Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQX.TO ·

Equinox Gold Announces Positive Drill Results from Tatajuba Target at Aurizona

Drill Results

TSX-V: EQX

OTC: EQXFF

Suite 730 – 800 West Pender St., Vancouver, BC Canada V6C 2V6

[email protected] +1 604.558.0560 www.equinoxgold.com

NEWS RELEASE

Equinox Gold Announces Positive Drill Results from Tatajuba Target at Aurizona

September 5, 2018 – Vancouver, BC – Equinox Gold Corp. (TSX-V: EQX, OTC: EQXFF) (“Equinox Gold” or “the

Company”) is pleased to announce positive exploration drill results from the Tatajuba target (“Tatajuba”) at

the Company’s 100%-owned Aurizona Gold Mine (“Aurizona”) in Brazil.

Tatajuba is the western extension of the main Piaba Trend that hosts Aurizona. Previous exploration work

has defined a target more than 4 kilometres in length. This drill program focused on a 600-metre (“m”) long

portion of Tatajuba where historical drilling identified significant gold mineralization in the shallow saprolite

zone. Each of the 12 drill holes (1,804 m) intersected the gold zone, extending gold mineralization to depths

up to 150 m from surface and confirming continuity of mineralization into the deeper fresh rock.

Tatajuba Drill Highlights

• 1.25 grams per tonne gold (“g/t Au”) over 44.0 m and 4.37 g/t Au over 38 m in hole D644

• 1.36 g/t Au over 37.0 m in hole D645

• 1.17 g/t Au over 29.0 m and 2.06 g/t Au over 5.0 m in hole D646

• 1.96 g/t Au over 35.0 m in hole D647

• 1.11 g/t Au over 22.2 m in hole D648

• 2.18 g/t Au over 8.0 m in hole D650

• 1.42 g/t Au over 19.0 m in hole D651

• 2.55 g/t Au over 10.4 m, 1.07 g/t Au over 9.8 m, and 1.66 g/t Au over 6.0 m in hole D652

• 1.11 g/t Au over 28.4 m in hole D653

• 2.09 g/t Au over 20.0 m in hole D654

• For a map of Tatajuba drill results, click here

• For two cross sections of Tatajuba drill holes, click here

• For a table of Tatajuba drill results, click here

“Tatajuba drilling has delivered excellent results with continuity and grades typical of the Piaba gold deposit,”

said Scott Heffernan, EVP Exploration for Equinox Gold. “Only about 15% of the 4-kilometre-long target has

been tested to date, h ighlighting the potential for significant resource expansion along strike from existing

reserves and confirming our belief in the potential of the Aurizona camp.”

Gold mineralization at Tatajuba is characteristically the same as that at the Piaba gold deposit that is currently

being mined. North -northeast crosscutting structures appear to enhance gold grades and add a new

structural control in this portion of the Piaba T rend. The Aurizona exploration team is undertaking detailed

surface mapping to integrat e with oriented core data collected during this recent program to update the

Tatajuba structural model and plan for additional exploration in 2019.

On behalf of the Board of Equinox Gold Corp.

“Christian Milau”

CEO & Director

- 2 -

About Equinox Gold

Equinox Gold is a Canadian mining company with a multi-million-ounce gold resource base and near-term

and growing gold production from two past -producing mines . Construction is well advanced at the

Company’s Aurizona Gold Mine in Brazil with the target of pouring gold by year-end 2018, and the Company

is advancing its Castle Mountain Gold Mine in California with the objective of commissioning Stage 1

operations by the end of 2019. Further information about Equinox Gold’s current portfolio of assets and long-

term growth strategy is available at www.equinoxgold.com or by email at [email protected].

Equinox Gold Contacts

Christian Milau, CEO

Rhylin Bailie, Vice President Investor Relations

Tel: +1 604-558-0560

Email: [email protected]

Qualified Person and Disclosure Statement

Scott Heffernan, M.Sc., P.Geo., the Company’s EVP Exploration and Qualified Person under National Instrument 43 -101,

has reviewed and verified that the technical information contained in this news release is accurate and approves the

written disclosure of the same. Drill composites were calculated using cut -off values of 0.3 g/t, 1.0 g/t or 5.0 g/t gold as

specified in the drill table and contain no more than 5 metres of internal waste. Drill intersections are calculated using

uncut assays and are reported as drilled thicknesses. True widths of the mineralized intervals are interpreted to be 60 to

90 percent of the reported lengths. All samples were submitted to ALS Chemex in Belo Horizonte, Brazil for sample

preparation. Sample pulps were then sent to ALS Chemex in Lima, Peru for geochemical analysis for gold by fire assay of

a 30-gram charge with an Atomic Absorption finish (AA) and for a 33 multi-element geochemical suite by 4-acid digestion

and Inductively -Coupled Mass Spectrometry ( ICP-MS). Samples with AA gold values over 10.0 g/t are re-assayed by

Screen Metallics fire assay . Control samples (accredited standards, blanks and duplicate samples at the field and

preparation stages) were inserted on a regular basis. Results were monito red upon receipt of assays.

Cautionary Notes and Forward-looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This document contains certain forward -looking information and forward -looking statements within the meaning of

applicable securities legislation (collectively “forward- looking statements”). The use of the words “will”, “potential”,

“objective”, and similar expressions are intended to identify forward -looking statements. Forward- looking statements

contained in this press release include statements regarding planned exploration and development activities at the

Company’s projects. Although Equinox Gold believes that the expectations reflected in such forward-looking statements

and/or information are reasonable, undue reliance should not be placed on forward- looking statements since Equinox

Gold can give no assurance that such expectations will prove to be correct. These statements involve known and unknown

risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated

in such forward- looking statements, including the risks, uncertainties and other fac tors identified in Equinox Gold’s

periodic filings with Canadian securities regulators, and assumptions made with regard to the Company’s ability to

complete construction at Aurizona and commence production, the timing to achieve production at Aurizona, and the

ability to achieve the results anticipated in the Aurizona feasibility study ; the ability to restart production at Castle

Mountain, timing of the anticipated restart of production, and the ability to achieve the results anticipated in the Castle

Mountain prefeasibility study ; the impact of current and future exploration at Aurizona, and the ability to expand the

Aurizona resource base and extend the mine life with exploration success. Furthermore, the forward-looking statements

contained in this news release are made as at the date of this news release and Equinox Gold does not undertake any

obligations to publicly update and/or revise any of the included forward- looking statements, whether as a result of

additional information, future events and/or otherwise, except as may be required by applicable securities laws