Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQTY.V ·

Equity Metals Continues to Identify High-Grade Silver at the Camp Vein, Reports 8.6 Metres Averaging 361g/t Ag, 0.3g/t Au, 0.8% Cu, 0.6% Pb and 1.2% Zn (522g/t AgEq) at the No. 5 Vein, Silver Queen Project, BC

Drill Results

Equity Metals Continues to Identify High-Grade

Silver at the Camp Vein, Reports 8.6 Metres

Averaging 361g/t Ag, 0.3g/t Au, 0.8% Cu, 0.6%

Pb and 1.2% Zn (522g/t AgEq) at the No. 5 Vein,

Silver Queen Project, BC

Vancouver, British Columbia--(Newsfile Corp. - March 31, 2021) -

Equity Metals Corporation (TSXV:

EQTY) ("Equity")

reports today high-grade assays from its Phase II drilling program on the Camp and

No. 5 vein systems on the Silver Queen Property, BC. The Company continues to identify bonanza-grade

silver mineralization at the

Camp Vein

and announces new high-grade intercepts

from the

No. 5 Vein

.

New highlights from the

Camp Vein system

include:

a

0.5 metre

interval averaging

5,002g/t Ag, 0.1g/t Au, 1.6% Cu

and

1.1% Zn (5,225g/t AgEq or

69.7g/t AuEq)

within a

1.4 metre

interval averaging

2,562g/t Ag, 0.5g/t Au,

and

1.9% Zn

(2,712g/t AgEq or 36.2g/t AuEq)

from drill hole

SQ20-015;

a deeper

1.8 metre

interval averaging

731g/t Ag, 0.3g/t Au, 2.3% Pb and 2.1% Zn (916g/t

AgEq or 12.2g/t AuEq)

from drill hole

SQ20-015;

and

a shallow

0.4 metre

hangingwall interval averaging

1,309g/t Ag, 0.3% Pb and 1.7% Zn (1,420g/t

AgEq or 18.9g/t AuEq)

from drill hole

SQ20-012.

Mineralization in hole SQ20-015 is a 50m lateral step-out from a previously reported bonanza-grade

intercept in drill hole

SQ20-010 (4.4m averaging 4,632g/t Ag and 0.2g/t Au, 0.4% Pb and 1.2% Zn;

see NR-12-20)

and verifies the projection of silver-enriched mineralization plunging shallowly to the

southeast.

Drilling on the

No. 5 Vein system

intersected three veins with high- to bonanza-grade silver

mineralization:

an

8.6 metre

interval averaging

361g/t Ag, 0.3g/t Au, 0.8% Cu, 0.6% Pb

and

1.2% Zn

(522g/t AgEq or 7.0g/t AuEq),

including

a

0.3 metre

interval averaging

1,357g/t Ag, 0.5g/t

Au, 0.5% Cu, 7.5% Pb and 16.3% Zn (2,318g/t AgEq or 30.9g/t AuEq)

from drill hole

SQ20-

017;

a

1.3 metre

interval averaging

687g/t Ag, 0.7g/t Au, 0.3% Cu, 0.6% Pb

and

9.3% Zn

(1,137g/t AgEq or 15.2g/t AuEq)

from drill hole

SQ20-017;

and

a

3.3 metre

interval averaging

229g/t Ag, 0.7g/t Au, 0.8% Cu, 0.1% Pb

and

1.9% Zn

(427g/t

AgEq or 5.7g/t AuEq)

from drill hole

SQ20-017;

The intersected veins can be traced laterally on surface and in historic drilling, and have also been

mapped in the Earl Adit workings, which was actively mined in the 1970's. Four individual veins have

been identified to date, forming a set of WNW-ESE-trending veins that transect the Silver Queen mine

site and the Mine Hill area. This easterly trending vein set intersects the northwesterly trending Camp

and No. 3/NG-3 structures, and clusters of high-grade mineralization are localized at these intersections.

VP Exploration Rob Macdonald commented,

"Evaluation of this potentially important ESE structural

control on projections of historic drill intercepts is ongoing at the Camp Vein system and is being

expanded property wide to include several prospective mineral showings for testing in a 2021 Phase

IV exploration drilling program, which is currently being planned."

Figure 1: Plan Map of Phase I+II Drilling on the Camp and No. 5 Veins

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/5566/79079_28d439f6c4067972_002full.jpg

Figure 2: Phase I+II Longitudinal Section of the Camp Vein drilling

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/5566/79079_28d439f6c4067972_003full.jpg

Phase III Drilling Near Completion

The Company also reports that the Phase III drilling program on the property is nearing completion. Ten

core holes totalling 4,075 metre of drilling have been completed in Phase III drilling to date with all ten

holes targeting extensions to the No 3 and NG-3 vein systems (see sites SQ21-019 to -028 in Figure 3).

Drilling has shifted to the Camp Vein/No. 5 area for a final 2 or 3 holes.

Drilling successfully identified mineralized extensions of the No. 3 Vein and the NG-3 Vein, both along

strike and down dip. Samples have been submitted for analyses and assays are pending.

Figure 3: Phase I, II and III Drilling at the Silver Queen Project near Houston, British Columbia

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/5566/79079_28d439f6c4067972_004full.jpg

About Silver Queen Project

The Silver Queen Project is a premier gold-silver property with over 100 years of historic exploration and

development and is located adjacent to power, roads and rail with significant mining infrastructure that

was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a

Hunt Brothers company). The property contains an historic decline into the No. 3 Vein, camp

infrastructure, and a maintained Tailings Facility.

The Silver Queen Property consists of 45 mineral claims, 17 crown grants, and two surface crown grants

totalling 18,852ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins

distributed over a 6 sq km area. Most of the existing resource is hosted by the No. 3 Vein, which is

traced by drilling for approximately 1.2km and to the southeast transitions into the NG-3 Vein close to the

buried Itsit copper-molybdenum porphyry.

An initial NI43-101 Mineral Resource Estimate (

see Note 1 below

) was detailed in a News Release

issued on July 16th, 2019, and using a CDN$100 NSR cut-off, reported a resource of:

Indicated - 244,000ozs AuEq:

85,000ozs Au, 5.2Mozs Ag, 5Mlbs Cu, 17Mlbs Pb and 114Mlbs

Zn; and

Inferred - 193,000ozs AuEq:

64,000ozs Au, 4.7Mozs Ag, 5Mlbs Cu, 16Mlbs Pb and 92Mlbs Zn.

More than 20 different vein structures have been identified on the property, forming an extensive network

of zoned Cretaceous- to Tertiary-age epithermal veins. The property remains largely under explored.

Table 1: Select Drill Intercepts from 2020 Phase II Drilling on the Silver Queen Property.

Hole #

From

(m)

To

(m)

Interval

(m)

Au

(g/t)

Ag

(g/t)

Cu

(%)

Pb

(%)

Zn

(%)

AuEq

(g/t)

AgEq

(g/t)

Comments

SQ20-011

NSV

NSV

NSV

NSV

NSV

NSV

NSV

NSV

NSV

NSV

SQ20-012

18.1

18.5

0.4

0.4

1309

0.1

0.3

1.7

18.9

1420

and

22.7

24.0

1.3

0.5

432

0.0

0.2

0.9

6.8

507

SQ20-013

217.5

218.0

0.5

0.0

147

0.0

0.1

0.2

2.1

159

SQ20-013

232.0

233.0

1.0

0.0

181

0.0

0.0

0.2

2.5

191

SQ20-014

117.0

122.4

5.4

0.4

53

0.0

0.2

0.8

1.6

118

46.7%

Dilution

inc.

122.0

122.4

0.3

0.3

545

0.0

0.5

1.5

8.6

644

and

155.9

156.3

0.4

0.3

80

0.0

0.4

7.5

5.4

403

SQ20-015

103.6

105.0

1.4

0.5

2562

0.7

0.0

1.1

36.2

2712

inc.

104.5

105.0

0.5

0.1

5002

1.7

0.1

1.5

69.7

5225

SQ20-015

110.0

122.0

12.0

0.1

53

0.0

0.3

1.5

1.8

131

0.5g/t AuEq

Cutoff

inc.

116.3

118.3

2.0

0.2

235

0.0

0.8

2.8

5.1

385

SQ20-015

162.1

163.8

1.8

0.3

731

0.0

2.3

2.1

12.2

916

inc.

163.0

163.8

0.8

0.2

1544

0.1

0.2

1.2

21.6

1619

SQ20-016

50.3

50.6

0.3

0.1

20

0.0

0.1

2.0

1.5

109

SQ20-016

122.1

122.4

0.3

0.3

18

0.0

1.4

0.6

1.5

112

SQ20-017

71.9

75.1

3.3

0.7

229

0.8

0.1

1.9

5.7

427

inc.

71.9

73.6

1.8

0.9

342

1.0

0.1

1.7

7.5

565

SQ20-017

110.0

111.3

1.3

0.7

687

0.3

0.6

9.3

15.2

1137

inc.

110.5

110.9

0.3

2.1

1887

0.7

1.3

26.2

41.8

3138

SQ20-017

121.6

130.2

8.6

0.3

361

0.8

0.6

1.2

7.0

522

0.5g/t AuEq

Cutoff

inc.

121.6

123.9

2.3

0.5

807

1.9

0.9

1.5

14.9

1116

and inc.

126.9

128.0

1.1

0.7

654

1.7

0.4

0.4

11.9

892

and inc.

129.5

129.8

0.3

0.5

1357

0.5

7.5

16.3

30.9

2318

SQ20-017

145.0

145.5

0.5

0.0

214

0.1

0.0

0.3

3.1

233

SQ20-017

174.3

175.5

1.3

0.0

100

0.1

0.0

0.1

1.5

114

SQ20-017

254.2

255.2

1.0

0.1

15

0.0

0.2

2.5

1.7

128

SQ20-018

62.9

64.0

1.1

0.0

23

0.2

0.1

1.6

1.4

101

SQ20-018

71.2

72.9

1.6

0.1

45

0.1

0.2

1.4

1.6

123

inc.

72.4

72.9

0.5

0.1

113

0.2

0.0

1.6

2.7

202

SQ20-018

119.1

120.0

0.9

0.1

154

0.1

0.2

9.6

7.2

539

inc.

119.1

119.4

0.3

0.2

354

0.3

0.4

9.7

10.3

774

Samples were analyzed by FA/AAS for gold and 48 element ICP-MS by MS Analytical, Langley, BC. Silver (>100ppm), copper, lead and zinc (>1%)

overlimits assayed by ore grade ICP-ES analysis, High silver overlimits (>1000g/t Ag) and gold overlimits (>10g/t Au) re-assayed with FA-Grav.

Silver >10,000g/t re-assayed by concentrate analysis, where a FA-Grav analysis is performed in triplicate and a weighed average reported.

Composites calculated using a 80g/t AgEq (1g/t AuEq) cut-off and <20% internal dilution, except where noted. Reported intervals are core lengths,

true widths undetermined. Accuracy of results is tested through the systematic inclusion of QA/QC standards, blanks and duplicates into the sample

stream. AuEq and AgEq were calculated using prices of $1,500/oz Au, $20/oz Ag, $2.75/lb Cu, $1.00/lb Pb and $1.10/lb Zn. AuEq and AgEq

calculations did not account for relative metallurgical recoveries of the metals.

About Equity Metals Corporation

Equity Metals Corporation is a Manex Resource Group Company. Manex provides exploration,

administration, and corporate development services for Equity Metals' two major mineral properties, the

Silver Queen Au-Ag-Zn-Cu project,

located in central B.C., and the

Monument Diamond project

,

located in Lac De Gras, NWT.

The Company owns 100% interest, with no underlying royalty, in the

Silver Queen project,

located

along the Skeena Arch in the Omineca Mining Division, British Columbia. The property hosts high-grade,

precious- and base-metal veins related to a buried porphyry system, which has been only partially

delineated. The Company also has a controlling JV interest in the

Monument Diamond project

,

NWT

,

strategically located in the Lac De Gras district within 40 km of both the Ekati and Diavik diamond

mines. The project owners are Equity Metals Corporation (57.49%), Chris and Jeanne Jennings

(22.11%); and Archon Minerals Ltd. (20.4%). Equity Metals is the operator of the project.

The Company also has royalty and working interests in other Canadian properties, which are being

evaluated further to determine their value to the Company.

1

.

The 2019 Silver Queen Resource Estimate was prepared following CIM definitions for classification of Mineral Resources and identified at a

CDN$100/NSR cut-off, an indicated resource of 815Kt averaging 3.2g/t Au, 201g/t Ag, 1.0% Pb, 6.4% Zn and 0.26% Cu and an inferred

resource of 801Kt averaging 2.5g/t Au, 184g/t Ag, 0.9% Pb, 5.2% Zn and 0.31% Cu. Grade capping on Ag and Zn was performed on 0.75m

to 1.24m length composites. Au, Cu and Pb required no capping. ID

3

was utilized for grade interpolation for Au and Ag while ID

2

was utilized

for Cu, Pb and Zn. Grade blocks were interpreted within constraining mineralized domains using and array of 3m x 1m x 3m blocks in the

model. A bulk density of 3.56 t/m³ was used for all tonnage calculations. Approximate US$ two-year trailing average metal prices as follows

were used: Au $1,300/oz, Ag $17/oz, Cu $3/lb, Pb $1.05/lb and Zn $1.35/lb with an exchange rate of US$0.77=C$1.00.

The C$100/tonne NSR cut-off grade value for the underground Mineral Resource was derived from mining costs of C$70/t, with process

costs of C$20/t and G&A of C$10/t. Process recoveries used were Au 79%, Ag 80%, Cu 81%, Pb 75% and Zn 94%. AuEq and AgEq are

based on the formula: NSR (CDN) = (Cu% * $57.58) + (Pb% * $19.16) + (Zn% * $30.88) +(Au g/t * $39.40) + (Ag g/t * $0.44) - $78.76.

Mineral Resources are not Mineral Reserves, do not have demonstrated economic viability and may be materially affected by environmental,

permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. Inferred Mineral Resources have a lower level of

confidence than Indicated Mineral Resources and may not be converted to a Mineral Reserve but may be upgraded to an Indicated Mineral

Resource with continued exploration. The Mineral Resources were estimated using the Canadian Institute of Mining, Metallurgy and

Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines.

The Mineral Resource Estimate was prepared by Eugene Puritch, P.Eng., FEC, CET and Yungang Wu, P.Geo., of P&E Mining Consultants Inc.

("P&E") of Brampton, Ontario, Independent Qualified Persons ("QP"), as defined by National Instrument 43-101. P&E Mining suggests that an

underground mining scenario is appropriate for the project at this stage and has recommended a CDN$100/tonne NSR cut-off value for the

base-case resource estimate.

Robert Macdonald, MSc. P.Geo, is VP Exploration of Equity Metals Corporation and a Qualified Person

as defined by National Instrument 43-101. He is responsible for the supervision of the exploration on the

Silver Queen project and for the preparation of the technical information in this disclosure.

On behalf of the Board of Directors

"Joseph Anthony Kizis, Jr."

Joseph Anthony Kizis, Jr. P.Geo

President, Director, Equity Metals Corporation

For further information, visit the website at

https://www.equitymetalscorporation.com

; or contact us at

604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements. Forward-looking statements

address future events and conditions and therefore involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements. Factors that could

cause actual results to differ materially from those in forward looking statements include the timing

and receipt of government and regulatory approvals, and continued availability of capital and

financing and general economic, market or business conditions.

Equity Metals Corporation does not

assume any obligation to update or revise its forward-looking statements, whether as a result of new

information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/79079