within the meaning of applicable securities laws. Forward-looking statements may include estimates,

plans, expectations, opinions, forecasts, projections, guidance or other statements that are not

statements of fact. Although Erdene believes that the expectations reflected in such forward-looking

statements are reasonable, it can give no assurance that such expectations will prove to have been

correct. Erdene cautions that actual performance will be affected by a number of factors, most of

which are beyond its control, and that future events and results may vary substantially from what

Erdene currently foresees. Factors that could cause actual results to differ materially from those in

forward-looking statements include market prices, exploitation and exploration res ults, continued

availability of capital and financing and general economic, market or business conditions. The

forward-looking statements are expressly qualified in their entirety by this cautionary statement. The

information contained herein is stated as of the current date and is subject to change after that date.

The Company does not assume the obligation to revise or update these forward-looking statements,

except as may be required under applicable securities laws.

NO REGULATORY AUTHORITY HAS APPROVED OR DISAPPROVED THE

CONTENTS OF THIS RELEASE

Erdene Contact Information

Peter C. Akerley, President and CEO, or

Ken W. MacDonald, Vice President and CFO

Phone: (902) 423-6419

E-mail: [email protected]

Website: www.erdene.com

Twitter: https://twitter.com/ErdeneRes