Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQTY.V ·

Equity Reports Additional High-Grade Mineralization at the Camp and Sveinson Targets, Silver Queen Project, BC; Drilling Resumes

Drill Results

Equity Reports Additional High-Grade

Mineralization at the Camp and Sveinson

Targets, Silver Queen Project, BC; Drilling

Resumes

Vancouver, British Columbia--(Newsfile Corp. - May 18, 2022) -

Equity Metals Corporation (TSXV:

EQTY) ("Equity")

reports thick intercepts of mineralization in both lateral step-outs to the Camp Vein

and at depth in the Sveinson Target from recent drilling on the Silver Queen property, BC.

Drill highlights Include:

a

0.6 metre

interval grading

2.1g/t Au

,

1,705g/t Ag, 4.3% Cu, 1.6% Pb

and

4.1% Zn (32.9g/t

AuEq or 2,470g/t AgEq)

within

a

1.2 metre

interval averaging

1.0g/t Au, 802g/t Ag

,

2.1% Cu

,

0.8% Pb and

2.0% Zn (15.8g/t AuEq or 1,183g/t AgEq)

from drillhole

SQ22-072;

a

0.3 metre

interval grading 0.1g/t Au,

2,043g/t Ag

, 1.0% Pb and 0.6% Zn

(28.1g/t AuEq or

2,110g/t AgEq)

within

a

7.7 metre

interval averaging

274g/t Ag,

0.1% Pb and 0.3% Zn

(3.9g/t

AuEq or 294g/t AgEq)

from drillhole

SQ22-073;

and

a

0.3 metre

interval grading

1,496g/t Ag

, 0.1% Cu, 0.1% Pb and 0.6% Zn

(20.4g/t AuEq or

1,534g/t AgEq)

within

a

3.8 metre

interval averaging

219g/t Ag,

and 0.1% Zn

(3.0g/t AuEq or

225g/t AgEq)

from drillhole

SQ22-075.

These assay results are from the final four holes of the Winter '22 drill program on the Camp, Sveinson

and NG-3 targets. Bonanza-grade mineralization was identified in all three of these holes (SQ22-073, -

074 and -075) along the western margin of the Camp Vein target, extending the lateral projection of

several veins for an additional 40 metres with intercepts up to 150 metres below surface. Several

intercepts form composites of thicker mineralized intervals up to 7.7 metres downhole. Mineralization in

the Camp Vein target remains open to the west and at depth, which will be further tested in 2022.

A fourth hole (SQ22-072) tested an approximate 200 metre width of the Sveinson target, intersecting

three main clusters of mineralized veins to depths of up to 335 metres below surface. These represent

significant step-outs from previously drilled intercepts in the western portion of the Sveinson target.

Intercepts are generally more gold-enriched than intercepts in the Camp Vein and return higher base

metal contents.

VP Exploration Rob Macdonald commented,

"These results mark the completion of the Winter '22 drill

program on the Silver Queen project, which successfully confirmed a 300 metre projection of the NG-

3 vein to depths of up to 390 metres below surface; identified the western and currently open-ended

projection of the Camp Vein target; and confirmed the continuity of several gold-silver-mineralized

structures in the transition eastward from the Camp Vein into the Sveinson target. Compilation of this

and earlier data continues toward the preparation of a mineral resource update in the coming months.

Numerous veins remain open for testing across the 6 sq. km. target area, which will form the basis of

additional drill testing in 2022."

Figure 1: Plan Map of targets on the Silver Queen vein system, BC

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/5566/124413_8cd1bcf774ae4b11_002full.jpg

Figure 2: Plan View Camp-Sveinson Targets showing AgEq values in composites. Note the

multiple veins structures identified through the Camp and Sveinson targets.

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/5566/124413_8cd1bcf774ae4b11_003full.jpg

New Drilling on Silver Queen

The Company also reported that following the completion of the winter drill program, an additional

1,500m core hole program on the Silver Queen property is now underway. Drilling will continue to test the

western extension of the Camp Vein target and the western margin of the Sveinson Target structure, and

drilling should be completed over the coming weeks.

President Joe Kizis explained,

"This limited drilling program is specifically testing three possible vein

projections that are based on our on-going modeling. These are projections of veins beyond the limits

of drilling that will be included in our independent resource and success in these holes should provide

us with the guidance to further expand the resource base at Silver Queen during our planned Fall

2022 drilling."

Table 1: Summary Composites from Winter '22 Drilling on the Camp-Sveinson Targets

Hole #

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Ag

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

AuEq

(g/t)

AgEq

(g/t)

Comments

SQ22-072

82.5

83.2

0.7

4.5

232

0.5

0.1

0.2

8.4

633

SQ22-072

160.7

162.5

1.8

0.7

47

0.8

0.1

0.5

2.7

200

43% dilution

inc.

160.7

161.5

0.8

1.5

68

1.3

0.1

0.8

4.5

339

SQ22-072

215.7

216.6

0.9

1.5

31

0.0

1.3

5.6

5.3

400

SQ22-072

348.2

350.2

2.0

0.7

19

0.1

0.2

2.0

2.1

161

60% dilution

inc.

348.2

348.7

0.5

1.7

40

0.0

0.7

6.7

5.9

445

SQ22-072

377.7

378.8

1.1

0.8

199

0.5

3.6

3.1

7.3

544

inc.

377.7

378.1

0.4

1.3

427

1.0

7.1

3.2

13.2

989

SQ22-072

385.4

386.4

1.0

0.3

72

0.0

1.4

6.7

5.4

402

SQ22-072

396.0

397.2

1.2

1.0

802

2.1

0.8

2.0

15.8

1183

inc.

396.3

396.8

0.6

2.1

1705

4.3

1.6

4.1

32.9

2470

SQ22-073

71.2

72.6

1.4

0.2

228

0.0

0.1

0.8

3.7

277

inc.

71.5

71.8

0.3

0.3

396

0.1

0.1

2.2

6.9

516

SQ22-073

91.1

92.9

1.8

0.0

139

0.0

0.0

0.1

1.9

143

37% Dilution

inc.

92.7

92.9

0.3

0.0

717

0.0

0.0

0.1

9.7

726

SQ22-073

138.1

139.9

1.8

0.1

173

0.0

0.1

0.4

2.7

201

inc.

138.1

138.4

0.3

0.6

301

0.0

0.2

0.6

5.0

374

SQ22-073

161.7

169.4

7.7

0.0

274

0.0

0.1

0.3

3.9

294

inc.

169.1

169.4

0.3

0.1

2043

0.0

1.0

0.6

28.1

2110

SQ22-074

44.3

44.8

0.5

1.2

1470

0.1

0.2

0.8

21.3

1600

SQ22-074

78.2

78.9

0.7

0.0

184

0.0

0.0

0.0

2.5

187

SQ22-074

206.3

206.5

0.3

0.7

54

0.0

0.8

4.3

3.9

295

SQ22-075

36.9

37.2

0.3

0.0

679

0.1

0.0

0.1

9.3

698

SQ22-075

81.4

85.2

3.8

0.0

219

0.0

0.0

0.1

3.0

225

inc.

84.4

84.6

0.3

0.0

1496

0.1

0.1

0.6

20.4

1534

SQ22-075

158.8

159.4

0.7

0.2

169

0.0

3.4

6.8

7.4

556

inc.

159.2

159.4

0.3

0.4

390

0.1

7.0

16.1

17.0

1275

Samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead and zinc (>1%)

overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav.

Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average reported.

Composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Reported intervals are core lengths,

true widths undetermined or estimated. Accuracy of results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates

into the sample stream. AuEq and AgEq were calculated using prices of $1,500/oz Au, $20/oz Ag, $2.75/lb Cu, $1.00/lb Pb and $1.10/lb Zn. AuEq

and AgEq calculations did not account for relative metallurgical recoveries of the metals.

About Silver Queen Project

The Silver Queen Project is a premier gold-silver property with over 100 years of historic exploration and

development and is located adjacent to power, roads and rail with significant mining infrastructure that

was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a

Hunt Brothers company). The property contains an historic decline into the No. 3 Vein, camp

infrastructure, and a maintained Tailings Facility.

The Silver Queen Property consists of 45 mineral claims, 17 crown grants, and two surface crown grants

totalling 18,852ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins

distributed over a 6 sq km area. An initial NI43-101 Mineral Resource Estimate was detailed in a News

Release issued on July 16th, 2019 and is hosted by the No. 3 Vein, which is traced by drilling for

approximately 1.2km and then to the southeast where it transitions into the NG-3 Vein close to the buried

Itsit copper-molybdenum porphyry.

More than 20 different veins have been identified on the property, forming an extensive network of zoned

Cretaceous- to Tertiary-age epithermal veins. The property remains largely under explored.

About Equity Metals Corporation

Equity Metals Corporation is a Manex Resource Group Company. Manex provides exploration,

administration, and corporate development services for Equity Metals' two major mineral properties, the

Silver Queen Au-Ag-Zn-Cu project,

located in central B.C., and the

Monument Diamond project

,

located in Lac De Gras, NWT. The Company also has a 1% royalty (Greenwood Royalty) and a 100%

working interest in the La Ronge Silica Project.

The Company owns 100% interest, with no underlying royalty, in the

Silver Queen project,

located

along the Skeena Arch in the Omineca Mining Division, British Columbia. The property hosts high-grade,

precious- and base-metal veins related to a buried porphyry system, which has been only partially

delineated. The Company also has a controlling JV interest in the

Monument Diamond project

,

NWT

,

strategically located in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond

mines. The project owners are Equity Metals Corporation (57.49%), Chris and Jeanne Jennings

(22.11%); and Archon Minerals Ltd. (20.4%). Equity Metals is the operator of the project.

The 100% controlled La Ronge Silica Project is an historic sand quarry located in central Saskatchewan,

approximately 60 kilometers south-southeast of La Ronge, Saskatchewan and 210 kilometers west of

Flin Flon, Manitoba. Preliminary studies indicate the silica deposit may be developed into a simple and

profitable, low-cost mining and washing operation to produce high-purity silica (>98% SiO2), a specialty

product for the EV battery industry.

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person

as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the

Silver Queen project and for the preparation of the technical information in this disclosure.

On behalf of the Board of Directors

"Joseph Anthony Kizis, Jr."

Joseph Anthony Kizis, Jr., P.Geo

President, Director, Equity Metals Corporation

For further information, visit the website at

https://www.equitymetalscorporation.com

; or contact us at

604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements. Forward-looking statements

address future events and conditions and therefore involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements. Factors that could

cause actual results to differ materially from those in forward looking statements include the timing

and receipt of government and regulatory approvals, and continued availability of capital and

financing and general economic, market or business conditions.

Equity Metals Corporation does not

assume any obligation to update or revise its forward-looking statements, whether as a result of new

information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/124413