Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

EQTY.V ·

Equity Metals Commences Drilling on the Silver Queen Project, BC

Exploration Programs

Equity Metals Commences Drilling on the

Silver Queen Project, BC

Vancouver, British Columbia--(Newsfile Corp. - April 11, 2023) -

Equity Metals Corporation (TSXV:

EQTY) ("Equity" or "Company")

reports today that crews have mobilized and drilling has commenced

on the Company's 100% owned Silver Queen project, located in central British Columbia. This is the first

phase of a property wide exploration program that will focus on continued resource expansion of the

Camp and Sveinson deposits and the delineation of new targets throughout the property, including the

Company's initial drill-testing of the Cole Lake and George Lake vein systems.

The program will consist of up to 6000 metres of drilling in two separate phases to be carried out through

the Spring and early Summer. Additional surface soil sampling is also planned which will be used to

upgrade several historic targets in preparation for future drill testing.

Initial drilling will test a 200-metre extension of two veins in the Camp target and specifically western

step-outs from high-grade intercepts in drill hole

SQ22-078

(previously reported in NR-10-22; Sept 8,

2022) which include:

a

1.3 metre (0.9m est. TT)

interval grading

9.3g/t Au

,

1,998g/t Ag, 0.17% Cu, 2.2% Pb

and

6.8% Zn (41.8g/t AuEq or 3,136g/t AgEq)

within

a

7.5 metre

interval (5.2m est. TT) averaging

1.8g/t Au, 539g/t Ag

, 0.5% Pb and

1.8% Zn (10.4g/t AuEq or 778g/t AgEq);

and

a

0.4 metre (0.3m est TT)

interval grading 0.2g/t Au,

2,313g/t Ag

, 1.2% Pb and 1.0% Zn

(32.2g/t

AuEq or 2,411g/t AgEq)

within

a

6.8 metre

interval (4.7m est. TT) averaging

156g/t Ag,

0.1% Pb

and 0.1% Zn

(2.2g/t AuEq or 166g/t AgEq).

The identification of such strong

gold-enrichment

in the Camp target, which has traditionally returned

higher silver values relative to gold, further enhances the overall exploration potential of these vein

extensions.

The drilling program will also test down-dip of the Sveinson target, located to the east of the Camp

target, and then to other parts of the property, including the George Lake and Cole Lake vein systems

where historical drill results have partially delineated mineralization over several hundred metres of

potential strike-length and to depths of up to 450 metres below surface.

VP Exploration Rob Macdonald commented,

"The current drill program follows on the release of an

updated Mineral Resource Estimate on the Silver Queen property in December 2022, which

successfully doubled the mineral resources on a silver-equivalence basis with many mineralized

blocks remaining open for further resource expansion. Over 20 different veins have been identified on

the property, many with encouraging drill intercepts that have not been properly offset. Mineral

Resources have been defined on only four veins leaving extensive exploration potential remaining on

the property."

Figure 1: Plan map of targets and deposits on the Silver Queen vein system, BC

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/161991_483dd50a84a398d0_002full.jpg

Figure 2: Sveinson and Camp targets, looking south. Initial drilling in 2023 will test the western

extension of the Camp target and then down-dip projects of the Sveinson target.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5566/161991_483dd50a84a398d0_003full.jpg

About Silver Queen Project

The Silver Queen Project is a premier gold-silver property with over 100 years of historical exploration

and development and is located adjacent to power, roads and rail with significant mining infrastructure

that was developed under previous operators Bradina JV (Bralorne Mines) and Houston Metals Corp. (a

Hunt Brothers company). The Property contains two historical declines into the No. 3 Vein, camp

infrastructure, and a maintained Tailings Facility.

The Silver Queen Property consists of 45 mineral claims, 17 crown grants, and two surface crown grants

totalling 18,852ha with no underlying royalties. Mineralization is hosted by a series of epithermal veins

distributed over a 6 sq km area. An updated NI43-101 Mineral Resource Estimate was detailed in a

News Release issued on Dec. 1

st

, 2022 effectively doubled the mineral resources on the project on a

silver equivalency basis with contributions from four of these veins. More than 20 different veins have

been identified on the Property, forming an extensive network of zoned Cretaceous- to Tertiary-age

epithermal veins. The Property remains largely under explored.

About Equity Metals Corporation

Equity Metals Corporation is a Manex Resource Group Company. Manex provides exploration,

administration, and corporate development services for Equity Metals' two major mineral properties, the

Silver Queen Au-Ag-Zn-Cu project,

located in central B.C., and the

Monument Diamond project

,

located in Lac De Gras, NWT. The Company also has a 1% royalty (Greenwood Royalty) and a 100%

working interest in the La Ronge Silica Project.

The Company owns 100% interest, with no underlying royalty, in the

Silver Queen Project,

located

along the Skeena Arch in the Omineca Mining Division, British Columbia. The property hosts high-grade,

precious- and base-metal veins related to a buried porphyry system, which has been only partially

delineated. The Company also has a controlling JV interest in the

Monument Diamond project

,

NWT

,

strategically located in the Lac De Gras district within 40 km of both the Ekati and Diavik Diamond

Mines. The Project owners are Equity Metals Corporation (57.49%), Chris and Jeanne Jennings

(22.11%); and Archon Minerals Ltd. (20.4%). Equity Metals is the operator of the Project.

The 100% controlled La Ronge Silica Project is an historical sand quarry located in central

Saskatchewan, approximately 60 kilometers south-southeast of La Ronge, Saskatchewan and 210

kilometers west of Flin Flon, Manitoba. Preliminary studies indicate the silica deposit may be developed

into a simple and profitable, low-cost mining and washing operation to produce high-purity silica (>98%

SiO2), a specialty product for the EV battery industry.

On behalf of the Board of Directors

"Joseph Anthony Kizis, Jr."

Joseph Anthony Kizis, Jr., P.Geo

President, Director, Equity Metals Corporation

For further information, visit the website at

https://www.equitymetalscorporation.com

; or contact us at

604.641.2759 or by email at

[email protected]

.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements. Forward-looking statements

address future events and conditions and therefore involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements. Factors that could

cause actual results to differ materially from those in forward looking statements include the timing

and receipt of government and regulatory approvals, and continued availability of capital and

financing and general economic, market or business conditions.

Equity Metals Corporation does not

assume any obligation to update or revise its forward-looking statements, whether as a result of new

information, future events or otherwise, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/161991