Equinox Gold Secures Long-Term Land Access Agreements with All Three Communities at Los Filos Mine, Planning and Technical Work Underway to Support Mine Restart and Annual Production Expansion
Equinox Gold Secures Long-Term Land Access Agreements with All Three
Communities at Los Filos Mine, Planning and Technical Work Underway to
Support Mine Restart and Annual Production Expansion
VANCOUVER, British Columbia, June 25, 2026 -- Equinox Gold Corp. (TSX: EQX, NYSE American: EQX) (“Equinox Gold” or
the “Company”) is pleased to announce that it has signed 20-year land access agreements with all three communities that
host its Los Filos Mine in Guerrero, Mexico (“Los Filos”). With these agreements in place, the Company has initiated activities
to support the gradual restart of heap leach operations and is advancing technical studies to evaluate potential expansion
opportunities.
Darren Hall, Chief Executive Officer of Equinox Gold, commented: “We appreciate the constructive engagement with the
communities of Carrizalillo, Mezcala and Xochipala that host our multi-million-ounce Los Filos Mine. These new 20-year
agreements reflect a shared commitment to responsible operations and sustainable benefits over time and provide an
important foundation for strengthening our long-term relationship with the communities and fostering an environment that
supports future investment and long-term value creation.
“With land access agreements in place, we will commence planning for the restart of heap leach operations, while continuing
to pursue our exploration programs and technical and engineering studies to assess longer-term development options,
including construction of a carbon-in-leach (“CIL”) processing facility.
“Los Filos is a world-class deposit, which based on the June 30, 2022 mineral reserve and resource estimation contains 5.4
million ounces of mineral reserves, 7.9 million ounces of measured and indicated mineral resources (exclusive of reserves), 3.2
million ounces of inferred mineral resources, and significant exploration upside. We believe there is meaningful potential to
expand the resource base and increase annual production over time. Our technical work will include an assessment of
opportunities to optimize and grow the operation, including evaluating increases to the envisioned CIL mill throughput relative to
previous studies, as well as updating project economics and development plans. The 2022 technical report was prepared using
a mineral reserve gold price assumption of US$1,450 per ounce, and we believe there may be opportunities to enhance project
economics through updated metal prices, as well as optimized operating assumptions and technical parameters (see October
19, 2022 news release ). We intend to advance this work through a phased, de-risking approach that reflects technical,
operational, permitting and stakeholder considerations, while maintaining collaborative engagement with our community
partners.”
In addition to the new surface land access agreements, the parties agreed to an overall policy on labour and supply services.
The Company is applying a disciplined, accountable and transparent approach to labour, contractor and community-related
arrangements as part of its broader commitment to responsible operations and stakeholder engagement. Restart activities
include environmental remediation, permitting, workforce rehiring and retraining, and supplier contract negotiations. The
Company is committed to upholding industry best practices for all its operations guided by globally recognized standards and
frameworks. Equinox Gold is a member of the Mining Association of Canada (“MAC”) and strives to diligently implement
MAC’s Towards Sustainable Mining (“TSM”) Protocols across its mining operations. The Company will continue to apply the
TSM Protocols at Los Filos and looks forward to future reporting on its performance.
The Company will provide updates on restart activities and development plans as technical work progresses. Equinox Gold has
not included any production from Los Filos in its 2026 production guidance of 700,000 to 800,000 ounces of gold.
About Equinox Gold
Equinox Gold (TSX: EQX, NYSE-A: EQX) is a Canadian mining company positioned for growth with a strong foundation of high
-quality, long-life gold operations in Canada and across the Americas, and a pipeline of development and expansion projects.
Founded and chaired by renowned mining entrepreneur Ross Beaty and guided by a seasoned leadership team with broad
expertise, the Company is focused on disciplined execution, operational excellence and long-term value creation. Equinox
Gold offers investors meaningful exposure to gold with a diversified portfolio and clear path to growth. Learn more at
www.equinoxgold.com or contact [email protected].
Equinox Gold Contact
Ryan King
EVP Capital Markets
T: 778.998.3700
E: [email protected] E: [email protected]
Qualified Person and Technical Information
The scientific and technical information contained in this news release was approved by Matthew MacPhail, P.Eng., Senior
Vice President Business Planning and Technical Services for Equinox Gold and a “Qualified Person” under National Instrument
43-101.
Los Filos Mineral Reserves Statement (June 30, 2022)
Classification Mining
Method
Tonnes
(kt)
Gold Grade
(g/t )
Contained
Gold
(koz)
Silver Grade
(g/t)
Contained
Silver
(koz)
Proven Open Pit 35,154 0.74 837 5.0 5,677
Underground 299 4.15 40 13.7 132
Total 35,453 0.77 877 5.1 5,809
Probable Open Pit 145,476 0.62 2,921 6.3 29,303
Underground 12,297 3.94 1,556 18.9 7,458
Total 157,773 0.88 4,477 7.2 36,761
Proven & Probable Open Pit 180,629 0.65 3,758 6.0 34,980
Underground 12,597 3.94 1,596 18.7 7,590
Total 193,226 0.86 5,354 6.9 42,570
Notes: Mineral Reserves have been estimated in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves (2014), which are incorporated by
reference in NI 43-101. The open pit Mineral Reserve estimate was prepared under the oversight and review of Mr. Eugene Tucker, P.Eng., and the underground Mineral
Reserve estimate was prepared under the oversight and review of Mr. Paul Salmenmaki, P.Eng. Mr. Tucker and Mr. Salmenmaki are “Qualified Persons” as defined by NI 43-
101. Mineral Reserves are estimated using a long-term gold price of $1,450 per troy oz and a long-term silver price of $18 per troy oz for all mining areas. Mineral Reserves
are stated in terms of delivered tonnes and grade before process recovery. Mineral Reserves are defined by pit optimization and are based on variable break-even cut-offs
as generated by process destination and metallurgical recoveries. Metal recoveries are variable dependent on metal head grades as outlined in the Technical Report. Open pit
dilution is applied at 5% at a zero grade for Au and Ag for Bermejal Open Pit and Guadalupe Open Pit, and 7% at zero grade for Au and Ag for Los Filos Open Pit. Open pit
mining recovery is applied at 95% for Bermejal Open Pit and Guadalupe Open Pit, and 93% for Los Filos Open Pit. Heap leach process recovery varies based on rock type.
The Qualified Persons responsible for this item of the Technical Report are not aware of any mining, metallurgical, infrastructure, permitting or other relevant factors that
could materially affect the Mineral Reserve estimates. Effective date of Mineral Reserves is June 30, 2022. Tonnage and grade measurements are in metric units. Contained
gold and silver ounces are reported as troy ounces. Underground Mineral Reserves are reported based on a variable net processing return cut-off value varying between
$65.8 and $96.6/t. Underground dilution is assigned an average of 10% at a zero grade for gold and silver. Underground mining recovery is set to 97%. Numbers may not
sum due to rounding. Additional details regarding the Mineral Reserve estimation, classification, reporting parameters, key assumptions and associated risks for Los Filos are
provided in the Feasibility Study. In addition, Mineral Reserves and Mineral Resources may be materially affected by legal, political, environmental and other risks, including
the factors identified in the Company’s Annual Information Form dated March 24, 2022 for the year ended December 31, 2021. See Cautionary Notes.
Los Filos Mineral Resources Statement (June 30, 2022) (Exclusive of Mineral Reserves)
Area Classification Tonnes
(kt)
Gold Grade
(g/t)
Contained
Gold (koz)
Silver Grade
(g/t)
Contained
Silver (koz)
Bermejal / Guadalupe Open Pit Measured 9,898 0.76 243 6.4 2,034
Indicated 184,152 0.59 3,492 7.6 45,186
Measured &
Indicated
194,050 0.60 3,734 7.6 47,220
Inferred 44,292 0.55 777 9.8 13,932
Bermejal Underground
(below $1,500 pit shell)
Measured - - - - -
Indicated 998 3.97 127 16.3 522
Measured &
Indicated
998 3.97 127 16.3 522
Inferred 1,501 4.98 241 22.7 1,093
Los Filos Open Pit Measured 35,327 1.09 1,238 6.4 7,315
Indicated 90,544 0.79 2,290 6.5 18,857
Measured &
Indicated
125,870 0.87 3,528 6.5 26,172
Inferred 87,552 0.68 1,914 7.7 21,657
Los Filos Underground Measured 2,081 4.13 276 22.8 1,527
Indicated 2,326 3.09 231 25.7 1,920
Measured &
Indicated
4,407 3.58 507 24.3 3,446
Inferred 2,590 3.67 306 27.5 2,287
Total Measured 47,306 1.15 1,757 7.2 10,876
Indicated 278,020 0.69 6,140 7.4 66,485
Measured &
Indicated
325,326 0.75 7,897 7.4 77,360
Inferred 135,935 0.74 3,237 8.9 38,969
Notes: Mineral Resources are exclusive of Mineral Reserves and have been estimated in accordance with CIM Definition Standards for Mineral Resources and Mineral
Reserves (2014), which are incorporated by reference in NI 43-101. The Mineral Resource estimate was prepared under the oversight and review of Mr. Ali Shahkar, P.Eng., a
“Qualified Person” as defined by NI 43-101. Mineral Resources that are not Mineral Reserves do not have a demonstrated economic viability. Mineral Resources are reported
to a gold price of $1,550/oz. Open pit Mineral Resources are defined within pit shells that use variable mining and recovery estimates depending on the geometallurgical
domain and whether mineralization is projected to report to crush-leach or is considered typical run-of-mine for processing requirements. Open pit Mineral Resources are
reported to a gold cut-off grade of 0.2 g/t. Open pit Mineral Resources use variable mining costs of $1.27-$1.43/t and variable processing costs of $3.40-$12.81/t. Recovery
ranges from 50% to 85% depending on ore treatment method. Underground Mineral Resources use variable mining costs of $57.21-$93.12/t and variable processing costs of
$9.53-$11.64/t, and a process recovery of 90%-95%. Underground Mineral Resources are reported to a gold cut-off grade of: Los Filos South Underground 1.71 g/t gold; Los
Filos North Underground 2.05 g/t gold; Bermejal underground 2.71 g/t gold. Quantity of material is rounded to the nearest 1,000 tonnes; grades are rounded to two decimal
places for gold, one decimal place for silver. Numbers may not sum due to rounding. Additional details regarding the Mineral Resource estimation, classification, reporting
parameters, key assumptions and associated risks for Los Filos are provided in the Feasibility Study. In addition, Mineral Reserves and Mineral Resources may be
materially affected by legal, political, environmental and other risks, including the factors identified in the Company’s Annual Information Form dated March 24, 2022 for the
year ended December 31, 2021. See Cautionary Notes .
Cautionary Notes & Forward-Looking Statements
This news release includes forward-looking information and forward-looking statements within the meaning of applicable securities laws and may include future-oriented financial
information or financial outlook information (collectively “Forward-looking Information”). Actual results of operations and the ensuing financial results may vary materially from the
amounts set out in any Forward-looking Information. Forward-looking Information in this news release includes: the Company’s expectations for the restart of its operations in
Mexico (“Los Filos”), exploration potential, production capabilities, completion of technical and engineering studies, growth potential, expansion projects and future financial or
operating performance of Los Filos, including shareholder returns therefrom; timing, receipt and anticipated effects of approvals for the restart of Los Filos, if any, exploration
and expansion; and receipt of required approvals and permits. Forward-looking Information is typically identified by words such as “believe”, “will”, “grow”, “plan”, “expect”,
“estimate”, “advance”, “commence”, “continue” and similar terms, including variations like “may”, “could”, or “should”, or the negative connotation of such terms. While the
Company believes these expectations are reasonable, they are not guarantees and undue reliance should not be placed on them. Forward-looking Information is based on the
Company’s current expectations and assumptions, including: achievement of exploration, production, cost and development objectives; stable gold prices and input costs in line
with the assumptions utilized in the estimation of Mineral Reserves and Mineral Resources; availability of funding; accuracy of Mineral Reserve and Mineral Resource estimates;
successful implementation of long-term agreements with Los Filos communities and no material disruptions during the term of such agreements; adherence to mine plans and
schedules; expected ore grades and recoveries; absence of labour disruptions or unplanned delays; productive relationships with workers, unions and communities;
maintenance and timely receipt of permits and regulatory approvals; compliance with environmental and safety regulations; optimized operating assumptions and technical
parameters, and constructive engagement with community partners. While the Company considers these assumptions reasonable, they may prove incorrect. Forward-looking
Information involves numerous risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such
Forward-looking Information. Such factors include certain risks and uncertainties described in the section “Risk Factors” in the Company’s MD&A for the year ended December
31, 2025, and in the section titled “Risks Related to the Business” in Equinox Gold’s most recently filed Annual Information Form which is available on SEDAR+ at
www.sedarplus.ca and on EDGAR at www.sec.gov/edgar . Forward-looking Information reflects management’s current expectations for future events and is subject to change.
Except as required by applicable law, the Company assumes no obligation to update or to publicly announce the results of any change to any Forward-looking Information
contained or incorporated by reference to reflect actual results, future events or developments, changes in assumptions or other factors affecting Forward-looking Information. If
the Company updates any Forward-looking Information, no inference should be drawn that the Company will make additional updates with respect to those or other Forward-
looking Information. All Forward-looking Information contained in this news release is expressly qualified by this cautionary statement.
Cautionary Note to U.S. Readers Concerning Estimates of Mineral Reserves and Mineral Resources
Disclosure regarding the Company's mineral properties included in this news release, was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for
Mineral Projects (“NI 43-101”). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of
scientific and technical information concerning mineral projects. NI 43-101 differs significantly from the disclosure requirements of the Securities and Exchange Commission (the
“SEC”) generally applicable to U.S. companies. Accordingly, information contained in this news release is not comparable to similar information made public by U.S. companies
reporting pursuant to SEC disclosure requirements.